What this opportunity is
NASA is procuring Allen-Bradley key switches to support control system upgrades at the Stennis Space Center, with a total small business set-aside under NAICS 334516. This requirement is strictly for brand-name hardware, and only authorized resellers of Allen-Bradley products may submit bids. Vendors should note that this is a combined synopsis/solicitation, indicating the need to track the opportunity closely rather than submit a formal bid immediately, and must include specific information such as CAGE/UEI code and lead time for delivery in their quotes.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK
1. Objective/Requirements
This procurement provides Allen-Bradley key switches required to support control system
upgrades at NASA Stennis Space Center. The hardware will be used to expand automation
capabilities, replace aging equipment, and standardize on Allen-Bradley platforms for
improved reliability, maintainability, and integration performance.
The items listed in this procurement include new key switches specifically selected to align
with NASA control system architecture and ongoing modernization efforts.
2. Scope
• This is hardware procurement only.
• The contractor shall supply and deliver all Allen-Bradley key switches listed in
this SOW.
• No installation, testing, integration, or configuration services are included.
• No additional hardware or accessories beyond what is listed shall be substituted.
3. Brand Recognition / Brand Name Justification
NASA Stennis Space Center has determined that Allen-Bradley key switches are uniquely
compatible with existing sitewide control systems. The following characteristics
necessitate the use of Allen-Bradley brand equipment:
• Native compatibility with installed Allen-Bradley racks and backplanes.
• Standardized control architecture used across multiple SSC test stands and
facility control systems.
• Pre-engineered integration with NASA’s existing PLC codebase, communication
drivers, and safety interlocks.
• Proven performance in high-reliability propulsion test environments.
• Ensures configuration control, reduces integration risk, and prevents cross-
vendor incompatibilities.
Alternate vendors were evaluated but were found not to meet NASA SSC’s requirements
for reliability, compatibility, and integration safety. Therefore, this procurement is brand
name mandatory for Allen-Bradley components.
-- 1 of 3 --
4. Requirements
The contractor shall provide new, unused, factory-certified Allen-Bradley hardware
meeting the following characteristics:
• 100% genuine Allen-Bradley products (no substitutions or refurbished parts).
• All hardware shall meet manufacturer specifications for key switch operation as
applicable.
• Items must be packaged, handled, and shipped per manufacturer
recommendations.
• All hardware shall be fully compatible with NASA SSC’s existing Allen-Bradley
systems.
5. Deliverables
The contractor shall deliver the following Allen-Bradley key switch components in the
exact quantities listed below:
2 ea – 800TC-H31BF
2 ea – 800TC-H3103BF
2 ea – 800TC-H3104BF
2 ea – 800TC-H3105BF
2 ea – 800TC-H3106BF
2 ea – 800TC-H3107BF
2 ea – 800TC-H3108BF
2 ea – 800TC-H3109BF
2 ea – 800TC-H3110BF
2 ea – 800TC-H3111BF
2 ea – 800TC-H3112BF
2 ea – 800TC-H3113BF
2 ea – 800TC-H3114BF
2 ea – 800TC-H3115BF
2 ea – 800TC-H3116BF
2 ea – 800TC-H3117BF
2 ea – 800TC-H3118BF
2 ea – 800TC-H3119BF
2 ea – 800TC-H3120BF
2 ea – 800TC-H3121BF
2 ea – 800TC-H3122BF
2 ea – 800TC-H3123BF
2 ea – 800TC-H3124BF
2 ea – 800TC-H3125BF
2 ea – 800TC-H3126BF
All equipment must conform to the specific part numbers listed; no deviations or
substitutions are permitted.
-- 2 of 3 --
Delivery Location:
Bldg 4010
NASA Stennis Space Center
Stennis Space Center, MS 39529
Delivery must follow NASA receiving requirements and include all shipment
documentation.
6. Exclusions
The following are not included in this procurement:
• Installation, setup, programming, commissioning, or testing
• Field engineering services
• Spare parts not listed
• Accessories, mounting hardware, or special tools unless expressly listed
• Logistics services beyond standard delivery
7. Acceptance Criteria
Hardware will be accepted upon:
• Verification of correct part numbers and quantities
• Inspection confirming new, undamaged condition
• Confirmation of compliance with this SOW and original manufacturer specifications
-- 3 of 3 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.