What this opportunity is
The Department of Labor is seeking total small business set-aside bids for security and caretaker services at the Atlanta Job Corps Center in Georgia, as outlined in the Performance Work Statement. This opportunity is suited for small businesses specializing in facility management and security services, as indicated by the NAICS code 561210. Interested vendors should note that this is a solicitation notice, which requires tracking the opportunity closely for submission deadlines and requirements.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PERFORMANCE WORK STATEMENT
FOR
SECURITY AND CARETAKER SERVICES
AT
ATLANTA JOB CORPS CENTER
ATLANTA, GA
U.S. DEPARTMENT OF LABOR
OCTOBER 2025
UPDATED JUNE 2026
PROJECT NO. 1046
PWS
-- 1 of 12 --
-----THIS PAGE INTENTIONALLY BLANK------
-- 2 of 12 --
TOC-1
PERFORMANCE WORK STATEMENT
SECURITY AND CARETAKER SERVICES
ATLANTA JOB CORPS CENTER
TABLE OF CONTENTS
Contents
I. Introduction ....................................................................................................................................... 1
II. Purpose and Background .................................................................................................................. 1
III. Key Personnel ................................................................................................................................... 1
IV. Performance Work Statement ........................................................................................................... 2
V. Deliverables ...................................................................................................................................... 5
VI. Contractor Capabilities ..................................................................................................................... 5
VII. Pricing Schedule ............................................................................................................................... 6
VIII. Objective ........................................................................................................................................... 6
IX. Acceptance of Deliverables .............................................................................................................. 6
X. Period of Performance ...................................................................................................................... 6
XI. Place of Performance ........................................................................................................................ 6
-- 3 of 12 --
TOC-2
-----THIS PAGE INTENTIONALLY BLANK------
-- 4 of 12 --
Page 1 of 8
PERFORMANCE WORK STATEMENT
FOR
SEURITY AND CARETAKER SERVICES
ATLANTA JOB CORPS CENTER
I. Introduction
This Performance Work Statement (PWS) sets forth the contract performance requirements
for security and caretaker services at the Atlanta Job Corps Center, located in Atlanta, GA.
DOL is seeking services to maintain security and general maintenance of this campus.
The property and partially construction buildings are owned by the Department of Labor. The
site and partially construction buildings are currently under the care of a caretaker contract
with the Department of Labor (Department).
Job Corps is a national residential training and employment program administered by the
Department of Labor to address the multiple barriers to employment faced by disadvantaged
youth throughout the United States. Job Corps was originally established by the Economic
Opportunity Act of 1964; current authorization for the program is the Workforce Innovation
and Opportunity Act (WIOA) of 2014.
II. Purpose and Background
The purpose of this contractor is to secure and sustain the construction site to prevent theft,
damage or deterioration of real property at the Atlanta New Center construction site. The
Contractor is to maintain the site, conduct weekly NPDES inspections and reporting, and
maintain existing sediment and erosion control measures.
The center campus is currently approximately 25% constructed and construction activities
have been temporarily stopped. There will be no construction activities or delivery or
removal of construction materials during the performance of this contract.
The purpose of this contract is to secure and maintain the site, buildings, and storage
containers until such time as construction activities are authorized to resume. See
Attachment 1 for Site Location and Attachment 2 for Site Plan.
III. Key Personnel
Key Personnel for this contract are as follows:
Position Experience Experience and Minimum Qualifications
Project Manager 10 years 10 Years of progressive facilities and
personnel management experience
-- 5 of 12 --
Page 2 of 8
IV. Performance Work Statement
A. Security Services
1. Provide security services for the 25-acre acre construction site to protect against theft
of government property and vandalism of stored building materials and equipment
and partially constructed buildings and building systems.
2. Security of the facility is required on a 24/7/365 basis. One guard shall be stationed at
the north entrance and shall control and log all visitors to the site daily. Copies of site
access logs shall be submitted with the daily reports. A second guard shall have
vehicular mobility to perform site wide patrols and shall be stationed at the secured
south entrance. Guards are not required to be armed.
3. Controlled access – The contractor shall control access to the campus. It may be
necessary to let maintenance contractors and other persons on site from time to time.
Access to this site shall be limited to DOL approved personnel. The contractor shall
ensure that all personnel who enter the facility shall present valid identification and
maintain a log of all entry and exit from the campus. Access is limited only to
personnel approved by the Contracting Officer's Representative (COR).
4. Maintain effective liaison with local law enforcement as necessary to maintain
security and safety of the facility.
B. Stored Equipment and Material Protection
1. The site contains Government owned materials and equipment that will not be used in
the completion of the project. Materials and equipment are currently stored in storage
containers and Buildings B, D, E, F, H, J, K, L, and M.
2. Protection from weather and damage of stored materials on-site and within the
storage containers and buildings is not required.
C. Temporary Fencing Rental and Maintenance
1. Maintain temporary fencing around the perimeter of the …
Source: SAM.gov, as posted. Verify the current solicitation before responding.