B522 HVAC, B414 DEMO

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W50S8R26BA002
NAICS
236220
PSC
Z2QA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 16, 2026
Response due
July 30, 2026
Place of performance
Mansfield, OH

What this opportunity is

The Department of Defense is soliciting bids for HVAC repairs and demolition projects at the 179th Cyberspace Wing in Mansfield, Ohio, under NAICS code 236220. This opportunity is a total small business set-aside, suitable for contractors with average annual revenues not exceeding $45 million. Interested bidders must attend a site visit and submit a base access form by June 18, 2026, and should be aware that bids will be evaluated without discussions, emphasizing the importance of thorough preparation prior to submission.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

PBXP222103 Demolish Building 414 PROJECT SPECIFICATIONS For Project PBXP222103 DEMOLISH BUILDING 414 At 179 CYBERSPACE WING OHIO AIR NATIONAL GUARD 1947 HARRINGTON MEMORIAL ROAD MANSFIELD LAHM AIRPORT, OHIO -- 1 of 156 -- PBXP222103 Demolish Building 414 2 TABLE OF CONTENTS SECTION 01 11 00 SUMMARY SECTION 01 20 00 PRICE AND PAYMENT PROCEDURES SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS SECTION 01 33 00 SUPPLEMENTAL SUBMITTAL PROCEDURES SECTION 01 40 00 QUALITY REQUIREMENTS SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS SECTION 01 60 00 PRODUCT REQUIREMENTS SECTION 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 02 41 00 DEMOLITION SECTION 02 81 00 TRANSPORTATION OF HAZORDOUS MATERIALS SECTION 02 82 00 ASBESTOS REMEIDATION SECTION 31 00 00 EARTHWORK SECTION 31 32 19 GEOTEXTILE SOIL STABILIZATION SECTION 32 15 00 AGGREGATE SURFACING SECTION 33 40 00 STORMWATER UTILITIES END OF TABLE OF CONTENTS -- 2 of 156 -- PBXP222103 Demolish Building 414 Section 01 11 00 3 SECTION 01 11 00 SUMMARY OF WORK PART 1. GENERAL 1.1. WORK COVERED BY CONTRACT DOCUMENTS 1.1.1. The work included in this project consists of furnishing all plant, labor, materials, and equipment required to accomplish the project in strict accordance with these Specifications and the Drawings. The principal items of work include, but are not limited to: 1.1.1.1. Demolition and Removal; work locations shall be as shown on the Drawings. Perform such work required at each location with due care, including shoring, bracing, and so on. 1.1.1.2. Manufactured Articles, Materials, and Equipment; shall be applied, installed, connected, erected, used, cleaned, and conditioned as directed by the respective manufacturers, unless otherwise specified. 1.2. WORK RESTRICTIONS 1.2.1. Access to Site 1.2.1.1. Location of the work to be performed is at the 179 Cyberspace Wing, Ohio Air National Guard Base, 1947 Harrington Memorial Road, Mansfield, Ohio 44903-8049, Building #414. See attached Site Plan for the location of the existing site where the work locations are to take place at and for the other various areas on base pertinent to the job. 1.2.2. Coordination with Site Occupants 1.2.2.1. Work Schedule; shall be performed Monday through Friday, excluding Federal Holidays, unless otherwise directed or permitted by the Contracting Officer. Work shall be performed from 7:00 AM to 4:30 PM, unless otherwise directed or permitted by the Contracting Officer. 1.3. OCCUPANCY OF PREMISES 1.3.1. Surrounding building(s) will be occupied during performance of work under this Contract. Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. 1.3.2. Contractor Use of Site 1.3.2.1. During the construction period, Contractor shall have full use of the premises within the project limits as shown on the Drawings for execution of the work. Use of premises is limited only by Owner’s right to perform duties and functions as stated in the GENERAL CONDITIONS and in this section. 1.3.2.2. The Contractor, before starting any work relating to existing utilities (electrical, sewer, water, heat, gas, fire lines, etc.) that will temporarily discontinue or disrupt service to the existing facilities, will notify the Contracting Officer's Representative 72 hours in advance and obtain approval in writing before proceeding with this phase of the work. 1.4. EXISTING WORK -- 3 of 156 -- PBXP222103 Demolish Building 414 Section 01 11 00 4 1.4.1. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. 1.4.2. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. 1.5. GOVERNMENT FURNISHED MATERIAL AND EQUIPMENT: 1.5.1. The Government will furnish the following materials and equipment for installation by the Contractor: 1.5.1.1. NONE 1.6. SUBMITTALS: NONE PART 2. PRODUCTS (NOT USED) PART 3. EXECUTION (NOT USED) END OF SECTION 01 11 00 -- 4 of 156 -- PBXP222103 Demolish Building 414 Section 01 20 00 5 SECTION 01 20 00 PRICE AND PAYMENT PROCEDURES PART 1. GENERAL (SUBSTITUTION PROCEDURES) 1.1. PRODUCT SUBSTITUTION PROCEDURES 1.1.1. This Section includes administrative and procedural requirements for handling requests for substitutions made after award of the Contract. No substitutions will be evaluated during bidding. 1.1.2. Acceptable manufacturers listed in the Contract Documents are not intended to exclude manufacturers not listed. Products of equal performance will be considered. 1.1.3. Related work specified elsewhere in these Contract Documents: 1.1.3.1. Requirements for submitting Contractor’s Construction Progress schedule and the Submittal schedule: SECTION 01 33 00. 1.1.3.2. Requirements governing Contractor’s selection of products: SECTION 01 60 00. 1.1.4. Definitions: Substitutions are changes in products, materials, equipment, and methods of construction required by the Contract Documents proposed by the Contractor after award of the Contract are considered to be requests for substitutions. 1.1.4.1. The following are not considered to be requests for substitutions; revisions to the Contract Documents requested by Owner or Engineer, and specified options of products and construction methods included in the Contract Documents. 1.1.5. Substitution of products will be considered after award of contract only under one of the following conditions: 1.1.5.1. When the specified product is not available, a proposed substitution will not be considered unless proof is submitted that firm ord

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)