The Department of Defense is soliciting bids for HVAC repairs and demolition projects at the 179th Cyberspace Wing in Mansfield, Ohio, under NAICS code 236220. This opportunity is a total small business set-aside, suitable for contractors with average annual revenues not exceeding $45 million. Interested bidders must attend a site visit and submit a base access form by June 18, 2026, and should be aware that bids will be evaluated without discussions, emphasizing the importance of thorough preparation prior to submission.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PBXP222103 Demolish Building 414
PROJECT SPECIFICATIONS
For
Project PBXP222103
DEMOLISH BUILDING 414
At
179 CYBERSPACE WING
OHIO AIR NATIONAL GUARD
1947 HARRINGTON MEMORIAL ROAD
MANSFIELD LAHM AIRPORT, OHIO
-- 1 of 156 --
PBXP222103 Demolish Building 414
2
TABLE OF CONTENTS
SECTION 01 11 00 SUMMARY
SECTION 01 20 00 PRICE AND PAYMENT PROCEDURES
SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS
SECTION 01 33 00 SUPPLEMENTAL SUBMITTAL PROCEDURES
SECTION 01 40 00 QUALITY REQUIREMENTS
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 01 60 00 PRODUCT REQUIREMENTS
SECTION 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 02 41 00 DEMOLITION
SECTION 02 81 00 TRANSPORTATION OF HAZORDOUS MATERIALS
SECTION 02 82 00 ASBESTOS REMEIDATION
SECTION 31 00 00 EARTHWORK
SECTION 31 32 19 GEOTEXTILE SOIL STABILIZATION
SECTION 32 15 00 AGGREGATE SURFACING
SECTION 33 40 00 STORMWATER UTILITIES
END OF TABLE OF CONTENTS
-- 2 of 156 --
PBXP222103 Demolish Building 414
Section 01 11 00 3
SECTION 01 11 00
SUMMARY OF WORK
PART 1. GENERAL
1.1. WORK COVERED BY CONTRACT DOCUMENTS
1.1.1. The work included in this project consists of furnishing all plant, labor, materials, and
equipment required to accomplish the project in strict accordance with these Specifications and
the Drawings. The principal items of work include, but are not limited to:
1.1.1.1. Demolition and Removal; work locations shall be as shown on the Drawings.
Perform such work required at each location with due care, including shoring, bracing, and so
on.
1.1.1.2. Manufactured Articles, Materials, and Equipment; shall be applied, installed,
connected, erected, used, cleaned, and conditioned as directed by the respective
manufacturers, unless otherwise specified.
1.2. WORK RESTRICTIONS
1.2.1. Access to Site
1.2.1.1. Location of the work to be performed is at the 179 Cyberspace Wing, Ohio Air
National Guard Base, 1947 Harrington Memorial Road, Mansfield, Ohio 44903-8049, Building
#414. See attached Site Plan for the location of the existing site where the work locations are
to take place at and for the other various areas on base pertinent to the job.
1.2.2. Coordination with Site Occupants
1.2.2.1. Work Schedule; shall be performed Monday through Friday, excluding Federal
Holidays, unless otherwise directed or permitted by the Contracting Officer. Work shall be
performed from 7:00 AM to 4:30 PM, unless otherwise directed or permitted by the Contracting
Officer.
1.3. OCCUPANCY OF PREMISES
1.3.1. Surrounding building(s) will be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of
access, space for storage of materials and equipment, and use of approaches, corridors, and
stairways.
1.3.2. Contractor Use of Site
1.3.2.1. During the construction period, Contractor shall have full use of the premises
within the project limits as shown on the Drawings for execution of the work. Use of premises
is limited only by Owner’s right to perform duties and functions as stated in the GENERAL
CONDITIONS and in this section.
1.3.2.2. The Contractor, before starting any work relating to existing utilities (electrical,
sewer, water, heat, gas, fire lines, etc.) that will temporarily discontinue or disrupt service to
the existing facilities, will notify the Contracting Officer's Representative 72 hours in advance
and obtain approval in writing before proceeding with this phase of the work.
1.4. EXISTING WORK
-- 3 of 156 --
PBXP222103 Demolish Building 414
Section 01 11 00 4
1.4.1. Remove or alter existing work in such a manner as to prevent injury or damage to any
portions of the existing work which remain.
1.4.2. Repair or replace portions of existing work which have been altered during construction
operations to match existing or adjoining work, as approved by the Contracting Officer. At the
completion of operations, existing work must be in a condition equal to or better than that which
existed before new work started.
1.5. GOVERNMENT FURNISHED MATERIAL AND EQUIPMENT:
1.5.1. The Government will furnish the following materials and equipment for installation by the
Contractor:
1.5.1.1. NONE
1.6. SUBMITTALS: NONE
PART 2. PRODUCTS (NOT USED)
PART 3. EXECUTION (NOT USED)
END OF SECTION 01 11 00
-- 4 of 156 --
PBXP222103 Demolish Building 414
Section 01 20 00 5
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1. GENERAL (SUBSTITUTION PROCEDURES)
1.1. PRODUCT SUBSTITUTION PROCEDURES
1.1.1. This Section includes administrative and procedural requirements for handling requests
for substitutions made after award of the Contract. No substitutions will be evaluated during
bidding.
1.1.2. Acceptable manufacturers listed in the Contract Documents are not intended to exclude
manufacturers not listed. Products of equal performance will be considered.
1.1.3. Related work specified elsewhere in these Contract Documents:
1.1.3.1. Requirements for submitting Contractor’s Construction Progress schedule and the
Submittal schedule: SECTION 01 33 00.
1.1.3.2. Requirements governing Contractor’s selection of products: SECTION 01 60 00.
1.1.4. Definitions: Substitutions are changes in products, materials, equipment, and methods of
construction required by the Contract Documents proposed by the Contractor after award of the
Contract are considered to be requests for substitutions.
1.1.4.1. The following are not considered to be requests for substitutions; revisions to the
Contract Documents requested by Owner or Engineer, and specified options of products and
construction methods included in the Contract Documents.
1.1.5. Substitution of products will be considered after award of contract only under one of the
following conditions:
1.1.5.1. When the specified product is not available, a proposed substitution will not be
considered unless proof is submitted that firm ord…