What this opportunity is
The Department of Veterans Affairs is seeking design services to replace the Physical Access Control System (PACS) at a VA Medical Center, as outlined in the presolicitation notice. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, making it particularly suitable for firms within that category. Interested businesses should note that this is a presolicitation notice, indicating they should track the opportunity for further details rather than submit bids at this stage.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Program Guide, PG-18-15, Volume C
Nov 2008
Department of
Veterans Affairs
VA Medical Center Projects
503-26-106
Replace Physical Access Control
System (PACS)
A/E Submission Instructions
for Minor and NRM
Construction Program:
• Schematics
• Design Development
• Construction Documents
-- 1 of 56 --
Program Guide, PG-18-15, Volume C Page i
May 2006
Department of Veterans Affairs
Washington, DC 20420
FOREWORD
This document states the minimum requirements for each submission in the production
of VA Schematics, Design Development, and Construction Documents for Minor and
NRM Construction Program for Medical Center Projects. It will give VA reviewers and
the A/E a clear understanding of what is required of the A/E at each stage of design.
This document does not relieve the A/E firms of their professional responsibility to
produce a correct, complete, and fully coordinated set of construction documents.
Lloyd H. Siegel William W. Graham
Director, Facilities Quality Office (Acting) Director,
Engineering Management and
Field Support Office
-- 2 of 56 --
Program Guide, PG-18-15, Volume C Page ii
May 2006
A/E SUBMISSION INSTRUCTIONS FOR
MINOR AND NRM CONSTRUCTION PROGRAM
MEDICAL CENTER PROJECTS
Table-of-Contents
I. GENERAL ............................................................................................................. 1
A. INTRODUCTION .............................................................................................. 1
B. A/E RESPONSIBILITIES ................................................................................. 6
C. SUBMISSION POLICY .................................................................................... 9
D. QUALITY ASSURANCE/QUALITY CONTROL............................................. 10
E. ADDITIONAL SERVICES .............................................................................. 11
F. CRITICAL PATH METHOD ............................................................................ 11
II. SUBMISSIONS .................................................................................................... 12
A. SITE DEVELOPMENT ................................................................................... 12
B. ARCHITECTURAL ......................................................................................... 14
C. FIRE PROTECTION ....................................................................................... 18
D. INTERIOR DESIGN........................................................................................ 22
E. STRUCTURAL ............................................................................................... 24
F. PLUMBING .................................................................................................... 26
G. SANITARY ..................................................................................................... 28
H. HVAC ............................................................................................................. 30
I. ELECTRICAL ................................................................................................. 34
J. EQUIPMENT .................................................................................................. 34
K. STEAM GENERATION .................................................................................. 37
L. STEAM DISTRIBUTION (OUTSIDE) ............................................................. 39
M. SOLID WASTE DISPOSAL SYSTEM (INCLUDING INCINERATION) .......... 40
N. AUTOMATIC TRANSPORT ........................................................................... 42
O. ASBESTOS ABATEMENT ............................................................................ 44
P. SPACE PLANNING ....................................................................................... 46
Q. CRITICAL PATH METHOD (CPM) ................................................................ 46
-- 3 of 56 --
Program Guide, PG-18-15, Volume C Page iii
May 2006
Table of Contents (Cont.)
R. ESTIMATING ................................................................................................. 47
S. SPECIFICATIONS ......................................................................................... 48
T. FINAL BID DOCUMENTS .............................................................................. 49
III. DISTRIBUTION OF A/E MATERIAL ................................................................... 50
A. SYMBOL IDENTIFICATION OF CONTRACT DRAWINGS ........................... 50
B. GENERAL NOTES......................................................................................... 50
C. A/E % SUBMISSIONS AND DUE DATES ..................................................... 50
-- 4 of 56 --
Program Guide, PG-18-15, Volume C 1
November 2008
A/E SUBMISSION INSTRUCTIONS FOR
MINOR AND NRM CONSTRUCTION PROGRAM
MEDICAL CENTER PROJECTS
I. GENERAL
A. INTRODUCTION
1. This document contains information and minimal submission requirements
for contract documents specified in the A/E contract.
a. The A/E will have access to this facility’s Asbestos and Lead Paint
Assessment Surveys.
2. The Department of Veterans Affairs (VA) may contract with an
Architect/Engineer (A/E) for any portion of a design: Schematics, Design
Development, Construction Documents, or a combination of these.
a. For projects where the VA is contracting for Schematics Documents only,
Schematics and Design Development Documents only, or Schematics,
Design Development, and Construction Documents, the VA will provide
the Design Program (if available), Facility Development Plans (if
available), and VA design standards to accompany the Scope of Work for
the project.
b. For projects where the VA is contracting for Design Development and
Construction Documents only, the VA will provide the Schematics Plans
and VA design standards to accompany the Scope of Work for the project.
c. For projects where the VA is contracting for Construction Documents only,
the VA will …
Source: SAM.gov, as posted. Verify the current solicitation before responding.