CAP Rathbun Shoreline Rock Purchase

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
W912DQ26QA068
NAICS
212312
PSC
5610
Posted
July 10, 2026
Response due
July 24, 2026

What this opportunity is

The Department of Defense is seeking a contractor to supply stone for shoreline rock protection, specifically riprap, which meets the requirements outlined in the contract documents. This opportunity is suitable for small businesses that specialize in mining and quarrying of stone (NAICS 212312). The notice type is a Combined Synopsis/Solicitation, which means that interested parties must track the solicitation for updates and submit a bid when it is released.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Page 1 SECTION 35 31 19 PART 1 GENERAL STONE PROTECTION 01/08 Processing, testing, hauling, and stockpiling stone shall meet the requirements of the contract documents. All supplied stone shall be from Corps of Engineers approved sources. For the purpose of this specification, a source will refer to a specific bed at a specific quarry location. Gradation and evaluation testing will be at the expense of the quarry. If the quarry proposes an unapproved source, then the quarry will be responsible for the cost of gradation and evaluation testing. Evaluation testing of unlisted stone sources proposed by the quarry must indicate quality is equivalent or better than the approved sources for approval. 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM INTERNATIONAL (ASTM) ASTM C127 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and Absorption of Coarse Aggregate ASTM C535 (2016; R 2024) Standard Test Method for Resistance to Degradation of Large-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine ASTM D3740 (2019) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction ASTM D4791 (2019) Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate ASTM D4992 (2014; E 2015) Evaluation of Rock to be Used for Erosion Control -- 1 of 13 -- Page 2 ASTM D5312/D5312M (2012; R 2013) Evaluation of Durability of Rock for Erosion Control Under Freezing and Thawing Conditions ASTM D5313/D5313M (2012; R 2013) Evaluation of Durability of Rock for Erosion Control Under Wetting and Drying Conditions ASTM D5519 (2015) Particle Size Analysis of Natural and Man-Made Riprap Materials NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) NIST HB 44 (2018) Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices U.S. ARMY CORPS OF ENGINEERS (USACE) EM 1110-2-1601 (1991; 1994 Change 1) Engineering and Design -- Hydraulic Design of Flood Control Channels 1.2 DEFINITIONS 1.2.1 Stone Protection Stone Protection is defined as a system which may include a layer of bedding material beneath a layer or layers of riprap. Stone protection is placed around structures in slack water or within a dewatered site. Stone protection may also be used to protect channel banks or shoreline when it is placed in the dry or in slack water. 1.2.2 Riprap Riprap is defined as a material having a gradation band similar to those specified in EM 1110-2-1601, Chapter 3, uniform graded material. Riprap is normally produced by mechanical methods, with a jaw crusher and grizzly after the stone has been mined by blasting in a quarry. The terms riprap and stone are used interchangeably in 35 31 19. 1.3 SUBMITTALS Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with the "DO" designation require review and approval by the District Office. Submit the following to the Missouri River Project Office, 790 E HWY 224, Napoleon, MO 64074. SD-01 Preconstruction Submittals QC Plan, Including Quarry Production Control Plan which includes -- 2 of 13 -- Page 3 dimensions of blast area; G, DO SD-03 Product Data Riprap; G, DO SD-04 Samples Stone (Demonstration Stockpiles); G, DO SD-06 Test Reports Gradation Test; G, DO Evaluation Testing of Stone; G, DO SD-07 Certificates Stone; G, DO Weigh Scale Certification; G Certified Weight Scale Tickets; G 1.4 QUALITY ASSURANCE 1.4.1 Stone For the purpose of this specification, a source will refer to a specific bed at a specific quarry location. 1.4.1.1 General All stone shall be durable material as approved by the Missouri River Project Office. Stone shall be of a suitable quality to ensure permanence in the structure and in the climate in which it is to be used. It shall be free from cracks, blast fractures, bedding, seams and other defects that would tend to increase its deterioration from natural causes. Inspections for cracks, fractures, seams and defects shall be made by visual examination. If, by visual examination, it is determined that 10 percent or more of the stone produced contains hairline cracks, then all stone produced by the means and measures which caused the fractures shall be rejected. A hairline crack that is defined as being detrimental shall have a minimum width of 4 mil and shall be continuous for one-third the dimension of at least two sides of the stone. The stone shall be clean and adequately free from all foreign matter. Any foreign material adhering to or combined with the stone as a result of stockpiling shall be removed prior to delivery. If an unapproved source is to be used, show that an adequate quantity of material is available and provide quality test data. 1.4.1.2 Sources Stone shall be furnished from one or a combination of approved sources. -- 3 of 13 -- Page 4 The quarry will pay all costs for gradation and evaluation tests from the approved source to assure the acceptability of the stone. The quarry will be responsible for sending suitable stone samples to a lab for evaluation testing of stone from sources with an adequate supply of material and submitting test results to the Missouri River Project Office. a. Selection of Source. Designate in writing only one source or one combination of sources from which the quarry proposes to furnish stone. If the quarry proposes to furnish stone from a unapproved source they shall notify the Missouri River Project Office at least 60 workdays before the stone leaves the quarry. It is the quarry's responsibility to determine that the stone source or combination

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 212312)