Case Manufacturing

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
HQ072726QCB04
NAICS
333517
PSC
3465
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
July 21, 2026
Response due
July 31, 2026
Place of performance
LINDA, CA

Description

SOW PWS Template 2021 June.doc PERFORMANCE WORK STATEMENT (PWS) DMEA 26-6F8A/B Date 18 June 2026 Project Engineer: 1.0 SCOPE: 1.1 TITLE: Re-manufacture of enclosures for Data Transfer Device (DTD) project 1.2 APPLICABILITY: F-22, C130, C5, PMCIA data cards 1.3 BACKGROUND: The original sheet metal enclosures for DTDs have been discontinued by the manufacturer (Hirose). There is no current supplier for these enclosures. Desing and produce sheet metal stamping die to reproduce production level sheet metal enclosers for the Personal Computer Memory Card International Association (PCMCIA) based data transfer devices (DTD). Using the stamping die deliver 60000 each for side A and side B. 1.4 PURPOSE: The PCMCIA data cards are used throughout the department with this contact there will be two suppliers. This will enable the department to meet the needs of the warfighter 2.0 REFERENCED GOVERNMENT PROVIDED RESOURCES: None 2.1 GOVERNMENT DOCUMENTS: Document No. Date Available Title Description Upon Award Side A 3D Models Upon Award Side B 3D Models 3.0 REQUIREMENTS: Supplier shall design and fabricate necessary tooling for the re-manufacture of sheet metal enclosures for the DTD project. 3.1 GENERAL REQUIREMENTS: 3.1.1 RESERVED 3.2 PROGRAM MANAGEMENT: The contractor shall perform administrative, technical, financial management, during the course of this effort and shall maintain a status of their effort towards achieving the CET objectives, including all technical activities and efforts, problems/deficiencies, impacts, and recommended solutions. (A001) 3.2.1 TECHNICAL INTERCHANGE MEETINGS (TIMs): 3.2.1.1 Design review with contractor and DMEA before finalization of tooling. 3.2.1.2 First article inspection review meeting after delivery of materials 3.3 TASK REQUIREMENTS: 3.3.1 Design and build Stamping die for Side A in accordance with government furnished documents. 3.3.1.1 The contractor shall retain stamping die for minimum of 1 year. The contractor shall contact DMEA POC listed in section 5.0 before disposition 3.3.1.2 The contractor shall deliver 3- dimension drawings of stamping die side A 3.3.1.3 The contractor shall deliver 2- dimension drawings of stamping die side A 3.3.1.4 Deliver a minimum of three (3) first articles for side A -- 1 of 4 -- SOW PWS Template 2021 June.doc 3.3.2 Design and build stamping die for Side B In accordance with government furnished documents. 3.3.2.2 The contractor shall retain stamping die for minimum of 1 year. The contractor shall contact DMEA POC listed in section 5.0 before disposition 3.3.2.2 The contractor shall deliver 3- dimension drawings of stamping die for side B 3.3.2.3 The contractor shall deliver 2- dimension drawings of stamping die for side B 3.3.2.4 Deliver a minimum of three (3) first articles for Side B 3.3.3 The contractor shall deliver Sixty thousand (60000) production units for side A 3.3.4 The contractor shall deliver Sixty thousand (60000) production units for side B 3.3.5 The contractor shall provide shipping for all deliverables 3.4 PROGRAM SUMMARY: The contractor shall summarize all work accomplished under this CET, including significant technical accomplishments, problems encountered, solutions implemented, recommendations for improvement, and a comparison of planned schedules and costs with final performance. 4.0 DATA ITEMS: The following CDRLs apply to this delivery order and shall be submitted as described below. Indicate on the cover of all delivered data the contract number, delivery order number, CET number, CET title, and the current DMEA Project Engineer name and office symbol. 1. Sequence Number A001 2. Title Technical Review Minutes 3. Subtitle TIM Minutes 4. Authority DI-ADMN-81250B 5. Contract Reference Para. 3.2.1 6. Requiring Office DMEA/MEAC 7. DD 250 Req LT 8. App Code N/A 9. Distribution Statement Req’d DISTRIBUTION D. Distribution authorized to Department of Defense and U.S. DoD contractors only (reason) (date of determination). Other requests for this document shall be referred to (controlling DoD office). 10. Frequency ASREQ 11. As of N/A 12. Date of First Submission 10 calendar days after TIM 13. Date of Subsequent Submission N/A 14. Distribution See Distribution List 15. Total See Distribution List 16. Remarks Contractor format is acceptable. Include presentation materials in the TIM minutes. Block 9: Mark all CDRL items with the distribution statement as shown above in Block 9 and with the following additional statement: "The U.S. Government retains unlimited data/computer software rights to this item." If DMEA #A16-001, paragraphs (o) and (p) are included in the delivery order, these additional statements do not apply to those items identified as technical data or computer software to be furnished with restrictions. -- 2 of 4 -- SOW PWS Template 2021 June.doc 1. Sequence Number A002 2. Title Special Tooling (ST) Drawings/Models & Assoc Lists 3. Subtitle Side A 3D Model files 4. Authority DI-SESS-81008E 5. Contract Reference Para 3.3.1.2 6. Requiring Office DMEA/MEAC 7. DD 250 Req. DD 8. App Code N/A 9. Distribution Statement Req’d DISTRIBUTION D. Distribution authorized to Department of Defense and U.S. DoD contractors only (reason) (date of determination). Other requests for this document shall be referred to (controlling DoD office). 10. Frequency OTIME 11. As of N/A 12. Date of First Submission 10 days prior to the end of the period of performance indicated in the delivery order 13. Date of Subsequent Submission N/A 14. Distribution See Distribution List 15. Total See Distribution List 16. Remarks Contractor format is acceptable. Block 9: Mark all CDRL items with the distribution statement as shown above in Block 9 and with the following additional statement: "The U.S. Government retains unlimited data/computer software rights to this item." If DMEA #A16-001, paragraphs (o) and (p) are included in the delivery order, these additional statements do not apply to those items identified as technical data o

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 333517)