CEILING LIGHT REPLACEMENT
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
N0018926QL136
NAICS
238210
PSC
J059
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 3, 2026
Response due
June 3, 2026
Place of performance
Norfolk, VA
What this opportunity is
The Department of Defense is seeking a contractor to replace ceiling lighting on the 1st, 3rd, and 6th floors of FLC general areas at Naval Station Norfolk, converting to LED lighting and removing existing fixtures. This opportunity is set aside for total small businesses under NAICS 238210. Interested contractors should note that this is a Combined Synopsis/Solicitation, indicating they will need to track the notice for proposal submission rather than simply bidding.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK
Project Description and Purpose: Contractor shall provide all labor, materials, equipment, and management to
Replace, ceiling lighting 1st, 3rd, and 6th floors of FLC general areas FLC W-143 at Naval Station Norfolk. The
Contractor shall ensure proper operational status upon completion of task.
Notes: N/A
Attachments: N/A
Contractor shall:
1. Submit a detailed schedule of work.
2. Submit outages request that are applicable to the task.
3. Submit a fall protection plan for all work over six feet.
4. Attain signed Hot Work Permits if applicable to the task. Any cutting, welding, soldering or grinding will
require a hot work request approved by the Base Fire Department and posted at the work site.
5. Ensure that surrounding surfaces are protected from damage throughout the duration of the task.
6. Perform necessary Lock Out/Tag Out of all effected equipment to ensure all power sources are properly de-
energized.
7. Keep a nice neat working space, making sure all flooring and surrounding areas are free and clear of tools
and material.
8. Convert all lighting to LED lighting.
9. Replace all LED emergency lights where needed.
10. Remove all ceiling fans in hall ways.
11. Remove Can lighting in ceiling tile in area Cap off electrical wiring to ensure safe proper status where needed.
12. Remove all Speakers in Ceiling tile and cap off electrical wiring.
13. Perform a worksite cleanup and properly dispose of all debris associated with the task.
Working Hours: The Contractor shall provide a detailed schedule to accomplish all work. All work must be
performed during normal working hours. If afterhours work is needed, it must be approved by the Federal
Government.
Pre-Proposal Meeting: A pre-proposal site meeting shall be held if requested by the Contractor prior to the award of
this task order. The contractor shall coordinate the date and time with the Contracting Officer.
Pre-Performance Meeting: No work will start prior to the Pre-performance meeting with the Government
Designated Authority and customer. The purpose of the meeting is for the contractor and government to obtain a
mutual understanding of the existing conditions, the tasks required to complete the work, specific impacts and risks
associated with the work, and the level of effort required developing the work plan, and covering all documentation
requirements. The Contractor shall start work immediately after the pre-performance meeting.
Hazardous Material Disclosure: For work in soil excavation and other exterior construction etc., the Contractor
may be required to work with contaminated material involving abatement or management of these contaminated
materials. However, if during the performance of the work, the Contractor encounters hazardous substances not
known prior to issuance of this Task Order; the Contractor shall immediately stop work and inform the Contracting
Officer for direction. In no instance shall the Contractor perform the work involving the hazardous material without
notifying and receiving approval from the Contracting Officer for direction.
Document and Repair Schedule: The Contractor shall start work immediately after pre-performance meeting. The
Contractor shall provide to the Government Designated Authority (GDA) a list of all personnel who will be working
on site, Activity Hazard Analysis (AHA), Accident Prevention Plan (APP), schedule of work and any outage
paperwork at the Pre-performance meeting. All work shall be performed in accordance with current standard
industry practices, applicable local, state and federal codes, laws and regulations, Unified Facilities Criteria (UFC’s),
Unified Facilities Guide Specifications (UFGS), US Army Corps of Engineers (EM 385), all OSHA safety
-- 1 of 2 --
regulations, EPA guidelines and base procedures. All work shall comply with the Uniform Federal Accessibility
Standards (UFAS) and Americans with Disabilities Act Accessibility Guide (ADAAG). All work including
subcontracted work shall comply with base procedures, latest revision of the NNSY specific guide specifications for
environmental and safety requirements, state and federal regulations.
-- 2 of 2 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238210)
841st Network Cabling Installation
DEPT OF DEFENSE · Solicitation · due June 10, 2026
Kittyhawk Chapel Sound System, Projector, and AV Wiring Installation Service
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 29, 2026
1230--Project# 561A4-26-507 Replace Fire Alarm Controls Annunciator
VETERANS AFFAIRS, DEPARTMENT OF · Sources Sought · due April 1, 2026
TAFB MACC-BOA | Formal RFP for WWYK050751 - Repair/Replace Main Distribution & Branch Panel Boards, Bldg. 6002
DEPT OF DEFENSE · Solicitation · due July 3, 2026
Z--Rehab Power and Cooling Systems, Pinnalces NP
INTERIOR, DEPARTMENT OF THE · Solicitation · due June 23, 2026
14 Weapons Sq Audio/Visual Refresh
DEPT OF DEFENSE · Solicitation · due July 6, 2026