Chapel Activity Center (CAC) Interior Refresh, F528, Vance AFB
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
FP1019545
NAICS
236220
PSC
Z2JZ
Set-aside
No Set aside used
Posted
June 8, 2026
Response due
June 15, 2026
Place of performance
Enid, OK
What this opportunity is
The Department of Defense is seeking contractors for an interior refresh of the Chapel Activity Center at Vance Air Force Base in Oklahoma. This project falls under NAICS code 236220 and is not set aside for small businesses, meaning all business sizes can compete. The notice type is a Combined Synopsis/Solicitation, indicating that interested parties should prepare to submit bids rather than merely track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Design Percent Completion: 100%
April 28, 2026
Statement of Work
CHAPEL ACTIVITY CENTER (CAC) INTERIOR REFRESH, F528
VANCE AIR FORCE BASE, OKLAHOMA
FACILITY PROJECT ID 1019545
PREPARED BY JAHNIA WRIGHT
POC: JOMARA ORTIZ
-- 1 of 36 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1019545 Page 1 of 14 Chapel Activity Center Interior Refresh, F528
SoW Version 4.0
INDEX
PART 1 GENERAL ....................................................................................................................................... 2
1.01. PROJECT DESCRIPTION ..................................................................................................................... 2
1.02. INSTRUCTIONS TO BIDDERS ............................................................................................................. 2
1.03. LOCATION OF WORK ........................................................................................................................ 2
1.04. SCOPE OF WORK .............................................................................................................................. 2
1.05. CHANGES .......................................................................................................................................... 6
1.06. WARRANTY....................................................................................................................................... 7
1.07. SCHEDULE OF WORK ........................................................................................................................ 7
1.08. WORK RESTRICTIONS ....................................................................................................................... 7
1.09. CONTRACTOR’S REPRESENTATIVE ................................................................................................... 9
1.10. PROVIDED SERVICES AND UTILITIES .............................................................................................. 10
1.11. INSPECTION .................................................................................................................................... 10
1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE) ....................................... 10
1.13. SPECIAL MATERIALS ....................................................................................................................... 10
1.14. MATERIALS ..................................................................................................................................... 11
PART 2 EXECUTION.................................................................................................................................. 12
2.01. SITE SAFETY REQUIREMENTS ......................................................................................................... 12
2.02. INSTALLATION ................................................................................................................................ 12
PART 3 SITE INFORM ATION .................................................................................................................... 13
PART 4 APPENDICES ................................................................................................................................ 14
4.01. APPENDIX A – SITE PHOTOS ........................................................................................................... 16
4.02. APPENDIX B – BID FORM................................................................................................................ 19
4.03. APPENDIX C – DRAWINGS .............................................................................................................. 21
4.04. APPENDIX D – SCHEDULE E ............................................................................................................ 34
-- 2 of 36 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1019545 Page 2 of 14 Chapel Activity Center Interior Refresh, F528
SoW Version 4.0
PART 1 GENERAL
1.01. PROJECT DESCRIPTION
A. The work covered under this Statement of Work shall consist of an interior refresh of
Facility 528 and any incidental work necessary to provide a complete and usable finished
product.
1.02. INSTRUCTIONS TO BIDDERS
A. As part of the bid package the Contractor shall submit a completed copy of APPENDIX B –
BID FORM, along with all required documentation as stated in Sam.gov.
1.03. LOCATION OF WORK
A. Location of work to be accomplished under this statement of work is at Vance Air Force
Base (AFB). Vance AFB is located three miles south of the City of Enid, Oklahoma. Facility
528 is located northeast of the intersection of Elam Road and Brown.
1.04. SCOPE OF WORK
A. The Contractor shall furnish all supervision, labor, equipment, consumable materials,
supplies, tools, and other items to complete the construction as listed in the Scope of
Work. All quotes shall include all shipping charges for completion of the project. The
contractor will coordinate all work with ASRC Federal (ASRC) Construction Management
prior to execution. The list of items below are to be considered the general Scope of
Work for the project.
B. The Contractor shall field verify location of work, dimensions, and existing site conditions
prior to commencing work. The Contractor shall contact ASRC Construction Management
for any discrepancies with the Scope of Work.
C. Additional details are described below:
1. DEMOLITION
a. Refer to APPENDIX C – DRAWINGS, SHEETS ID101 DEMOLITION PLAN, ID102
KITCHEN DEMOLITION and ID103 RESTROOM DEMOLITION , for location and
details of work.
b. Follow all recommended safety protocols prior to beginning demolition on each
work phase.
-- 3 of 36 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1019545 Page 3 of 14 Chapel Activity Center Interior Refresh, F528
SoW Version 4.0
c. Dispose of demolished materials in accordance with all applicable statuses and
limitations.
2. ASBESTOS ABATEMENT
a. Refer to AP…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
BLDG 31B New Roofing Below Grade Structure
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Solicitation · due June 26, 2026
Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB Texas
DEPT OF DEFENSE · Special Notice
Repair BEQ HP135
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 16, 2026
P-1458 2nd Radio Battalion Complex, Phase 2, Parachute and Supply Facilities
DEPT OF DEFENSE · Solicitation · due May 28, 2025
Orrin Hatch U.S. Courthouse LED Lighting Upgrade
GENERAL SERVICES ADMINISTRATION · Solicitation · due July 9, 2026
Z1DA--Correct Martinez and Mare Island Generator Fuel Lines
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due June 24, 2026