Combined Synopsis/Solicitation for B6 Security Renovation

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
H92295-26-Q-B010
NAICS
236220
PSC
Z2AA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 17, 2026
Response due
July 2, 2026
Place of performance
Tucson, AZ

What this opportunity is

The Department of Defense is seeking a total small business to perform renovations and security enhancements at a modular facility in Tucson, AZ, specifically for U.S. Customs and Border Protection. The project includes demolition, structural modifications, HVAC upgrades, electrical system assessments, perimeter security installations, and electronic security systems compliant with specific standards. Interested small businesses should note the mandatory site visit and the requirement for personnel to pass a background check, indicating a need for careful planning and compliance with security protocols.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Quality Assurance Surveillance Plan (QASP) Project: Renovation of Building 6, Task Order 1 (Security and Force Protection) 1. Introduction This QASP is a government document used to guide the monitoring and evaluation of the contractor's performance in meeting the requirements of the Statement of Work (SOW). It provides a systematic method to assess whether the services and deliverables meet the required standards and identifies the responsible party for surveillance. The primary individual responsible for this surveillance is the Contracting OƯicer's Representative (COR). 2. Purpose  Ensure contractor performance aligns with all terms and conditions of the SOW.  Provide a basis for objective and documented performance assessment.  Ensure all deliverables and required outcomes are achieved at the specified quality level.  Identify potential performance issues early to allow for timely corrective action. 3. Performance Monitoring The COR will use the methods of surveillance listed below to monitor the contractor's performance. The results of this surveillance will be documented and used to verify that the contractor has fulfilled all contractual obligations. 4. Performance Requirements & Surveillance Matrix The following table details the specific tasks from the SOW, the required performance standards, and the methods and frequency of surveillance. SOW Ref Performance Requirement Performance Standard Surveillance Method Surveillance Frequency 2.1 Demolition & Site Prep All existing windows removed; openings infilled flush, matching insulation and finish; debris legally disposed of. 100% Inspection Upon completion of demolition. -- 1 of 4 -- 2.2 Architectural & Structural Non-serviceable skirting replaced; security vestibule constructed to dimensions; sub-flooring, framing, and footers improved to support SCIF door. 100% Inspection & Measurement During and after construction. 2.3 HVAC Two new 1-ton mini-split units installed in the server room and main oƯice; condensers placed on an approved concrete pad. 100% Inspection; Review of COR approval for placement. During and after installation. 2.4 Electrical System Electrical system proven to support all specified loads; back-up power solution proposed and installed if required. Review of contractor's assessment report; 100% inspection and testing upon completion. Before work begins and at project end. 2.5 IDS Certification Intrusion Detection System (IDS) is installed by a UL 2050 certified installer. Review of Documentation Prior to installation. 2.6 Perimeter Fencing 6' high chain-link fence with concertina wire installed with a 10' standoƯ; Two gates (personnel and equipment) installed at approved locations. 100% Inspection & Measurement During and after installation. 2.7 SCIF Door & Hardware One ICD-705 compliant SCIF door assembly with specified GSA-approved hardware installed. 100% Inspection; Review of Material Submittals. Upon installation. -- 2 of 4 -- 2.8 Electronic Security Systems CCTV and IDS installed per ICD-705, UL 2050, and NEC. All devices are on the APL. Exterior cabling is in rigid conduit. Review of Material Submittals; 100% Inspection; Final testing verification. Before installation and at project end. 3.1 Security & Access Personnel information for NACI checks submitted at least 7 days prior to site access. All personnel are U.S. Citizens. Review of Documentation Before any personnel access the site. 3.2 Administrative Contractor maintains active SAM.gov registration throughout the contract period. Periodic Check of SAM.gov Monthly, or prior to payment. 3.5 Warranty & Quality Control Contractor provides a minimum 1-year warranty and maintains an approved Quality Control Plan (QCP). Review of Documentation At contract start and during warranty calls. 4.1 Project Schedule A detailed work schedule (AF3064) is submitted and updated as needed. Review of Submission At project start and weekly. 4.2 Material Submittals Submittals for HVAC, generator, CCTV, SCIF door, and IDS are provided and approved. Review of Submission Prior to ordering materials. 4.3 Weekly Reports Weekly status reports with photos and work description are submitted. Review of Submission Weekly. -- 3 of 4 -- 4.4 Final Test Results Final testing results for all systems (HVAC, Electrical, ESS) are submitted and meet performance requirements. Review of Submission; Witness Final Testing. At project completion. -- 4 of 4 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)