Construct 145th Security Forces Building

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W50S87-26-B-A002
NAICS
236220
PSC
Y1BZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 3, 2026
Response due
July 8, 2026
Place of performance
Charlotte, NC

What this opportunity is

The Department of Defense is seeking a contractor to construct the 145th Security Forces Building in North Carolina, under a total small business set-aside (FAR 19.5). This opportunity is classified under NAICS 236220 and PSC Y1BZ, making it suitable for small construction firms. Interested bidders should note that the solicitation is currently open, and all amendments and relevant information will be posted on SAM.gov; bids must be submitted via standard forms and cannot be sent electronically.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Project Manual North Carolina Air National Guard, 145th Airlift Wing Charlotte Air National Guard Base Construct Security Forces Building Project No.: FJRP229030 B-3 Submittal - Final May 30, 2025 Volume 2: Divisions 22-33 -- 1 of 1196 -- Charlotte Air National Guard Base Project No.: FJRP229030 Construct Security Forces Building SECTION TABLE OF CONTENTS DIVISION 22 - PLUMBING SECTION 22 00 00 PLUMBING, GENERAL PURPOSE PART 1 GENERAL 1.1 REFERENCES 1.2 SUBMITTALS 1.3 STANDARD PRODUCTS 1.3.1 Alternative Qualifications 1.3.2 Service Support 1.3.3 Manufacturer's Nameplate 1.3.4 Modification of References 1.3.4.1 Definitions 1.3.4.2 Administrative Interpretations 1.4 DELIVERY, STORAGE, AND HANDLING 1.5 PERFORMANCE REQUIREMENTS 1.5.1 Welding 1.6 REGULATORY REQUIREMENTS 1.7 PROJECT/SITE CONDITIONS 1.8 INSTRUCTION TO GOVERNMENT PERSONNEL 1.9 ACCESSIBILITY OF EQUIPMENT PART 2 PRODUCTS 2.1 MATERIALS 2.1.1 Pipe Joint Materials 2.1.2 Miscellaneous Materials 2.1.3 Pipe Insulation Material 2.2 PIPE HANGERS, INSERTS, AND SUPPORTS 2.3 VALVES 2.3.1 Backwater Valves 2.3.2 Wall Faucets 2.3.3 Wall Hydrants (Frostproof) 2.3.4 Relief Valves 2.3.5 Thermostatic Mixing Valves 2.4 FIXTURES 2.5 BACKFLOW PREVENTERS 2.6 DRAINS 2.6.1 Floor and Shower Drains 2.6.1.1 Metallic Shower Pan Drains 2.6.1.2 Drains and Backwater Valves 2.6.2 Floor Sinks 2.6.3 Roof Drains and Expansion Joints 2.7 TRAPS 2.8 WATER HEATERS 2.9 PUMPS 2.9.1 Sump Pumps 2.9.2 Circulating Pumps 2.9.3 Flexible Connectors SECTION 22 00 00 Page 1 -- 2 of 1196 -- Charlotte Air National Guard Base Project No.: FJRP229030 Construct Security Forces Building 2.10 DOMESTIC WATER SERVICE METER 2.11 ELECTRICAL WORK 2.12 Clean-outs 2.13 MISCELLANEOUS PIPING ITEMS 2.13.1 Escutcheon Plates 2.13.2 Pipe Sleeves 2.13.2.1 Sleeves in Masonry and Concrete 2.13.2.2 Sleeves Not in Masonry and Concrete 2.13.3 Pipe Hangers (Supports) 2.13.4 Nameplates PART 3 EXECUTION 3.1 GENERAL INSTALLATION REQUIREMENTS 3.1.1 Water Pipe, Fittings, and Connections 3.1.1.1 Utilities 3.1.1.2 Cutting and Repairing 3.1.1.3 Protection of Fixtures, Materials, and Equipment 3.1.1.4 Mains, Branches, and Runouts 3.1.1.5 Pipe Drains 3.1.1.6 Expansion and Contraction of Piping 3.1.1.7 Thrust Restraint 3.1.1.8 Commercial-Type Water Hammer Arresters 3.1.2 Joints 3.1.2.1 Threaded 3.1.2.2 Mechanical Couplings 3.1.2.3 Unions and Flanges 3.1.2.4 Grooved Mechanical Joints 3.1.2.5 Cast Iron Soil, Waste and Vent Pipe 3.1.2.6 Copper Tube and Pipe 3.1.2.7 Plastic Pipe 3.1.2.8 Glass Pipe 3.1.2.9 Corrosive Waste Plastic Pipe 3.1.2.10 Polypropylene Pipe 3.1.2.11 Other Joint Methods 3.1.3 Dissimilar Pipe Materials 3.1.4 Corrosion Protection for Buried Pipe and Fittings 3.1.5 Pipe Sleeves and Flashing 3.1.5.1 Sleeve Requirements 3.1.5.2 Flashing Requirements 3.1.5.3 Waterproofing 3.1.5.4 Optional Counterflashing 3.1.5.5 Pipe Penetrations of Slab on Grade Floors 3.1.5.6 Pipe Penetrations 3.1.6 Fire Seal 3.1.7 Supports 3.1.7.1 General 3.1.7.2 Pipe Supports and Structural Bracing, Seismic Requirements 3.1.7.3 Pipe Hangers, Inserts, and Supports 3.1.7.4 Structural Attachments 3.1.8 Welded Installation 3.1.9 Pipe Cleanouts 3.2 WATER HEATERS AND HOT WATER STORAGE TANKS 3.2.1 Relief Valves 3.2.2 Heat Traps 3.2.3 Connections to Water Heaters 3.2.4 Expansion Tank 3.3 FIXTURES AND FIXTURE TRIMMINGS 3.3.1 Fixture Connections SECTION 22 00 00 Page 2 -- 3 of 1196 -- Charlotte Air National Guard Base Project No.: FJRP229030 Construct Security Forces Building 3.3.2 Flushometer Valves 3.3.3 Height of Fixture Rims Above Floor 3.3.4 Shower Bath Outfits 3.3.5 Fixture Supports 3.3.5.1 Support for Solid Masonry Construction 3.3.5.2 Support for Concrete-Masonry Wall Construction 3.3.5.3 Support for Steel Stud Frame Partitions 3.3.5.4 Support for Wood Stud Construction 3.3.5.5 Wall-Mounted Water Closet Gaskets 3.3.6 Backflow Prevention Devices 3.3.7 Access Panels 3.3.8 Sight Drains 3.3.9 Traps 3.3.10 Shower Pans 3.3.10.1 General 3.3.10.2 Metal Shower Pans 3.3.10.3 Plasticized Chlorinated Polyethylene Shower Pans 3.3.10.4 Nonplasticized Polyvinyl Chloride (PVC) Shower Pans 3.4 VIBRATION-ABSORBING FEATURES 3.5 WATER METER REMOTE READOUT REGISTER 3.6 IDENTIFICATION SYSTEMS 3.6.1 Identification Tags 3.6.2 Pipe Color Code Marking 3.6.3 Color Coding Scheme for Locating Hidden Utility Components 3.7 ESCUTCHEONS 3.8 PAINTING 3.8.1 Painting of New Equipment 3.8.1.1 Factory Painting Systems 3.8.1.2 Shop Painting Systems for Metal Surfaces 3.9 TESTS, FLUSHING AND DISINFECTION 3.9.1 Plumbing System 3.9.1.1 Test of Backflow Prevention Assemblies 3.9.1.2 Shower Pans 3.9.2 Defective Work 3.9.3 System Flushing 3.9.3.1 During Flushing 3.9.3.2 After Flushing 3.9.4 Operational Test 3.9.5 Disinfection 3.10 POSTED INSTRUCTIONS 3.11 PERFORMANCE OF WATER HEATING EQUIPMENT 3.11.1 Storage Water Heaters 3.11.1.1 Electric 3.12 TABLES -- End of Section Table of Contents -- SECTION 22 00 00 Page 3 -- 4 of 1196 -- Charlotte Air National Guard Base Project No.: FJRP229030 Construct Security Forces Building SECTION 22 00 00 PLUMBING, GENERAL PURPOSE PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) ANSI Z21.22/CSA 4.4 (2015; R 2020) Relief Valves for Hot Water Supply Systems AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) ASME A112.1.2 (2012; R 2017; R 2022) Air Gaps in Plumbing Systems (For Plumbing Fixtures and Water-Connected Receptors) ASME A112.6.1M (1997; R 2017) Floor Affixed Supports for Off-the-Floor Plumbing Fixtures for Public Use ASME A112.6.3 (2019) Standard for Floor and Trench Drains ASME A112.6.4 (2003: R 2012) Roof, Deck and Balcony Drains ASME A112.14.1 (2003; R 2017; R 2022) Backwater Valves AS

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)