Description
Red River Dining Facility | Proposal
Attachment 2 – Statement of Work/Salient Characteristics
FA460826QC077
Page 1 of 13
CUI
CUI
Combined Statement of
Work (SOW) & Salient
Characteristics
Prepared for Red River Dining Facility
Current As Of: 02 June 2026
Barksdale AFB, LA 71110
-- 1 of 13 --
Red River Dining Facility | Proposal
Attachment 2 – Statement of Work/Salient Characteristics
FA460826QC077
Page 1 of 13
CUI
CUI
Executive Summary
Scope / Description of Services
The work covered by these requirements consists of furnishing all plans, materials, labor,
equipment, appliances, and performing all operations to uninstall existing equipment and
install new food service equipment (including fryers, refrigerators, holding cabinets, ranges,
and prep tables) in the Red River Dining Facility located at Bldg. 4631.
Background
The Red River Dining Facility currently has multiple items of equipment that are aging and
need to be replaced, along with requirements for new equipment to support dining
operations. Replacement and installation of these items will help maximize effective and
proper cooking procedures and ensure proper preparation in accordance with the Tri-Service
Food Code.
Approach
The work covered under this Statement of Work shall consist of furnishing all material, labor,
and equipment necessary to provide, assemble, and install new food service equipment, as well
as remove and dispose of existing equipment identified for replacement.
Contractor will properly disconnect the existing equipment items from the building’s utilities.
They will then remove the agreed upon equipment items (government will mark equipment with
an X signifying which to remove) and move them to the designated Dining Facility warehouse to
prime for disposal. The contractor will then move the new equipment into the kitchen, uncrate
and assemble the equipment, and make all final connections to existing utilities to include
electric, water, drainage, gas, and support/anchoring.
All equipment will be installed in accordance with the manufacturer's instructions, to include
proper calibration and a test run/function check performed in front of the Government
representative. Furthermore, the contractor will ensure the removal of all packaging materials
and debris, leaving the work area in a clean and orderly condition. The installation shall be
phased to minimize disruption to dining facility operations, and the contractor must coordinate
with the project manager to establish an installation schedule.
-- 2 of 13 --
Red River Dining Facility | Proposal
Attachment 2 – Statement of Work/Salient Characteristics
FA460826QC077
Page 1 of 13
CUI
CUI
Timeline
Phase / Requirement Details
Delivery and
Installation
Ninety Days ARO.
Hours of Operations Normal hours of operation for this contract are between hours of
0800 and 1600 hours. The contractor shall perform the services
required under this contract during this time excluding
Saturdays, Sundays and Federal Holidays.
Equipment to be Installed
The following items (or equal to) are required for installation:
Ite
m #
Equipment /
Name
Qty Salient Characteristics (Or Equal)
1 Immersion blender
(Galaxy IMBL9 9”)
2 Variable speed immersion blender 2/5 hp. Removable
stainless steel blending shaft, variable speed of 4k to 16k
RPM, 60 Hz, 1 Phase, 120v, 750 watts.
2 Floor Fryer Natural
Gas 70-100 lb.
Stainless Steel
1 Tank dimensions fry pot width 18” depth 18”, all
stainless steel tank, door, front, top, ledge and header;
galvanized steel sides, easy to use thermostat,
temperature between 200-400 degrees Fahrenheit.
3 One gallon blender 2 Commercial heavy duty 3 ¾ HP, stainless steel container
with large side handles for easy usage/pouring.
4 T-link quick
disconnect 48”
coated steel gas
appliance connector
hose
2 48” coated steel gas appliance connector hose.
5 Induction Range,
Countertop Vollrath
59300 Mirage cadet
6 Measures 16”x12”, 1-20 power levels or F/C temperature
level controls, easy to read digital power level, timer,
pushbutton controls, stainless steel case, 6 ft power cord,
equipped with variety of safety features: overheat
protection, small article detection, pan auto detection,
empty pan shut off.
6 Hat lamp carving
station board
measures 20”x24”
maple wood with
juice grooves
3 A single bulb heat lamp to ensure each food item remains
warm throughout the length of buffet service made of
durable aluminum featuring a flexible body that makes it
easy to lower and raise the light. Comes with a 250W
infrared bulb and has an on/off switch that’s located on
the base for safety and easy access.
-- 3 of 13 --
Red River Dining Facility | Proposal
Attachment 2 – Statement of Work/Salient Characteristics
FA460826QC077
Page 1 of 13
CUI
CUI
Ite
m #
Equipment /
Name
Qty Salient Characteristics (Or Equal)
7 Hobart Legacy
(HL400-1 10 qt)
planetary floor
mixer w/guard &
standard
accessories
1 40 quart maximum heavy duty mixer, VFDadvantage
variable frequency drive, maximum capacity overheat
protection, reinforced planetary shaft system, triple
interlock system with magnalock technology, gear
transmission, 3 fixed speeds, plus stir speed, shift on the
fly controls, 20 minute smart timer, ergonomic swing out
bowl, open base, metallic gray hybrid powder coat finish,
stainless steel removable bowl guard, rubber foot pads
provided.
8 Hobart Buffalo
Chopper (84186-1
15 lbs)
1 Food processor with # 12 hub – 1 hp, 1725 RPM for
blades, special cutlery grade, stainless steel knives that
are capable of cutting down tough proteins in minutes,
safe guarded power switch, 6 ft flexibale power cord,
bowl 18” inside diameter.
9 Robot Coupe R2
Dice Ultra 3 qt
combination food
processor
1 5/32” slicing disc, 5/64” grating disc, 3/8” dicing kit,
continuous feed head, smooth “S” blade, 3 qt/3 liter
stainless steel batch bowl. Direct drive induction motor
(no belt), built in on/off/pulse buttons, safety and motor
brake, 1725 RPM speed, dimensions 9 1/8” x 17” x 20 ¾”
(WxDxH).
10 …
Source: SAM.gov, as posted. Verify the current solicitation before responding.