Diesel Engine Generator

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
FA527026QA032
NAICS
335312
PSC
6105
Posted
May 28, 2026
Response due
June 11, 2026
Place of performance
Yomitan Torii Station, JP-47

What this opportunity is

The Department of Defense is seeking two ultra-low-noise diesel engine generators, specifically the Denyo DCA-60LSIE or equivalent, with a focus on environmental protection and operational durability. This opportunity falls under NAICS 335312 and is suitable for small businesses capable of providing equipment that meets stringent specifications, including salt-resistant features and compliance with Tier 3 emissions standards. As a Combined Synopsis/Solicitation notice, interested vendors should track this opportunity closely to prepare for potential bidding.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Ultra-Low-Noise Diesel Engine Generator 1.Manufacturer: Denyo (or equivalent) 2.Model number: DCA-60LSIE (or equivalent) 3.Required number of units: 2 EA(both with the same specifications and options) Main specifications: Three-Power-Supply Configuration Fuel Line Switching Device (Three-Way Valve) Lockable Fuel Filler Cap Tier 3 Emission-Compliant Engine The options requested: Generator with Automatic Fuel Pump Salt-Resistant Generator Specification Salt-Resistant Specification for Charging Components Thick-Film Coating Specification Clear Coat (Fade-Resistant) Bonnet Sealing (Caulking) Stainless Steel Bolt Two-Wheel Trailer(Used for transportation during on-site maintenance. ) -- 1 of 7 -- ※Key specifications to consider when making a selection. Ultra-low noise diesel generators are designed for high-risk environments where environmental protection, power versatility, and operational durability are critical. As part of the Eco-Base series, leak prevention mechanisms are directly integrated into the chassis. ※Key specifications to consider when evaluating and selecting equivalent products. This document explains the key specifications and specific comparison candidates that should be considered when evaluating and selecting an "equivalent" product to the Denyo DCA-60LSIE. When selecting an equivalent product, it is not enough to simply have a "60kVA output"; it must also meet three other criteria: **"Eco-Base (integrated oil containment dike)", "ultra-low noise", and "compliance with the third stage of exhaust gas regulations"**. Please consider the same quality for optional accessories. -- 2 of 7 -- Equivalent Selection & Classification Matrix for Optional Equipment 📋 1. Environmental Ruggedization & Salt-Resistant Specs (Coastal/Maritime Ops) 🌊 Options designed to extend equipment life and guarantee reliable operation in harsh environments. Option Name Required Specs for Equivalent Mission Impact Salt-Resistant Generator Specification Epoxy resin coating, moisture-proof insulation treatment Prevents circuit board short-circuits and insulation degradation caused by sea breeze. Salt-Resistant Specification for Charging Components Epoxy resin coating, moisture-proof insulation treatment Prevents circuit board short-circuits and insulation degradation caused by sea breeze. Thick-Film Coating Specification Specified film thickness, weather-resistant urethane paint Prevents paint peeling and mitigates degradation from UV/IR exposure. Clear Coat (Fade-Resistant) Specified film thickness weather-resistant urethane paint Prevents paint peeling and mitigates degradation from UV/IR exposure. Bonnet Sealing (Caulking) Complete waterproof seal at the panel joint Physically blocks seawater, salt spray, and dust ingress into the interior. Stainless Steel Bolts Exterior bolts and nuts Prevents bolt seizure due to rust, maintaining field serviceability. 2. Mobility & Transport Specs (Rapid Deployment) 🚚 Options related to on-site movement and towing during on-site maintenance. Option Name Required Specs for Equivalent Mission Impact Two-Wheel Trailer Tow hook (pintle hook compatible), parking brake Enables rapid towing and relocation of the installation site. -- 3 of 7 -- 3. Output Control & Parallel Operation (Power Redundancy) ⚡ This is an option for situations requiring advanced power management. Option Name Required Specs for Equivalent Mission Impact Three-Power-Supply Configuration Simultaneous/switchable output of 3-Phase 200V/400V and Single-Phase 100/200V Supplies power to multiple distinct types of equipment from a single generator. 4. Autonomous Fuel & Oil Operation (Unmanned Endurance) ⛽ This is an option to enable long-term continuous operation. Option Name Required Specs for Equivalent Mission Impact Fuel Line Switching Device (Three-Way Valve) Flow path switching valve between internal and external tanks Allows connection to external bulk tanks (e.g., drums) without shutting down the engine. Auto Pump Generator Specialized control module linked to drainage pumps, etc. Automates unmanned drainage/pumping operations during heavy rainfall. -- 4 of 7 -- SHIP TO: Directorate of Public Works- U.S Army Garrison Okinawa Torii Station Bldg#360 Macarthur Dr., Torii Station, Okinawa, Japan Shizai-Kyoku, Sobe, Yomitan-son Okinawa, Japan 904-0304 POC: Mr. Salud H. Dennis DSN: 315-652-4660 From US: 011-81-98-961-7777-652-4660 *Delivery/ Shipping: how you would like contractor to deliver. “Door-to-door” DELIVERY SCHEDULE: The contractor shall coordinate with the Government Representative (GR) and delivery the equipment 120 days ARO. *Technical POC: Mr. Satoshi Ikehara, (Email: satoshi.ikehara.ln@army.mil) *Payment (WAWF POC): Ms. Noriko Kaneko (Email:noriko.kaneko.ln@army.mil) DELIVERY AND STORAGE: The equipment delivered and places in storage shall be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminations by the contractor. RESPONSIBILITY FOR DAMAGES: Any damages to the equipment incurred during the delivery process of this contract shall be replaces or repaired to its original condition at no cost to the U.S. Government. -- 5 of 7 -- Installation: The Contractor shall provide the necessary personnel, supervision, management, tools, equipment, transportation, materials, and all other goods or services required for connections, power hookups, necessary mechanical assembly, and other requisite tasks. Test Run and Adjustment: The Contractor shall conduct commissioning to verify that the startup, shutdown, and load testing procedures function properly, and shall perform adjustments as necessary. Optional functions shall be verified using the same methodology. (Records of the commissioning and adjustments shall be maintained and provided to the site.) Local support: The Contractor shall provide on-site support—covering maintenance, repairs, and parts supply—within the island. The equipment shall be accompanied by a manufacturer's wa

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 335312)