What this opportunity is
The Department of Defense is seeking two ultra-low-noise diesel engine generators, specifically the Denyo DCA-60LSIE or equivalent, with a focus on environmental protection and operational durability. This opportunity falls under NAICS 335312 and is suitable for small businesses capable of providing equipment that meets stringent specifications, including salt-resistant features and compliance with Tier 3 emissions standards. As a Combined Synopsis/Solicitation notice, interested vendors should track this opportunity closely to prepare for potential bidding.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Ultra-Low-Noise Diesel Engine Generator
1.Manufacturer: Denyo (or equivalent)
2.Model number: DCA-60LSIE (or equivalent)
3.Required number of units: 2 EA(both with the same specifications and options)
Main specifications:
Three-Power-Supply Configuration
Fuel Line Switching Device (Three-Way Valve)
Lockable Fuel Filler Cap
Tier 3 Emission-Compliant Engine
The options requested:
Generator with Automatic Fuel Pump
Salt-Resistant Generator Specification
Salt-Resistant Specification for Charging Components
Thick-Film Coating Specification
Clear Coat (Fade-Resistant)
Bonnet Sealing (Caulking)
Stainless Steel Bolt
Two-Wheel Trailer(Used for transportation during on-site maintenance. )
-- 1 of 7 --
※Key specifications to consider when making a selection.
Ultra-low noise diesel generators are designed for high-risk environments where
environmental protection, power versatility, and operational durability are critical. As part
of the Eco-Base series, leak prevention mechanisms are directly integrated into the
chassis.
※Key specifications to consider when evaluating and selecting equivalent products.
This document explains the key specifications and specific comparison candidates that
should be considered when evaluating and selecting an "equivalent" product to the Denyo
DCA-60LSIE. When selecting an equivalent product, it is not enough to simply have a
"60kVA output"; it must also meet three other criteria: **"Eco-Base (integrated oil
containment dike)", "ultra-low noise", and "compliance with the third stage of exhaust gas
regulations"**.
Please consider the same quality for optional accessories.
-- 2 of 7 --
Equivalent Selection & Classification Matrix for Optional Equipment 📋
1. Environmental Ruggedization & Salt-Resistant Specs (Coastal/Maritime Ops) 🌊
Options designed to extend equipment life and guarantee reliable operation in harsh
environments.
Option Name Required Specs for
Equivalent
Mission Impact
Salt-Resistant Generator
Specification
Epoxy resin coating,
moisture-proof insulation
treatment
Prevents circuit board short-circuits and
insulation degradation caused by sea
breeze.
Salt-Resistant Specification
for Charging Components
Epoxy resin coating,
moisture-proof insulation
treatment
Prevents circuit board short-circuits and
insulation degradation caused by sea
breeze.
Thick-Film Coating
Specification
Specified film thickness,
weather-resistant urethane
paint
Prevents paint peeling and mitigates
degradation from UV/IR exposure.
Clear Coat (Fade-Resistant) Specified film thickness
weather-resistant urethane
paint
Prevents paint peeling and mitigates
degradation from UV/IR exposure.
Bonnet Sealing (Caulking) Complete waterproof seal at
the panel joint
Physically blocks seawater, salt spray, and
dust ingress into the interior.
Stainless Steel Bolts Exterior bolts and nuts Prevents bolt seizure due to rust,
maintaining field serviceability.
2. Mobility & Transport Specs (Rapid Deployment) 🚚
Options related to on-site movement and towing during on-site maintenance.
Option Name Required Specs for Equivalent Mission Impact
Two-Wheel
Trailer
Tow hook (pintle hook compatible),
parking brake
Enables rapid towing and relocation of the
installation site.
-- 3 of 7 --
3. Output Control & Parallel Operation (Power Redundancy) ⚡
This is an option for situations requiring advanced power management.
Option Name Required Specs for Equivalent Mission Impact
Three-Power-Supply
Configuration
Simultaneous/switchable output of 3-Phase
200V/400V and Single-Phase 100/200V
Supplies power to multiple
distinct types of equipment from a
single generator.
4. Autonomous Fuel & Oil Operation (Unmanned Endurance) ⛽
This is an option to enable long-term continuous operation.
Option Name Required Specs for Equivalent Mission Impact
Fuel Line Switching
Device (Three-Way
Valve)
Flow path switching valve
between internal and external
tanks
Allows connection to external bulk tanks
(e.g., drums) without shutting down the
engine.
Auto Pump Generator Specialized control module
linked to drainage pumps, etc.
Automates unmanned drainage/pumping
operations during heavy rainfall.
-- 4 of 7 --
SHIP TO: Directorate of Public Works- U.S Army Garrison Okinawa
Torii Station
Bldg#360
Macarthur Dr., Torii Station, Okinawa, Japan
Shizai-Kyoku, Sobe, Yomitan-son Okinawa, Japan 904-0304
POC: Mr. Salud H. Dennis
DSN: 315-652-4660
From US: 011-81-98-961-7777-652-4660
*Delivery/ Shipping: how you would like contractor to deliver. “Door-to-door”
DELIVERY SCHEDULE: The contractor shall coordinate with the Government
Representative (GR) and delivery the equipment 120 days ARO.
*Technical POC: Mr. Satoshi Ikehara, (Email: satoshi.ikehara.ln@army.mil)
*Payment (WAWF POC): Ms. Noriko Kaneko (Email:noriko.kaneko.ln@army.mil)
DELIVERY AND STORAGE: The equipment delivered and places in storage shall be
protected from the weather, humidity and temperature variations, dirt and dust, or other
contaminations by the contractor.
RESPONSIBILITY FOR DAMAGES: Any damages to the equipment incurred during the
delivery process of this contract shall be replaces or repaired to its original condition at no
cost to the U.S. Government.
-- 5 of 7 --
Installation: The Contractor shall provide the necessary personnel, supervision,
management, tools, equipment, transportation, materials, and all other goods or
services required for connections, power hookups, necessary mechanical assembly,
and other requisite tasks.
Test Run and Adjustment: The Contractor shall conduct commissioning to verify that the
startup, shutdown, and load testing procedures function properly, and shall perform
adjustments as necessary. Optional functions shall be verified using the same
methodology. (Records of the commissioning and adjustments shall be maintained and
provided to the site.)
Local support: The Contractor shall provide on-site support—covering maintenance,
repairs, and parts supply—within the island. The equipment shall be accompanied by a
manufacturer's wa…
Source: SAM.gov, as posted. Verify the current solicitation before responding.