1
July 27, 2026
Project: Tree removal
Site : Blue Roof Compound
Avenida de Portugal
Dili, Timor-Leste
Scope of Work
of Tree Removal
1. Scope of Work
To provide all labor, supervision, equipment, services, and expertise necessary to perform
removal of one big banyan tree including the removal of its stump inside the blue roof housing
compound in Dili, Timor-Leste. Since this work is of a potentially dangerous nature, and
requires special expertise, it is to be performed by an experienced contractor work and whose
employees are highly trained and skilled in all phases of tree service work. Contractor must
have been in business for at least five years. The Contracting Officer’s Representative (COR)
will require proof of Contractor's involvement in tree service work. The Contractor shall use
special care to protect public and private property. The Contractor shall take special care so as
not to damage any utility lines in the process of cutting and removing the trees. The Contractor
shall maintain proper barricades and watchpersons during the cutting and removal of trees.
2. GENERAL
The contractor shall provide all labor, tools, equipment, materials, supervision and services,
unless otherwise specified, to complete the work required herein. All equipment necessary or
required in connection with this type of work must be on hand, proven to be in first class
working condition, and approved by the COR before this work will be permitted to begin.
All the work and procedures in the contract shall be performed in conformity to the
specifications. All local labor standards for occupational safety and health apply to this
construction contract. All work will be performed to the highest standard of quality in a first
class manner.
2.1 Contractor must take full responsibility for their employee and subcontractors from the
beginning to end of the project.
2.2. Contractor must employ only workers legally authorized to work.
2.3. Contractor will provide the necessary protective clothing, safety strap for working on high
level, mask safety glass, for their employees and will enforce all safety/accident
prevention regulations as required by the local government and hold the U.S.
-- 1 of 10 --
2
Government harmless in all such matters.
2.4. The contractor will perform top-quality work and in accordance with the Scope of Work
and ensure the required guarantee for his work.
2.5 The contractor will be responsible to prevent, or if occurs, repair any and all damages
caused by the contractor or contractor’s employees.
2.6. Contractor is to provide all materials, tools, equipment, transportation and other
facilities necessary for the execution and completion of the work.
2.7. Contractor must report immediately any accident that may happen during work.
2.8. CONTRACTOR’S QUALIFICATIONS
In order to be considered for Contract award, the Bidder must be able to demonstrate
that they currently provide, or has provided Trimming & Removal Services that is similar
in size and scope to this Contract. The Bidder must have three references documenting
previously performed Tree Trimming & Removal Services. References shall be provided
in a Reference Sheet. The Contractor shall be regularly engaged in providing the services
stated in this Scope of Work for a minimum of three (3) consecutive years within the last
five (5) years. Prior to award of a Contract, the POC reserves the right to inspect the
Bidder’s equipment condition, capabilities, staff experience, training, and storage
capabilities as they relate to the performance of this Contract.
3. Work Procedures
3.1 Equipment: All bidders must have in their possession or available to them by formal
agreement at the time of bidding: trucks, devices, chippers, hand tools, aerial and other
equipment, and supplies which are necessary to perform the work as outlined in these
specifications. The COR may inspect such equipment or agreements prior to the
awarding of a contract.
3.2. Tree Location: Work limited to trees located on U.S. GOV -owned property. All work
under this contract shall be assigned by supplying the Contractor with a list of trees that
have been marked if tree is to be removed. The U.S. GOV reserves the right to change,
add, or delete areas or quantities to be removed as it deems to be in its best interest.
Removal operations will commence no later than thirty (30) days after the contract has
been awarded. The Contractor will be responsible for notifying the appropriate utility
authority before pruning trees in the utility wires. Contractor will be responsible for any
damage to utilities during the removal or treatment process.
3.3. Supervision: Contractor consults with the COR concerning details of scheduling of all
work. Contractor has a competent person in charge of his work at all times to whom the
POC may issue directives and who shall accept and act upon such directives. Failure for
the supervisor to act on said directives shall be sufficient cause to give notice that the
Contractor is in default of contract unless such directives would create potential
-- 2 of 10 --
3
personal injury of safety hazards.
3.4. Inspections: The COR inspects work at its discretion. Immediate correction of any
work not done to industry standards as noted by the COR will be communicated to the
contractor and will be performed by the contractor at no additional expense to the US
Government.
3.5. Traffic Control: The contractor shall be solely responsible for pedestrian and
vehicular safety and control within the work site and shall provide the necessary
warning devices, barricades, and personnel needed to give safety, protection, and
warning to persons and vehicular traffic within the area.
3.6. Utility Agencies: Are contacted by Contractor any time assistance is needed to work
safely around overhead or underground installations. Tree pruning, removal operations
may be conducted in areas where overhead electric, telephone, and cable television
facilities exist. The Contractor sha…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 561730)
Landscaping at NOAA Weather Forecase Office in White Lake (Detroit), MI (DTX)
COMMERCE, DEPARTMENT OF · Solicitation · due July 29, 2026
S208--Tree Removal Service - Dead and Damaged - Pineville, LA
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 28, 2026
Tree Removal Services, Littleville Lake and Knightville Dam, Huntington, MA
DEPT OF DEFENSE · Solicitation · due July 28, 2026
Tree Maintenance Services, Fort Smith National Cemetery
VETERANS AFFAIRS, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 19, 2026
Landscaping at NOAA Weather Forecast Office in Topeka, KS
COMMERCE, DEPARTMENT OF · Solicitation · due July 29, 2026
Landscaping at NOAA Weather Forecast Office in Rapid City, SD (UNR)
COMMERCE, DEPARTMENT OF · Solicitation · due July 29, 2026