What this opportunity is
The Department of Defense is soliciting for the DISCHARGER contract, which falls under NAICS code 333998, indicating the procurement involves manufacturing and/or repairing of machinery and equipment not elsewhere classified. This opportunity is suitable for small businesses, particularly those with experience in machinery and equipment manufacturing or repair. As a solicitation, this contract will be awarded based on competitive bidding, requiring interested parties to submit a formal bid in response to the solicitation.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CONTACT INFORMATION|4|N9743C|FCA|771-229-4487|drew.m.fink.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
STOP-WORK ORDER (AUG 1989)|1||
GENERAL INFORMATION-FOB-DESTINATION|1|B|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Inspection / Acceptance Point - Source|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|navsupwawf.wss.ftc@navy.mil|
NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1||
NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
BOTH GROUND CORDS (P/N 09821 & 14213)CAN BE SUPPLIED BY VENDOR.
All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or
sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein.
\
GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED.
DELIVERY_______________DAYS.
All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile,
or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture of the DISCHARGER, .
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
3.1 Manufacturing and Design - The DISCHARGER, furnished under this contract/purchase order shall meet the material and physical requirements as specified ;P/N:42465 (Design Cage:1MH97); .
3.2 Marking - Unless marking requirements are specified by a document or drawing cited in this solicitation all items delivered under this contract/purchase order shall be marked and identified in accordance with the applicable Military Standards and
Specifications as follows:
Mechanical Parts, Assemblies and Equipments - MIL-STD-130
Electrical and Electronic Parts - MIL-STD-1285, Method 1.
Electrical and Electronic Parts and Assemblies not covered
by MIL-STD-1285-use MIL-STD-130.
Electronic Equipment - MIL-STD-454 Requirement Number 67.
Electrical Equipment - MIL-P-15024/5 (SHIPS)
3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and
approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the
substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer
will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:
Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not
effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable.
Code 2: Assembly (or set or kit) not furnished - Used following detail parts.
Code 3: Part not furnished separately - Use assembly.
Code 4: Part redesigned - Old and new parts are completely interchangeable.
Code 5: Part redesigned - New part replaces old. Old part cannot replace
new.
Code 6: Part redesigned - Parts not interchangeable.
4. QUALITY ASSURANCE
4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,
the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any
inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for a…
Source: SAM.gov, as posted. Verify the current solicitation before responding.