Description
USCGC WAESCHE (WMSL 751)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2027
Developed By: SFLC LREPL AMP-2
CWO JOSH B. SMITH
(REV-0, 29 MAY 2026)
TABLE OF CONTENTS
Revisions Record iii
Consolidated List of References iv
Consolidated List of Government-furnished Property x
Consolidated List of Critical Inspection Items xxi
Principal Characteristics xxii
General Requirements 1
WORK ITEM 1: Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect 14
WORK ITEM 2: Tanks (MP Fuel Storage and Overflow), Clean and Inspect 19
WORK ITEM 3: Tanks (MP Fuel Service), Clean and Inspect 25
WORK ITEM 4: Tanks (Ballast), Clean and Inspect 30
WORK ITEM 5: Voids (Accessible), Clean and Inspect 35
WORK ITEM 6: Ship Service Diesel Generator, Engine Major Overhaul 40
WORK ITEM 7: Reverse Osmosis, System Groom 63
WORK ITEM 8: Side Boat Davit, Renew 73
WORK ITEM 9: Stern Notch Pads, Renew 87
WORK ITEM 10: Folding Boom Cranes, Biennial Maintenance, Perform 90
WORK ITEM 11: Deck Covering (Polymeric), Repair and Seal 99
WORK ITEM 12: Decks, Preserve 103
WORK ITEM 13: Deck Covering (Electrical Insulating Sheet), Renew 118
WORK ITEM 14: Deck Covering (Polymeric), Renew 124
WORK ITEM 15: Tenting, Provide 131
WORK ITEM 16: Deck Covering (Slip-Resistant), Renew 135
WORK ITEM 17: Cracks (GT Collector and Exhaust), Repair 145
WORK ITEM 18: Elex Dry Air Compressor Equipment, Install 155
WORK ITEM 19: Stern Door HPU Cooler, Install 165
WORK ITEM 20: Fire Prevention, Provide 170
WORK ITEM 21: Sea Trial Performance, Support, Provide 173
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel with a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE
REV#
WORK ITEM#
CHANGES MADE
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 26B-CB-IV-801-001, Rev -, Booklet of General Plans
Coast Guard Drawing 35-LRI-II-801-001, Rev -, General Arrangement
Coast Guard Drawing 418A-WMSL 100-006, Rev A, Inboard and Outboard Profiles
Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements
Coast Guard Drawing 418A-WMSL-167-006, Rev -, Stern Ramp Cofferdam
Coast Guard Drawing 418A-WMSL-185-001, Rev A, Air Compressor and Receiver Foundation Installation
Coast Guard Drawing 418A-WMSL-202-001, Rev C, Elex Dry Air Compressor Control Installation
Coast Guard Drawing 418A-WMSL-320-013, Rev B, Elex Dry Air Compressor Power Installation
Coast Guard Drawing 418A-WMSL-540-001, Rev C, Fuel Oil Diagram
Coast Guard Drawing 418A-WMSL-540-002, Rev A, Diesel Eng and Gas Turb LO Fill, Trans, & Service Sys
Coast Guard Drawing 418A-WMSL-551-001, Rev A, Compressed Air Diagram
Coast Guard Drawing 418A-WMSL-551-003, Rev C, Elex Dry Air Compressor and Equipment Installation
Coast Guard Drawing 418A-WMSL-556-007, Rev-, Stern Door Hydraulic Oil Cooler Install
Coast Guard Drawing 418A-WMSL-801-002, Rev A, Booklet of General Plans
Coast Guard Drawing 750 WMSL-100-530, Rev G, Modifications incidental to the installation of Allied Dual Pont Davit
Coast Guard Drawing 750-WMSL 536-001, Rev - THERMAL & ACOUSTIC INSULATION
Coast Guard Drawing 750-WMSL-085-003, Rev A, Compartment Areas & Volumes NSC 1 & NSC 2 (Only) (ASC085012)
Coast Guard Drawing 750-WMSL-100-011, Rev J, Unit 1110 Structure – Inner Bottom, 1st Platf & 2nd Deck – Bow to Fr 10 (ASC100111)
Coast Guard Drawing 750-WMSL-100-013, Rev L, Unit 1210 Structure – Inner Bottom To 1st Platform – Fr 10 to Fr 22 (ASC100121)
Coast Guard Drawing 750-WMSL-100-017, Rev L, Unit 1310 Structure – Inner Bottom to 1st Platform – Fr 22 to Fr 35 (ASC100131)
Coast Guard Drawing 750-WMSL-100-018, Rev L, Unit 1320 Structure - 1st Platform to 2nd Deck - Fr 22 to Fr 35 (ASC100132)
Coast Guard Drawing 750-WMSL-100-021, Rev F, Unit 2100 Structure – Inner Bottom – Fr 35 to Fr 44 (ASC100210)
Coast Guard Drawing 750-WMSL-100-022, Rev L, Unit 2110 Structure Inner Bottom to 1st Pltf Fr 35 – 44 (ASC100210)
Coast Guard Drawing 750-WMSL-100-027, Rev L, Unit 2210 Structure – Inner bottom to 1st Platform - Fr 44 to Fr 52 (ASC100221)
Coast Guard Drawing 750-WMSL-100-028, Rev J, Unit 2220 Structure – 1st Platf to 2nd Deck – Fr 44 to Fr 52 (ASC100222)
Coast Guard Drawing 750-WMSL-100-030, Rev M, Unit 2240 Structure - Main Dk to 01 Lvl - Fr 44 to Fr 52 (ASC100224)
Coast Guard Drawing 750-WMSL-100-031, Rev K, Unit 2300 Structure – Inner Bottom – Fr 52 to Fr 64 (ASC1000230)
Coast Guard Drawing 750-WMSL-100-033, Rev J, Unit 2320 - 1st Platform to 2nd Deck - Fr 52 to Fr 64 (ASC100232)
Coast Guard Drawing 750-WMSL-100-035, Rev M, Unit 2340 Structure Main Deck to 01 Level – Fr 52 to Fr 64 (ASC100234)
Coast Guard Drawing 750-WMSL-100-036, Rev N, Unit 3110 Structure 1st Platform and Below Frs 65-77 (ASC100311)
Coast Guard Drawing 750-WMSL-100-038, Rev K, Unit 3130 Structure - 2nd Deck to Main Deck - Fr 64 to Fr…