Equipment Rental Guam- Portable Toilets, Dumpster Services, and Generator for 1st LAAD

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
M2900026Q5003
NAICS
562111
PSC
S222
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 1, 2026
Response due
June 5, 2026
Place of performance
GU

What this opportunity is

The Department of Defense is seeking a contractor to provide portable toilets, dumpster services, and generator support for the 1st LAAD Battalion during the Valient Shield exercise at Andersen Air Force Base, Guam. This opportunity is set aside for total small businesses under NAICS 562111. Interested vendors should note that this is a combined synopsis/solicitation, indicating they will need to track the notice closely for bidding details and requirements. Services are required from June to July 2026, with specific dates and quantities outlined in the performance work statement.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

DISTRIBUTION: DoW COMMUNITY ONLY PERFORMANCE WORK STATEMENT TRUCK AND EQUIPMENT REQUIREMENTS IN SUPPORT OF 1st LAAD BN VALIENT SHIELD 2603 ANDERSON AIR FORCE BASE (AAFB), GUAM 1.0 SCOPE OF WORK. In accordance with the schedule of supplies and services, the contractor shall support users who require porta-john, dumpster, and generator services for VALIENT SHIELD 26.3. The contractor shall provide porta-john support during the period of 15 June through 8 July 2026, dumpster services during the period of 15 June through 5 July 2026, and generator support on 10 June through 5 July 2026 as requested on demand to support US Forces as outlined in section 2.0 of this performance work statement. 2.0 DESCRIPTION OF SERVICES. The contractor will support as follows: Anderson AFB, Guam, Northwest Field and Mason Range Unit QTY Dates Drop off Requirements 1 st LAAD BN 2 15 June – 8 July North-West Field 55P BR 69527 07675 Porta-Johns w/ cleaning services 1 st LAAD BN 7 15 June – 8 July Mason Range 55P BR 68688 08987 Porta-Johns w/ cleaning services 1 st LAAD BN 1 15 June – 5 July Mason Range 55P BR 68688 08987 Dumpster Services with trash pick-up services 1 st LAAD BN 1 10 June – 5 July Mason Range 55P BR 68688 08987 35KW Generator w/ re-fueling 2.1 Additional service required: Porta-Johns w/ cleaning services- The contractor shall provide one (1) portable sanitary facility, which includes one (1) western- style toilet and one (1) urinal, which will include toilet paper and hand sanitizer. The contractor shall ensure that facilities are continuously monitored to ensure that portable sanitary facilities are clean and sanitary, and that toilet paper is available. The contractor shall check portable sanitary facilities at least every 3 days for duration of contract to ensure cleanliness and re-stock supplies (i.e., toilet paper) and removal/disposal of grey water. Evidence such as keeping and updating an inspection checklist inside the portable sanitary facilities units is required. Unit Price shall include cleaning and waste removal to ensure clean and sanitary conditions. Unit Price shall include toilet paper and hand sanitizer. The contractor shall dispose of waste in accordance with all applicable Department of Defense, Local, State, Federal, and Host Nations laws, regulations, and standards for services and supplies. -- 1 of 5 -- PERFORMANCE WORK STATEMENT TRUCK AND EQUIPMENT REQUIREMENTS IN SUPPORT OF 1st LAAD BN VALIENT SHIELD ANDERSEN AFB, GUAM 2 DISTRIBUTION: DoW COMMUNITY ONLY Dumpster Services with trash pick-up services- The contractor shall provide dumpster with a minimum storage of 6 cubic meters to be dropped off on the first day of service with daily service and picked up on the last day of service. Emptying of dumpster every Monday, Wednesday, and Friday for duration of contract, and the proper disposal of trash, garbage, and waste. Where trash is required to be segregated, the contractor shall be responsible for segregating the material at the time of receipt from the requiring activity. The emptying of each container includes the complete removal of all refuse from the container and the removal of all bagged refuse at the container location. In addition, the Contractor is responsible for cleaning up all refuse that is spilled during the servicing/emptying process. The contractor shall provide all labor, material, transportation, and equipment required for the delivery, installation, emptying, cleaning, and pickup of the dumpster at the end of the period of performance. The contractor shall hold or obtain the required dumping and disposal permits. (Unless U.S. Government disposal points are identified explicitly in the contract schedule). Waste shall primarily consist of plastic, cardboard, and subsistence residue. Hazardous and medical waste shall be placed separate. 35KW Generator w/ re-fueling - Contractor shall provide a portable, fuel-powered, electric generator capable of supplying power to portable lighting and miscellaneous portable electrical equipment (radios, stereos, hand tools, etc.). Generators shall include a circuit breaker protector including four (4) 50-FT extension cords with enough power boards to support 20 110-220VAC US outlets with surge protection. The contractor shall ensure portable electric generator is available for inspections and testing prior to arrival of requiring activity. Contractor shall provide uninterrupted power. The contractor shall ensure generators are delivered with all necessary parts in accordance with the operator’s manual and must have a full tank of fuel. The U.S. Government shall not be responsible for returning generators with a full tank or pay to refuel the equipment at the end of the Period of Performance. The contractor shall be responsible to refueling generators. The contractor shall provide repair and /or replacement services for the equipment. 3.0 LOCAL CONTRACTOR COORDINATION. The Contracting Officer will be responsible for ensuring the selected contractors provide the requested services; overseeing initial installation; and reporting service interruptions to the 1st MAW Contracting Officer. Assistance with local contractor support representatives can be accomplished by contacting: 4.0 PERIOD OF PERFORMANCE. Anderson Air Force Base, Guam, Northwest Field, Mason Range – 10 June through 8 July 2026 (See 2.0 for specific location and date of installation/service) -- 2 of 5 -- PERFORMANCE WORK STATEMENT TRUCK AND EQUIPMENT REQUIREMENTS IN SUPPORT OF 1st LAAD BN VALIENT SHIELD ANDERSEN AFB, GUAM 3 DISTRIBUTION: DoW COMMUNITY ONLY 5.0 MAINTENANCE The contractor will be responsible for all fees required for transport throughout the duration of the contract period. The contractor shall be responsible for the maintenance of the supporting equipment to ensure performance of the service. 5.1 Safety Items. The Contractor must maintain equipment pursuant to local city and country safety requirements. The contractor is res

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 562111)