What this opportunity is

The Department of Defense is seeking a contractor to perform repair and preservation work on a 25UB1307 Boat (FAS-33) at the contractor's yard. This solicitation, classified under NAICS 336611, is suitable for small businesses specializing in marine repair and maintenance. Interested vendors should note that this is a solicitation notice, indicating that they will need to prepare a bid for consideration rather than simply tracking the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Shio/HULL NO. Ship/HULL NAME Rev: Key Op: FAS-33 COMFLEACT SASEBO OPS JON: ICN: N6105826PRPR932 A01 TITLE: 25UB1307 Boat (FAS-33); repair/preserve Anticipated Award Date: POP Start Date: PREPARED BY: D.MIYAZAKI APPROVED BY: S.MURAKAMI CONCURRED BY: S.MOROOKA ASSIST PLANNER'S NAME: D.AKAMINE ASSIST PLANNER'S NAME: ASSIST PLANNER'S NAME: DESCRIPTION: JSN{S): 2024OPS008 S/F CONTACT: M.KAWABATA /MMC TRAN, AN.T Approved by S300/S900 Work Completed S/Force: SHIPSUPT: Date: JOB SPECIFICATION Production Completion Date: POP End Date: CODE H Ml --5]!,t_ l CODE S225 A,fO CODE S231 , CODE E AK CODE CODE CASREP# CWP# Date: Rate: Date: SRF CONTROL NO.: WORK CERTIFICATION SIGNATURES COMPLETION OF WORK REVIEW: I BADGE NO.: SHOP/CODE: PREPARING ACTIVITY: SASEBO DATE 3/28/2024 CCNS# AVL: FY24 LWC: PHONE: DATE: 06/09/2026 08/01/2026 09/01/2026 11/30/2026 12/15/2026 -- 1 of 7 -- Shio/HULL NO. Shio/HULL NAME I ICN: JON: N6105826PRPR932 Rev: Key Op: FAS-33 COMFLEACT SASEBO OPS TITLE: 25UB1307 Boat (FAS-33); repair/preserve l. SCOPE: 1.1 Title: 25081307 Boat (FAS-33); repair/preserve 1.2 Location of Work: 1.2.1 Contractor's Yard 1. 3 Identification: 1.3.1 Quantity (One EA), 25081307 Boat, Principal Dimension as Follows MFR Length (Overall) Beam with Rub Rail Height Light Weight Installed Power METAL SHARK, LLC 27 Feet - 5 Inch 8 Feet - 6 Inch 9 Feet - 9 Inch 5,537 LBS 230 HP 1.3.2 A Total of (580 SF), Preservation Area of Aluminum A01 Alloy Boat for Underwater Hull, Freeboard, Cabin, Bulwark, Main Deck, Engine Guard, Tow Post Safet Screen and Deck Fitting 1.3.3 A Total of (220 SF), Preservation Area of Aluminum Alloy Boat for Structure Member, Main Deck, Bulwark, Transom and Step for Nonskid (Peel and Stick) Deck Covering 1.3.4 A Total of (170 SF), Nonskid (Peel and Stick) Deck Covering on Main Deck, Top of Bulwark, Top of Generator/Engine Starting Battery Compartment and Step 1.3.5 Quantity (One EA), Zinc Anode on Transom 1.3.6 Quantity (One EA), AFT Curtain (Size: 48 Inch Width by 78 Inch Height) for Cabin Access 1.3.7 Quantity (One EA), Seat in Front of Cabin 1.3.8 A Total of (55 LF), Rubber Fender (4-1/2 Inch Height) on Hull 1.3.9 Quantity (2 EA), Windshield Wiper and Motor, P/N: 539324 and 30991 2. REFERENCES: 2.1 2.2 Standard Items (FY26) 25C-100-001, General Arrangement Outboard Profile -- 2 of 7 -- Shin/HULL NO. Shin/HULL NAME I Rev: Key Op: JON: FAS-33 COMFLEACT SASEBO OPS TITLE: 25UB1307 Boat (FAS-33); repair/preserve 2.3 25C-100-003, Hull Structure 2.4 25C-150-001, Console 2.5 25C-170-001, Doors and Hatches 2.6 25C-180-001, Engine Guard 2.7 25C-200-001, Propulsion Equipment 2.8 25C-580-001, AFT Tow Post ICN: N6105826PRPR932 2.9 25C-580-002, AFT Tow Post Safety Screen 2 .10 25C-600-001, Dive Door 2 .11 25C-610-001, Hoisting Fittings 2.12 25C-630-001, Cleats and Handrails 2.13 803-921865, Cathodic Protection, Hull Zinc Protection 2.14 25C-300-001, DC Electrical Schematic 2.15 25C-300-002, DC Electrical Components 2.16 25C-400-001, Dash Arrangement I 2.17 MIL-STD-2003B, Electric Plant Installation Standard Methods for Surface Ships and Submarines A01 2.18 MIL-STD-1310H(NAVY), Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse(EMP) Mitigation, and Safety 3. REQUIREMENTS: 3.1 Hoist and set the boat listed in 1.3.1 on the blocks (either in land or a barge) in contractor's yard to accomplish repair and preservation work. 3.1.1 Immediately after the boat has been set on the blocks, remove marine growth and clean entire underwater hull using fresh water. 3.1.2 Bounce the boat necessary to preserve the underwater hull. 3.1.3 Remove each existing zinc anode listed in 1.3.5 for preservation work. 3.1.4 Disconnect mechanically and remove each electrical cable from foundation and cable hanger to facilitate preservation work and install the same upon completion of preservation work. -- 3 of 7 -- Shin/HULL NO. Shin/HULL NAME 1 ICN: Rev: Key Op: JON: I N6105826PRPR932 FAS-33 COMFLEACT SASEBO OPS A01 TITLE: 25UB1307 Boat (FAS-33); repair/preserve 3.1.5 Upon completion of repair and preservation work, and after approval of CFAS PORT OPERATION, lower or return the boat onto water. 3.2 Accomplish the requirements for repair of the boat listed in 1.3.1 as follows, using 2.2 through 2.12 and ENCLOSURE (Al for guidance. 3.2.1 Remove each existing, template, fabricate and install new curtain listed in 1.3.6 out of new marine fabric or Equal with each new fastener. 3.2.2 Remove each existing and re-upholster seat listed in 1.3.7 out of new artificial leather conforming to A-A-59517 Class One or Equal with cushion. 3.2.3 Remove each existing, fabricate and install new rubber fender listed in 1.3.8 out of new rubber sheet conforming to MIL-PRF-900F with each new fastener and existing retainer plate. 3.2.3.1 Clean each existing surface of retainer plate. 3.2.4 Remove each existing and install new windshield wiper and motor listed in 1.3.9, using 2.14 through 2.16 for guidance. 3.2.4.1 Adjust and align each arm and blade of each new windshield wiper. 3.2.4.2 Connect and verify connections. 3.2.4.3 Cable installation, penetration, connection, cable tag, wire marking and cable way must be in accordance with 2.17. Install channel rubber between electrical cable surfaces and banding straps. The channel rubber must conform to MIL-PRF-6855F, Class 2, Grade 60. 3.2.4.4 Bonding and grounding must be in accordance with 2.18. (V) (G) "OPERATIONAL TEST" 3.2.4.5 Accomplish an operational test of each new windshield wiper and motor to verify correct operation, using 2.14 for guidance. -CFAS OPS, Sl30 3.3 Accomplish the requirements of 009-32 of 2.1, including Table One, Line 13, Columns A (SSPC-SP 17), B and E (Finish color; Black), for underwater hull, Table 2, Line 53, Columns A (SSPC-SP 17), B and G for each surface area listed in 1.3.2, using manufacture's instruction for guidance. An aluminum oxide abrasive blast media must not be used. -S130 (See NOTE 4.3) 3.3.1 Power to

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.