FEMA Boiler Replacement - Bothwell, WA
HOMELAND SECURITY, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
70FA5026Q00000011
NAICS
238220
PSC
J045
Set-aside
No Set aside used
Posted
July 17, 2026
Response due
July 30, 2026
Place of performance
Bothell, WA
What this opportunity is
The Department of Homeland Security is buying boiler replacement services for a location in Bothwell, WA. This procurement is suitable for any business, as there is no set-aside used. The work involves plumbing, heating, and air-conditioning contractors, as indicated by the NAICS code 238220. Since this is a Combined Synopsis/Solicitation notice, businesses should be prepared to bid immediately rather than tracking a potential future solicitation.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
Boiler Replacement SOW
Statement of Work (SOW)
Boiler Replacement - FEMA Bothell MERS
200 228th St SW, Bothell, WA 98021
1.0 Background
The Bothell Mobile Emergency Response Support (MERS) Detachment is a FEMA entity located in
Bothell, Washington, where forty-seven staff members operate out of the Vehicle Storage
Administrative Building (VSAB). Established in 1987, the Bothell MERS mission provides
emergency communications support to FEMA’s Response Directorate under the Disaster
Emergency Communications (DEC) Division. The VSAB is a 24-hour, seven-days-a-week
operational facility funded through DEC Operations Support (OS) resources.
Reliable heating is required to support continuous operations. The existing boiler system has
reached the end of its service life and must be replaced.
2.0 Scope of Work
The Contractor shall provide all labor, materials, equipment, tools, supervision, and any other
items necessary to complete the boiler replacement in accordance with this Statement of Work
and all applicable federal, state, and local codes and regulations.
All work shall be performed to industry standards. The Contractor shall obtain and deliver all
required permits and notices prior to starting work.
The Contractor shall submit a complete material submittal package for Government approval
prior to ordering or installing any materials. Work shall commence within seven (7) calendar days
after materials arrive on site.
The Contractor shall coordinate all work with the Facility Manager to ensure minimal disruption
to FEMA operations. Advance notification is required for any building shutdowns necessary for
boiler replacement, including proposed dates and times.
The Contractor shall maintain a clean and safe work area at all times. All debris shall be removed
from FEMA property and disposed of in accordance with federal, state, and local regulations.
Upon completion, the work site shall be left clean and free of all materials, tools, and equipment.
The Contractor shall be responsible for any damage to Government or personal property caused
by Contractor personnel or equipment.
All work shall be completed within thirty (30) calendar days after issuance of the Notice to
Proceed.
The Contractor shall warranty all work, materials, and installation for one (1) year from the date
of installation and system startup.
3.0 Technical Requirements
3.1 Demolition
70FA5026Q00000011 Attachment 01
-- 1 of 4 --
2
The Contractor shall:
▪ Remove the existing boiler and all associated accessories.
▪ Remove all boiler venting located within the mechanical room as required for installation of
the new system.
▪ Protect surrounding equipment and infrastructure during demolition.
3.2 Installation
The Contractor shall:
▪ Furnish and install a new 95% high efficiency boiler, maintaining the current
system configuration, with a stainless steel ASME-rated heat exchanger.
▪ Deliver and place the new boiler in the mechanical room.
▪ Provide variable speed circulating pump and trap
▪ Reconnect the new boiler to existing mechanical piping, gas piping, electrical systems, and all
required system components.
▪ Install new boiler venting within the mechanical room as required, with stainless steel flue pipe.
▪ Provide all ancillary components necessary for a complete and operational system, including
electrical wiring, conduit, and condensate drain piping.
3.3 Startup and Commissioning
The Contractor shall:
▪ Perform system startup and commissioning in accordance with manufacturer requirements
and industry standards.
▪ Verify proper operation of all safety controls, gas connections, venting, and circulation
systems.
▪ Provide a commissioning report to the Government.
4.0 Hazardous Conditions
If the Contractor encounters conditions that prevent performance of the specified work, the
Contracting Officer shall be notified immediately.
A confined-space permit must be obtained before entering any confined space.
5.0 Government-Furnished Property and Services
The Government will provide reasonable utilities and workspace required to perform the work.
No covered or secure storage areas are available. The Contractor shall provide all equipment
and storage media necessary to perform tasks.
5.1 Toilet Facilities
Contractor personnel may use existing toilet facilities in the immediate work area and must
maintain cleanliness at all times.
70FA5026Q00000011 Attachment 01
-- 2 of 4 --
3
5.2 Telephone
Government telephones may be used only for emergencies or field-related communication. No
long-distance calls are authorized.
6.0 Hours of Operation
Normal working hours are 6:00 AM to 2:30 PM PST, Monday through Friday, excluding federal
holidays.
Requests to work outside normal hours must be submitted to the Contracting Officer at least
five (5) calendar days in advance. Approval is subject to availability of Government inspection
personnel.
7.0 Safety and Health Requirements
7.1 Openings and Excavations
All holes, pits, trenches, and similar openings shall be protected with a 48-inch-high, highly
visible orange mesh fence, securely anchored and located at least three feet from the opening.
When not in use, openings shall be covered with 3⁄4-inch plywood or metal grating.
7.2 OSHA Compliance
All work shall comply with OSHA requirements in 29 CFR 1910 and 29 CFR 1926, as well as
applicable national standards and FEMA safety instructions.
7.3 State Requirements
Contractors operating in Washington State must maintain an approved company safety policy
and Accident Prevention Plan in accordance with state Workers’ Compensation laws.
7.4 Welding, Cutting, and Brazing
Any hot-work activity requires approval from the Facility Manager at least 24 hours in advance.
7.5 Confined Space
All required permits and approvals must be obtained prior to entering a confined space.
8.0 Waste Disposal
All waste, excess, scrap, and salvage materials generated by this project become the property of
the Contractor unless otherwise specified. These mater…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238220)
HVAC Replacement and Modernization of Controls - Owings Mills, MD
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 30, 2026
127EAW26Q0053 - Kern River Ranger District HVAC
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 27, 2026
J--GATE-REPLACE HVAC SYS AT BLDG 47&58-SAHO
INTERIOR, DEPARTMENT OF THE · Combined Synopsis/Solicitation · due July 30, 2026