Full and Open Competition Construct Metal Building, F5067 Vance AFB, OK
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
FP1024054
NAICS
236220
PSC
Y1EB
Set-aside
No Set aside used
Posted
June 3, 2026
Response due
June 17, 2026
Place of performance
Enid, OK
What this opportunity is
The Department of Defense is seeking contractors for a full and open competition to construct a metal building at Vance Air Force Base, Oklahoma, under NAICS code 236220. This opportunity is not set aside for small businesses, meaning any qualified contractor can bid. The notice type is a combined synopsis/solicitation, indicating that interested parties should prepare to submit proposals rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Design Percent Completion: 100%
May 1, 2026
Statement of Work
CONSTRUCT METAL BUILDING, F5067
VANCE AIR FORCE BASE, OKLAHOMA
FACILITY PROJECT ID 1024054
PREPARED BY DYLAN MARTIN, ZEB MCCOLLUM AND JOMARA ORTIZ
-- 1 of 134 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1024054 Page 1 of 19 Construct Metal Building, F5067
SoW Version 4.0
INDEX
PART 1 GENERAL ....................................................................................................................................... 2
1.01. PROJECT DESCRIPTION ..................................................................................................................... 2
1.02. INSTRUCTIONS TO BIDDERS ............................................................................................................. 2
1.03. LOCATION OF WORK ........................................................................................................................ 2
1.04. SCOPE OF WORK .............................................................................................................................. 2
1.05. CHANGES ........................................................................................................................................ 11
1.06. WARRANTY..................................................................................................................................... 11
1.07. SCHEDULE OF WORK ...................................................................................................................... 12
1.08. WORK RESTRICTIONS ..................................................................................................................... 12
1.09. CONTRACTOR’S REPRESENTATIVE ................................................................................................. 14
1.10. PROVIDED SERVICES AND UTILITIES .............................................................................................. 15
1.11. INSPECTION .................................................................................................................................... 15
1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE) ....................................... 15
1.13. SPECIAL MATERIALS ....................................................................................................................... 15
1.14. MATERIALS ..................................................................................................................................... 16
PART 2 EXECUTION.................................................................................................................................. 17
2.01. SITE SAFETY REQUIREMENTS ......................................................................................................... 17
2.02. INSTALLATION ................................................................................................................................ 17
PART 3 SITE INFORMATION ..................................................................................................................... 18
PART 4 APPENDICES ................................................................................................................................ 19
4.01. APPENDIX A – BID FORM ............................................................................................................... 21
4.02. APPENDIX B – SPECIFICATIONS ...................................................................................................... 23
4.03. APPENDIX C – DRAWINGS .............................................................................................................. 79
4.04. APPENDIX D – SCHEDULE E ............................................................................................................ 90
4.05. APPENDIX E – BASIS OF DESIGN DETAILS ....................................................................................... 94
-- 2 of 134 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1024054 Page 2 of 19 Construct Metal Building, F5067
SoW Version 4.0
PART 1 GENERAL
1.01. PROJECT DESCRIPTION
A. The work covered under this Statement of Work shall consist of constructing a 40-foot by
60-foot, prefabricated metal building, complete-in-place (turnkey) and any incidental
work necessary to provide a complete and usable finished product.
1.02. INSTRUCTIONS TO BIDDERS
A. As part of the bid package the Contractor shall submit a completed copy of APPENDIX A –
BID FORM, along with all required documentation as stated in Sam.gov.
1.03. LOCATION OF WORK
A. Location of work to be accomplished under this statement of work is at Vance Air Force
Base (AFB). Vance AFB is located three miles south of the City of Enid, Oklahoma. Facility
5067 will be constructed Northeast of the intersection of Conway Street and Macchi
Avenue.
1.04. SCOPE OF WORK
A. The Contractor shall furnish all supervision, labor, equipment, consumable materials,
supplies, tools, and other items to complete the construction as listed in the Scope of
Work. All quotes shall include all shipping charges for completion of the project. The
contractor will coordinate all work with ASRC Federal (ASRC) Construction Management
prior to execution. The list of items below are to be considered the general Scope of
Work for the project.
B. The Contractor shall field verify location of work, dimensions, and existing site conditions
prior to commencing work. The Contractor shall contact ASRC Construction Management
for any discrepancies with the Scope of Work.
C. The Contractor shall furnish and construct a complete and usable, 40-foot wide by 60-
foot-long pre-fabricated metal building with Portland Cement (P.C.) concrete slab,
footings, doors, spray foam insulation, electrical lighting and power, electrical heating, PC
concrete building approaches, sidewalks and entrance drive. Additional details are
described below:
-- 3 of 134 --
400 Young Road
Vance AFB, OK 73705
580.213…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
Repair BEQ HP135
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 16, 2026
Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB Texas
DEPT OF DEFENSE · Special Notice
BLDG 31B New Roofing Below Grade Structure
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Solicitation · due June 26, 2026
NAF Outdoor Recreation/Equipment Rental Center, Kadena Air Base, Okinawa, Japan
DEPT OF DEFENSE · Solicitation · due July 8, 2026
Steam Tunnel Ventilation Replacement
COMMERCE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 5, 2026
Z1NB--Boiler replacement
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due June 12, 2026