Furnish and Install ABA Compliant Doors, F171-Vance AFB
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
FP1021663
NAICS
238290
PSC
5340
Set-aside
No Set aside used
Posted
June 4, 2026
Response due
July 8, 2026
Place of performance
Enid, OK
What this opportunity is
The Department of Defense is seeking contractors to furnish and install Architectural Barriers Act (ABA) compliant doors at Vance Air Force Base in Oklahoma. This opportunity falls under NAICS code 238290 and is not set aside for small businesses, meaning all business sizes can compete. The notice type is a Combined Synopsis/Solicitation, indicating that interested parties should track the opportunity closely for bidding instructions and requirements.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Design Percent Completion: 100%
February 25, 2026
Statement of Work
FURNISH AND INSTALL ARCHITECTURAL BARRIERS ACT (ABA)
COMPLIANT DOORS, F171
VANCE AIR FORCE BASE, OKLAHOMA
FACILITY PROJECT ID FP1021663
PREPARED BY ZEB MCCOLLUM
-- 1 of 19 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1021663 Page 1 of 12 Furnish & Install ABA Compliant Doors, F171
SoW Version 4.0
INDEX
PART 1 GENERAL .......................................................................................................................................... 2
1.01. PROJECT DESCRIPTION ....................................................................................................................... 2
1.02. INSTRUCTIONS TO BIDDERS ................................................................................................................ 2
1.03. LOCATION OF WORK ........................................................................................................................... 2
1.04. SCOPE OF WORK ................................................................................................................................. 2
1.05. CHANGES ............................................................................................................................................. 4
1.06. WARRANTY .......................................................................................................................................... 5
1.07. SCHEDULE OF WORK........................................................................................................................... 5
1.08. WORK RESTRICTIONS .......................................................................................................................... 5
1.09. CONTRACTOR’S REPRESENTATIVE ...................................................................................................... 7
1.10. PROVIDED SERVICES AND UTILITIES ................................................................................................... 8
1.11. INSPECTION ......................................................................................................................................... 8
1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE) ........................................... 8
1.13. SPECIAL MATERIALS ............................................................................................................................ 9
1.14. MATERIALS .......................................................................................................................................... 9
PART 2 EXECUTION .................................................................................................................................... 10
2.01. SITE SAFETY REQUIREMENTS ............................................................................................................ 10
2.02. INSTALLATION ................................................................................................................................... 10
PART 3 SITE INFORMATION ....................................................................................................................... 11
PART 4 APPENDICES ................................................................................................................................... 12
4.01. APPENDIX A – SITE PHOTOS.............................................................................................................. 12
4.02. APPENDIX B – BID FORM .................................................................................................................. 12
4.03. APPENDIX C – SPECIFICATIONS ......................................................................................................... 12
4.04. APPENDIX D – SCHEDULE E ............................................................................................................... 12
-- 2 of 19 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1021663 Page 2 of 12 Furnish & Install ABA Compliant Doors, F171
SoW Version 4.0
PART 1 GENERAL
1.01. PROJECT DESCRIPTION
A. The work covered under this Statement of Work shall consist of removing existing
vestibule and interior doors, associated hardware, and install new vestibule and interior
doors compliant with The Architectural Barriers Act (ABA), to include wheelchair
accessible peripherals, control push buttons, and any incidental work necessary to
provide a complete and usable finished product.
1.02. INSTRUCTIONS TO BIDDERS
A. As part of the bid package the Contractor shall submit a completed copy of APPENDIX B –
BID FORM, along with all required documentation as stated in Sam.gov.
B. Owner reserves the right to reject any bid which does not completely satisfy the
Statement of Work.
1.03. LOCATION OF WORK
A. Location of work to be accomplished under this statement of work is at Vance Air Force
Base (AFB). Vance AFB is located three miles south of the City of Enid, Oklahoma. Facility
171, Life Support, is located southwest of the intersection of South Brown Road and Elam
Road.
1.04. SCOPE OF WORK
A. The Contractor shall furnish all supervision, labor, equipment, consumable materials,
supplies, tools, and other items to complete the construction as listed in the Scope of
Work. All quotes shall include all shipping charges for completion of the project. The
contractor will coordinate all work with ASRC Federal (ASRC) Construction Management
prior to execution. The list of items below are to be considered the general Scope of
Work for the project.
B. The Contractor shall field verify location of work, dimensions, and existing site conditions
prior to commencing work. The Contractor shall contact ASRC Construction Management
for any discrepancies with the Scope of Work.
C. Remove and replace two sets of double-leaf doors at vestibule and entrance of Facility
171. Contractor shall follow ABA guidelines and meet or exceed National Electric Code
(NEC) require…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238290)
Preventive Maintenance Services for Anti-Climb Bi-folding Gates
STATE, DEPARTMENT OF · Solicitation · due June 25, 2026
Vertical Transportation Equipment Repair
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 29, 2026
UMSB Suite 304 Renovation
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 10, 2026
Notice of Intent - RFQ - 19ZA6026Q0003 - Chancery Elevators Repair
STATE, DEPARTMENT OF · Special Notice · due July 2, 2026
Installation of Government-Owned Air Compressor and Hotsy Steam Cleaner
DEPT OF DEFENSE · Solicitation · due June 30, 2026
J035--502-24-102 | Replace Elevators in Bldg 7 & 9 | Pineville, LA
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due July 17, 2026