FY26 OTS Modular Classroom & Restroom Facilities - Request For Information

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
FY26OTSMODFAC
NAICS
321991
PSC
5410
Posted
July 24, 2026
Response due
August 7, 2026
Place of performance
Montgomery, AL

Description

***DRAFT*** Statement of Objectives (SOO) OTS Modular Classroom & Restroom Facilities 1.0 OBJECTIVE. To establish a fully operational complex of temporary modular facilities for Officer Training School (OTS) at Maxwell AFB to support academic instruction and military training exercises. The objective end-state is a turnkey, integrated campus consisting of up to twenty-five (25) climate-controlled temporary classrooms, a dedicated Warhawk Operations Center (WOC) for specialized class scenarios, and ADA-compliant restroom facilities capable of supporting a high- density training population. 2.0 DESCRIPTION OF REQUIREMENT. To support OTS daily academic instruction and rigorous training, the modular complex shall provide a durable, safe, and professional campus. Structures shall be rigid-walled educational facilities complying with Montgomery, Alabama building codes and ADA accessibility guidelines. Soft-walled tents or facilities lacking verified wind/weather-load ratings do not meet minimum OTS operational standards. 2.1 FACILITIES & CAPACITY: 2.1.1 Modular Classroom Buildings (Qty: 25): Each temporary building shall safely and comfortably accommodate up to twenty (20) individuals (typically sixteen (16) students and up to four (4) instructors/teachers), including space for desks, chairs, and instructional presentations. 2.1.2 Modular Warhawk Operations Center Building (Qty: 1): The Warhawk Operations Center (WOC) shall consist of one (1) rectangular building functioning as an area for class exercises, with a minimum square footage of 1,200 sq. ft. 2.1.3 Modular Restroom Facilities: Temporary, climate-controlled restroom facilities shall be sufficient to support the daily occupancy of the twenty-five (25) classroom units and WOC (estimated daily population of up to 500 personnel). Restroom facilities shall meet the Americans with Disability Act Accessibility Guidelines (ADAAG). 2.2. UTILITIES & CLIMATE CONTROLS: 2.2.1 HVAC: Each classroom, WOC, and restroom unit shall be equipped with localized HVAC systems capable of maintaining stable interior temperatures during extreme summer and winter climates in Montgomery, AL. 2.2.2 Electrical: All units shall have sufficient electrical capacity and outlets to support their respective HVAC systems and interior lighting. Additionally, the following specific power capabilities shall be met: 2.2.2.1 Classrooms: The buildings shall have power capabilities sufficient to support up to 20 personnel and their laptops simultaneously, in addition to standard instructional computer/projection equipment. 2.2.2.2 Warhawk Operations Center (WOC): The building shall have the capability to host 25kWh of electricity to support the specialized equipment utilized in this area. 3.0 DELIVERY REQUIREMENTS. 3.1 TIMELINE: All work from contract award to fully operational deployment (including delivery, site placement, anchoring, utility connection, and safety certification) shall be completed within approximately nine (9) months. -- 1 of 2 -- 3.2 LOCATION: Facilities shall be sited on an existing concrete pad area at Maxwell AFB, Montgomery, AL. 4.0 INSTALLATION REQUIREMENTS: 4.1 Site & Layout Constraints: 4.1.1 All facilities shall be positioned on an existing concrete pad area with an estimated footprint of 100 yards x 100 yards (10,000 square yards). 4.1.2 Shall evaluate these existing site constraints and provide the minimum square footage, recommended layout configurations, and utility footprint requirements (electric, gas, etc.) required for safely deploying the twenty-five (25) units plus restrooms. 4.2 Utility Integration: Current electrical and plumbing utility connections are not active at the immediate concrete pad site; however, the Government anticipates routing necessary connection access to the Maxwell AFB electrical grid prior to the start of on-site installation. Final utility- integration and connection of the units to this provided grid access point shall be fully executed as part of this requirement. 5.0. STANDARD WARRANTY: The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government. 5.1 Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, CDs and DVDs and other documentation on all equipment. 5.2 Prior to project acceptance, the contractor shall provide written procedures, points of contact within company, and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance, and replacement of faulty equipment. 6.0 GENERAL INFORMATION: Items must be brand new. Refurbished items are not authorized. -- 2 of 2 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 321991)