GAOA Concrete Vault Toilet Installation
AGRICULTURE, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
1240BH26Q0033
NAICS
238120
PSC
Y1FB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 29, 2026
Response due
July 28, 2026
Place of performance
Helena, MT
Description
SPECIFICATIONS
SECTION 01 33 00 – SUBMITTAL PROCEDURES
PART 1 – GENERAL
1.01 PROCEDURES FOR SUBMITTALS
A. Reviewing, Certifying, Approving Authority: Contractor shall be responsible for
reviewing and certifying that submittals are in compliance with contract requirements.
B. Scheduling: Allow review period, beginning with receipt by approving authority that
includes at least 5 working days for submittals for contracting officer approval. Period of
review for submittals with contracting officer approval begins when Government receives
submittal from contractor. Period of review for each resubmittal is the same as for initial
submittal.
C. Variations: Variations from contract requirements require Government approval pursuant
to contract Clause entitled “FAR 52.236-21, Specifications and Drawings for
Construction” and will be considered where advantages to government.
D. Submittal Schedule:
SECTION DESCRIPTION SUBMITTED APPROVED
33 36 00-1.02A Vault Toilets (5)
END OF SECTION 01 33 00
SECTION 01 74 00 – TOILET DISPOSAL AND SITE CLEAN UP
PART 1 – GENERAL
1.01DISPOSAL
A. Pumping and Disposal of existing toilets:
a. Contractor shall pump toilets immediately prior to disposal.
b. Contractor shall remove and dispose of the existing toilet systems.
c. Waste materials generated from the disposal shall be disposed of at the
contractor’s expense in accordance with all local, state and federal regulations at
an approved offsite location.
d. While excavations are open during construction, contactor shall provide guards
and/or other protection necessary to protect public from the tripping/falling
hazard.
1.02CLEAN UP
A. The contractor shall keep the work site free from accumulation of waste materials and
rubbish resulting from the work. Clean areas daily as required to maintain a safe working
site.
-- 1 of 3 --
Concrete Vault Toilet Installations SPECIFICATIONS May 14, 2026
Page 2
B. The contractor shall minimize disturbance to the area and perform site work necessary to
restore natural surface contours impacted from work.
C. Before final acceptance of the project by the Government, the contractor shall remove
from the site all excess material, waste, and rubbish resulting from this work.
END OF SECTION 01 74 00
SECTION 33 36 00 – CONCRETE VAULT TOILET
PART 1 – GENERAL
1.01SUMMARY
A. Work includes the installation of five (5) unisex concrete vault toilets.
a. Each toilet will be installed at different sites across three different Ranger
Districts.
1.02SUBMITTALS
A. Product Data: For the vault toilets indicated, include construction details, material
descriptions, dimensions of individual components and profiles, and finishes.
PART 2 – PRODUCTS
2.01CONCRETE VAULT TOILETS
A. Specifications;
a. Type: Single Vault Toilet
b. Exterior: Barnwood Look
c. Screen:Full Screen
d. Roof: Simulated Wood Shake Roof
e. Color: Dark Brown Concrete
f. Signage: Unisex - ADA
g. Vent Screen: Required – Installed over vent
h. Floor Plans:
i. Benchmark Airstrip: Right-Handed
ii. Ron Janicula TH: Right-Handed
iii. Highwood Cabin: Right Handed
iv. Park Lake Day Use: Left-Handed
v. Park Lake CG: Left-Handed
PART 3 – EXECUTION
3.01INSTALLATION
-- 2 of 3 --
Concrete Vault Toilet Installations SPECIFICATIONS May 14, 2026
Page 3
A. General: Comply with vault toilet manufacturer’s written installation instructions
applicable to products and applications indicated unless more stringent requirements
apply.
B. Grades of access route immediately serving the vault toilet shall comply with ADA
requirements.
C. Park Lake Day Use Toilet: Asphalt paving borders the existing toilet. It is anticipated the
new toilet installation will either damage the existing asphalt surfaces or require
installation of additional concrete flatwork to provide an accessible transition from the
existing asphalt surface into the restroom. All concrete, grading, and/or other work
required to provide a finished accessible concrete surface into the new restrooms is the
contractor’s responsibility. See drawings for details.
END OF SECTION 33 36 00
SECTION 33 36 50 – EXCAVATION
PART 1 – GENERAL
1.01SUMMARY
A. Work includes excavation, backfill, and any site work required for vault toilet
installation.
1.02SUBMITTALS
A. NA
PART 2 – PRODUCTS
2.01EQUIPMENT
A. General: Contractor shall supply equipment necessary to excavate the hole necessary to
receive the new vault toilet. Equipment shall be capable of digging a 5 foot hole in the
top of a mountain.
PART 3 – EXECUTION
3.02INSTALLATION
A. Contractor is responsible to conduct a utility locate prior to excavation.
B. Excavate new hole at location staked by COR. Excavation shall comply with vault toilet
manufactures installation instructions.
END OF SECTION 33 36 50
-- 3 of 3 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗