HHC, 12th Aviation Battalion Temporary Trailer Space

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
PANMCC26P0000045621
NAICS
532120
PSC
W023
Set-aside
8(a) Sole Source
Posted
June 16, 2026
Response due
June 26, 2026
Place of performance
Fort Belvoir, VA

What this opportunity is

The Department of Defense is seeking temporary trailer space to support the relocation of the Headquarters and Headquarters Company (HHC) and S4 of the 12th Aviation Battalion at Davison Army Airfield, Virginia. This opportunity is set aside for 8(a) small businesses, encouraging participation from various socioeconomic categories. As this is a Sources Sought Notice, interested vendors should focus on providing capability statements and Rough Order of Magnitudes rather than submitting formal bids at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

PERFORMANCE WORK STATEMENT (PWS) HHC, 12th Aviation Battalion Temporary Trailer Space PART 1 GENERAL INFORMATION 1. General: This is a non-personal services contract to provide temporary trailer space. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the government. 1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform temporary trailer space as defined in this performance work statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract. 1.2 Background: The Government has a requirement for contractor-provided construction installation support to deliver and install modular facilities at a Government-designated project site. These services support operational and infrastructure needs and must be performed in accordance with applicable construction standards, safety regulations, and contractual requirements. Headquarters and Headquarters Company (HHC) and S4 of 12th Aviation Battalion (12th AB) were relocated to support Bravo Company, 12th Aviation Battalion’s hangar renovation. A temporary trailer space is needed to relocate HHC and S4 back to the 12th AB area of operations (AO) on Davison Army Airfield (DAAF). This temporary space will house HHC and S4 until Bravo Company can fully relocate back to their renovated hangar following construction completion and the official facilities handover anticipated to occur before December 2026. 1.3 Objectives: The objective of this contract is to obtain timely, compliant, and professionally executed modular building delivery and installation services that meet defined performance standards while adhering strictly to the scope and terms of the vendor quotation. This includes but is not limited to: delivery, installation, removal, clean-up, electrical, communications, water, and sewage requirements, stairs, and furnishing (desks and chairs) for 16 personnel. 1.4 Scope: The contractor shall provide all personnel, supervision, labor, materials, tools, equipment, transportation, and expertise necessary to deliver, install, assemble, and place modular facilities as described in the vendor quotation. Services include site delivery, positioning, assembly, and related installation activities necessary to render the modular facilities ready for Government use. All services shall be performed as non-personal construction installation support in accordance with applicable federal, state, local, and installation-specific regulations, and coordinated through the Contracting Officer’s Representative (COR). 1.4.1 Tasks: Delivery: The contractor shall deliver modular building units to the Government-designated project site in accordance with the schedule and requirements identified in the vendor quotation. Performance Outcome: Modular units are delivered on time, undamaged, and in compliance with contract requirements. Installation and Setup: The contractor shall install, assemble, and position modular building units as specified in the vendor quotation, including all actions necessary to place the facilities in their intended configuration and condition for Government acceptance. Performance Outcome: Modular facilities are installed correctly, safely, and in accordance with contractual specifications and applicable construction standards. Period of Performance: The period of performance shall be for one (1) base year of 12 months. The period of performance reads as follows: Base Year 1.6 General Information 1.6.1 Quality Control Quality control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the government (see FAR 52.246-1, Contractor Inspection Requirements). The contractor shall develop, implement and maintain an effective quality control system that includes a written quality control plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the government. The QCP, as a minimum, shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; and procedures for collecting and addressing customer feedback/complaints. The contractor shall upon request provide to the government its quality control documentation. The QCP shall be furnished within 30 days after contract award and within five (5) working days when charges are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to its QC system. 1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is a government only document primarily focused on what the government must do to assure that the contractor has performed in accordance with the requirements of the contract. 1.6.3 Federal Government Holidays: Contractor is not required to perform services on holidays.

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 532120)