Horizontal Construction Multiple Award Contract (MAC)

DEPT OF DEFENSE

Notice type
Presolicitation
Solicitation #
FA4626-26-R-0008
NAICS
237990
PSC
Z2NZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 12, 2026
Response due
Place of performance
Malmstrom AFB, MT

What this opportunity is

The Department of Defense is seeking contractors for a Horizontal Construction Multiple Award Contract (MAC) focused on the repair of the North South Base water system at Malmstrom Air Force Base in Montana. This opportunity is set aside for total small businesses under NAICS code 237990. As a presolicitation notice, interested small businesses should monitor the announcement closely for further details and bidding instructions.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

SPECIFICATIONS for REPAIR NORTH SOUTH BASE WATER PHASE II PROJECT NUMBER 1080765 MALMSTROM AIR FORCE BASE Prepared for: 341st Civil Engineering Squadron 39, 78th Street North Malmstrom AFB, MT 59402 Submitted to: 341 CONS/PKA Malmstrom AFB, MT 59402 Prepared by: Ironworks Square Building 1321 8 th Ave N. #204 Great Falls, MT 59401 (406) 761-2290 DRAFT -- 1 of 193 -- Table of Contents SECTION 01 00 00 – GENERAL REQUIREMENTS .......................................................... 1 to 14 SECTION 01 00 10 – SECURITY .......................................................................................... 1 to 2 SECTION 01 36 00 – ENVIRONMENTAL PROTECTION ............................................... 1 to 14 SECTION 01 36 00 – ATTACHMENT 1 SUMMARY SOLID WASTE DISPOSAL ................ 15 SECTION 01 36 00 – ATTACHMENT 2 EESOH-MIS HAZARDOUS MATERIALS LIST .... 16 SECTION 01 36 00 – ATTACHMENT 3 QCREPORT TO INSPECTOR ............................. 17-18 SECTION 01570 – CONSTRUCTION TRAFFIC CONTROL ............................................. 1 to 5 SECTION 01580 – TEMPORARY WATER SUPPLY ........................................................... 1 to 3 SECTION 02112 – REMOVAL OF EXISTING PAVEMENT, CURB, SIDEWALK, ETC ........ 1 SECTION 02114 – RELOCATING OR REMOVING CONFLICTING ITEMS .................. 1 to 2 SECTION 02221 – TRENCH EXCAVATION AND BACKFILL FOR PIPELINES .......... 1 to 15 SECTION 02225 – FLOWABLE FILL .................................................................................. 1 to 4 SECTION 02230 – STREET EXCAVATION BACKFILL AND COMPACTION .............. 1 to 7 SECTION 02235 – CRUSHED GRAVEL BASE COURSE .................................................. 1 to 5 SECTION 02502 – ASPHALT PRIME/TACK COAT............................................................ 1 to 6 SECTION 02510 – ASPHALT CONCRETE PAVEMENT .................................................. 1 to 20 SECTION 02515 – PORTLAND CEMENT CONCRETE PAVEMENT ............................. 1 to 20 SECTION 02528 – CONCRETE CURB AND GUTTER ...................................................... 1 to 6 SECTION 02529 – CONCRETE SIDEWALKS AND MISC. CONC. CONSTRUCTION .. 1 to 5 SECTION 02660 – WATER DISTRIBUTION .................................................................... 1 to 19 SECTION 02925 – SODDING................................................................................................ 1 to 3 SECTION 02926 – SEEDING ................................................................................................ 1 to 5 SECTION 03210 – REINFORCING STEEL .......................................................................... 1 to 3 SECTION 03310 – STRUCTURAL CONCRETE ............................................................... 1 to 16 Portions of the Technical Specifications are written in the imperative mode. Except where specifically intended otherwise, the subject of all imperative statements is the Contractor. For example, “Furnish….” means “Contractor shall furnish…”, “Provide ….” means “Contractor shall provide…”. DRAFT -- 2 of 193 -- The Specifications and Drawings are intended to provide the basis for proper completion of the work suitable for the intended use of the Government and establish the minimum standards for quality of workmanship and appearance. Anything not expressly set forth but which is reasonably implied or necessary for proper performance of the project shall be included. DRAFT -- 3 of 193 -- ATTACHMENT 01 Repair North South Base Water Systems PROJECT NO. 1080765 GENERAL REQUIREMENTS 01 00 00 - 1 SECTION 01 00 00 - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY OF WORK A. Project titled: “Repair North South Base Water Systems, Project 1080765”. This project consists of the replacement of various water mains within MAFB including valves, fittings, fire hydrants, meters, and various appurtenances. In addition, the project will include removal and restoration/replacement of the associated surface concrete driveways, sod, curb and gutter and asphalt surfacing. These improvements are located on Malmstrom Air Force Base, Montana. 1.2 UTILITIES A. All reasonable quantities of utilities will be made available from existing utilities to the Contractor without charge. Any temporary connection or lines that may be required will be installed, maintained, and removed by the Contractor at his own expense and in such a manner satisfactory to the Contracting Officer. Removal of such connections or lines will be accomplished prior to final acceptance of the construction. The Contractor shall provide any necessary portable power. 1.3 SAFETY A. The Contractor shall comply with all existing Occupational Safety and Health Act (OSHA) standards of safety at all times in the performance of this contract. Hazards to the safe use of the premises due to the Contractor’s work and/or equipment shall be suitably marked at all times. Pedestrian and vehicle traffic ways shall be kept clear and unobstructed. PART 2 - PRODUCTS Not applicable. PART 3 - EXECUTION 3.1 INSPECTION A. There will be one primary Contracting Officer’s Representative assigned to inspect for compliance. An alternate Contracting Officer’s Representative will also be assigned and will perform all inspection duties in the absence of the primary Contracting Officer’s Representative. The Contracting Officer’s Representative will be the spokesman for compliance with the specifications and drawings. Controversies between the Contracting Officer’s Representative and the Contractor will be resolved by the Contracting Officer. If, for some reason, a change in the primary or alternate Contracting Officer’s Representative is required, the Contractor will be notified. The Contractor shall coordinate Contractor activities with the Contracting Officer’s Representative. DRAFT -- 4 of 193 -- ATTACHMENT 01 Repair North South Base Water Systems PROJECT NO. 1080765 GENERAL REQUIREMENTS 01 00 00 - 2 3.2 CONTRACTOR VEHICLES AND EQUIPM

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237990)