What this opportunity is
The Department of Defense is seeking contractors for a Horizontal Construction Multiple Award Contract (MAC) focused on the repair of the North South Base water system at Malmstrom Air Force Base in Montana. This opportunity is set aside for total small businesses under NAICS code 237990. As a presolicitation notice, interested small businesses should monitor the announcement closely for further details and bidding instructions.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SPECIFICATIONS
for
REPAIR NORTH SOUTH BASE WATER PHASE II
PROJECT NUMBER 1080765
MALMSTROM AIR FORCE BASE
Prepared for:
341st Civil Engineering Squadron
39, 78th Street North
Malmstrom AFB, MT 59402
Submitted to:
341 CONS/PKA
Malmstrom AFB, MT 59402
Prepared by:
Ironworks Square Building
1321 8 th Ave N. #204
Great Falls, MT 59401
(406) 761-2290
DRAFT
-- 1 of 193 --
Table of Contents
SECTION 01 00 00 – GENERAL REQUIREMENTS .......................................................... 1 to 14
SECTION 01 00 10 – SECURITY .......................................................................................... 1 to 2
SECTION 01 36 00 – ENVIRONMENTAL PROTECTION ............................................... 1 to 14
SECTION 01 36 00 – ATTACHMENT 1 SUMMARY SOLID WASTE DISPOSAL ................ 15
SECTION 01 36 00 – ATTACHMENT 2 EESOH-MIS HAZARDOUS MATERIALS LIST .... 16
SECTION 01 36 00 – ATTACHMENT 3 QCREPORT TO INSPECTOR ............................. 17-18
SECTION 01570 – CONSTRUCTION TRAFFIC CONTROL ............................................. 1 to 5
SECTION 01580 – TEMPORARY WATER SUPPLY ........................................................... 1 to 3
SECTION 02112 – REMOVAL OF EXISTING PAVEMENT, CURB, SIDEWALK, ETC ........ 1
SECTION 02114 – RELOCATING OR REMOVING CONFLICTING ITEMS .................. 1 to 2
SECTION 02221 – TRENCH EXCAVATION AND BACKFILL FOR PIPELINES .......... 1 to 15
SECTION 02225 – FLOWABLE FILL .................................................................................. 1 to 4
SECTION 02230 – STREET EXCAVATION BACKFILL AND COMPACTION .............. 1 to 7
SECTION 02235 – CRUSHED GRAVEL BASE COURSE .................................................. 1 to 5
SECTION 02502 – ASPHALT PRIME/TACK COAT............................................................ 1 to 6
SECTION 02510 – ASPHALT CONCRETE PAVEMENT .................................................. 1 to 20
SECTION 02515 – PORTLAND CEMENT CONCRETE PAVEMENT ............................. 1 to 20
SECTION 02528 – CONCRETE CURB AND GUTTER ...................................................... 1 to 6
SECTION 02529 – CONCRETE SIDEWALKS AND MISC. CONC. CONSTRUCTION .. 1 to 5
SECTION 02660 – WATER DISTRIBUTION .................................................................... 1 to 19
SECTION 02925 – SODDING................................................................................................ 1 to 3
SECTION 02926 – SEEDING ................................................................................................ 1 to 5
SECTION 03210 – REINFORCING STEEL .......................................................................... 1 to 3
SECTION 03310 – STRUCTURAL CONCRETE ............................................................... 1 to 16
Portions of the Technical Specifications are written in the imperative mode. Except where specifically
intended otherwise, the subject of all imperative statements is the Contractor. For example, “Furnish….”
means “Contractor shall furnish…”, “Provide ….” means “Contractor shall provide…”.
DRAFT
-- 2 of 193 --
The Specifications and Drawings are intended to provide the basis for proper completion of the work
suitable for the intended use of the Government and establish the minimum standards for quality of
workmanship and appearance. Anything not expressly set forth but which is reasonably implied or
necessary for proper performance of the project shall be included.
DRAFT
-- 3 of 193 --
ATTACHMENT 01
Repair North South Base Water Systems
PROJECT NO. 1080765
GENERAL REQUIREMENTS 01 00 00 - 1
SECTION 01 00 00 - GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 SUMMARY OF WORK
A. Project titled: “Repair North South Base Water Systems, Project 1080765”. This
project consists of the replacement of various water mains within MAFB including
valves, fittings, fire hydrants, meters, and various appurtenances. In addition, the
project will include removal and restoration/replacement of the associated surface
concrete driveways, sod, curb and gutter and asphalt surfacing. These improvements
are located on Malmstrom Air Force Base, Montana.
1.2 UTILITIES
A. All reasonable quantities of utilities will be made available from existing utilities to the
Contractor without charge. Any temporary connection or lines that may be required
will be installed, maintained, and removed by the Contractor at his own expense and
in such a manner satisfactory to the Contracting Officer. Removal of such connections
or lines will be accomplished prior to final acceptance of the construction. The
Contractor shall provide any necessary portable power.
1.3 SAFETY
A. The Contractor shall comply with all existing Occupational Safety and Health Act
(OSHA) standards of safety at all times in the performance of this contract. Hazards
to the safe use of the premises due to the Contractor’s work and/or equipment shall
be suitably marked at all times. Pedestrian and vehicle traffic ways shall be kept clear
and unobstructed.
PART 2 - PRODUCTS
Not applicable.
PART 3 - EXECUTION
3.1 INSPECTION
A. There will be one primary Contracting Officer’s Representative assigned to inspect for
compliance. An alternate Contracting Officer’s Representative will also be assigned
and will perform all inspection duties in the absence of the primary Contracting
Officer’s Representative. The Contracting Officer’s Representative will be the
spokesman for compliance with the specifications and drawings. Controversies
between the Contracting Officer’s Representative and the Contractor will be resolved
by the Contracting Officer. If, for some reason, a change in the primary or alternate
Contracting Officer’s Representative is required, the Contractor will be notified. The
Contractor shall coordinate Contractor activities with the Contracting Officer’s
Representative.
DRAFT
-- 4 of 193 --
ATTACHMENT 01
Repair North South Base Water Systems
PROJECT NO. 1080765
GENERAL REQUIREMENTS 01 00 00 - 2
3.2 CONTRACTOR VEHICLES AND EQUIPM…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237990)
Fort Eustis Dredge Material Management Area (FEDMMA) construction project
DEPT OF DEFENSE · Solicitation · due July 23, 2026
RENO BOTTOMS HREP - STAGE 2 - ICE HAUL SLOUGH
DEPT OF DEFENSE · Solicitation · due July 21, 2026
Horizontal Construction Multiple Award Contract (MAC)
DEPT OF DEFENSE · Solicitation · due July 30, 2026
Water Resources Branch Quarterly Industry Day for Coastal and Navigation Projects
DEPT OF DEFENSE · Special Notice · due July 17, 2026
PALM BEACH HARBOR, SOUTH JETTY REHABILITATION 2026, PALM BEACH COUNTY, FLORIDA
DEPT OF DEFENSE · Sources Sought · due July 17, 2026
West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, WSLP-103A Levee, Floodwall and Gate, Sta. 819+87 B/L to Sta. 827+95 B/L, St. John the Baptist Parish, Louisiana ED 24-025
DEPT OF DEFENSE · Solicitation · due June 16, 2026