NASA is seeking contractors to conduct hypobaric chamber pilot studies aimed at supporting decompression sickness testing. This opportunity is open to all businesses, as there is no set-aside. The work involves managing the testing process, recruiting subjects, and ensuring compliance with specific health criteria. Interested parties should note that this is a combined synopsis/solicitation, indicating that they should track the notice for potential bidding opportunities rather than submitting proposals immediately.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Attachment A – SOW 7/15/2026 80JSC026Q0006
- 1 -
Statement of Work (SOW) for Hypobaric Chamber Pilot Studies
The objective of this pilot hypobaric chamber testing is to support NASA decompression sickness (DCS)
testing. Facilities are to perform 3 test days, collecting and recording data each day as they would for a
research protocol. The first day of testing may be considered a practice session with the recognition
that some facility and/or hardware integration issues may arise. The second day of testing should be
scheduled after issues from the previous run have been resolved, and testing should be completed
without interruption, unless otherwise indicated. The third day of testing should occur in the same work
week as the second test day to demonstrate the facility’s capability to perform multiple runs within one
week, a capability that is needed to meet NASA testing throughput and schedule to support Artemis.
NASA’s own facilities will support this work in part but are shared with other operationally relevant
tasks/programs, limiting NASA facilities’ overall availability and impacting scheduling and completion of
critical work. Identification and validation of non-NASA resources to support these DCS research
objectives are important steps to facilitating safe and successful prebreathe procedures and
extravehicular activity (EVA) in weightlessness and during exploration missions.
Under this Firm Fixed Price (FFP) contract, the contractor shall provide all necessary management,
personnel, training, materials, equipment, and facilities to complete all required tasks and deliverables.
Subjects
Facilities will recruit and screen applicants to provide minimum of 2 subjects for each of the 3 test days
to fulfill the requirements described above.
Each test day is anticipated to last approximately 13 hours. Each of the 3 single-day runs will have
unique subjects. Screening back-up subjects in case of subject availability issues, withdrawal, or
disqualification is highly recommended.
Facilities should screen subjects per their standard protocols, and the subject pool should include
females to demonstrate their capabilities to recruit and test this important population. NASA will
provide inclusion and exclusion criteria for a population demographic similar to the astronaut corps. As
part of the screening process, subjects must pass a medical examination similar to a private-pilot flight
physical and complete a peak (maximal) oxygen consumption (VO 2pk) test using a cycle ergometer
protocol with metabolic gas analysis. NASA will provide the VO 2pk cycle ergometry test protocol. To
qualify for participation, subjects must achieve VO 2pk >27.5 ml/kg/min.
Following the screening, subjects will participate in a familiarization session during which they will
receive verbal and written description of the test protocol, be encouraged to ask questions, and will
provide written informed consent before proceeding to participation. Thereafter, subjects will be
familiarized with the chamber protocol and safety procedures, the appropriate mask size will be
determined, and the subjects will practice mask breathing. Subjects also will be familiarized with the
EVA simulation workstations, and metabolic rate will be measured while performing all 8 activity/rest
stations (submaximal exercise intensity) to verify the cadence or work rates required for the in-chamber
exercise prescription.
-- 1 of 7 --
Attachment A – SOW 7/15/2026 80JSC026Q0006
- 2 -
Standardized Test Day
Facilities will implement a test plan that includes a 6.5-hour prebreathe followed by a simulation of EVA
lasting 6 hours, or until signs and symptoms that require test termination (per NASA and facility
standards), test termination by subject request, or facility or monitoring capabilities malfunctions.
These sessions will include successful mask operations and demonstration of safety procedures. An
additional 30 minutes should be allotted for repressurization and post-test monitoring.
Medical Monitoring
The facility will provide the appropriate medical support to perform pre-chamber physical examination
before ingress, during the protocol, for treatment and management of subjects as needed, clearance of
subjects after the protocol is completed, and follow-up in the days after the chamber run, as required.
Responsibilities of the medical personnel include monitoring and grading of 2-D ultrasound venous gas
emboli as well as monitoring of the subject’s self-report and symptoms of DCS or intolerance.
Prebreathe Conditions
Facilities will demonstrate the capabilities to perform 100% O 2 prebreathe durations up to 6.5 hours.
Subjects will begin mask breathing at the start of the prebreathe and remain on mask through
decompression and until repressurization is completed. Subjects should be provided fluids ad libitum
without a break in prebreathe (using drink port). NASA will provide breathing masks or provide approval
for a suitable substitution. Food will be allowed prior to start of mask prebreathe but not during the
test protocol (for 13 hours). Subjects also are not allowed to sleep during the test protocol.
EVA Simulation
Facilities will demonstrate their capacity to perform a simulated 6-hour EVA and maintain standardized
monitoring practices. To simulate the suit environment, the chamber will depress to 5.2 psia before
initiating the EVA simulation tasks described below. The start time of the EVA is defined by the start of
depressurization , and the end time of the EVA is defined by the start of repressurization. Target
press/depress rates will be at an average 3000ft/min, not to exceed 5000ft/min
EVA simulation will include rotation of each subject through a repetitive series of tasks at predetermined
intervals in a pre-determined order using NASA-defined or NASA-provided workstations (Figure 1). The
EVA is simulated using eight stations, nominally performed in 2 cycles of 4 stations, with subjects
rotating between stations every 5 minut…