What this opportunity is
The Department of Defense is seeking OEM authorized services for the inspection and operational testing of MacGregor USA anchor windlasses, specifically for the port and starboard units. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested contractors must provide all necessary labor, testing equipment, and materials, and ensure compliance with General Technical Requirements. The notice type is a solicitation, indicating that potential bidders should prepare to submit proposals rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1.0 ABSTRACT
1.1 This Contractor shall provide OEM authorized services to
inspect and operationally test the port and starboard anchor
windlasses, including inspection and certification of brake band
integrity to verify suitability for continued operation until
the next scheduled yard period.
2.0 REFERENCES
2.1 Tech Manual TG813-BV-MMC-010, Electrically Driven Deck
Machinery Models
2.2 NAVSEA Dwg. 581-7489016, Anchor Handling Arrangement and
Details
2.3 NAVSEA Dwg. 582-7488906, Mooring Arrangement and
Details
2.4 COMSCINST 4490.1B, Ship Critical Safety Items
ENCLOSURES
2.5 Work Completion Report (WCR) – Anchor Windlass Repairs
3.0 ITEM LOCATION / DESCRIPTION
3.1 Locations
3.1.1 Forward Mooring Deck – 01 Level, Frame 10
3.2 Equipment
3.2.1 Anchor Windlasses W1 (STBD) and W2 (PORT)
3.2.2 Associated braking systems, clutches, control panels,
sensors, piping, and structural supports
4.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIAL / SERVICES
4.1 None.
5.0 CONTRACTOR FURNISHED MATERIAL
5.1 Contractor shall furnish all labor, OEM services,
testing equipment, lubricants, and incidental materials required
to complete this work.
5.2 The contractor and all subcontractors, regardless of
tier, must consult the General Technical Requirements (GTR) to
determine applicability to this work item. In performance of
this work item, the contractor and all subcontractors regardless
-- 1 of 5 --
of tier must comply with the requirements of all applicable
GTRs.
5.3 The contractor and all subcontractors regardless of tier
are advised to review the other work items under this contract
to determine their effect on the work required under this work
item.
6.0 QUALITY ASSURANCE REQUIREMENTS
6.1 All work shall be performed by OEM authorized MacGregor
technicians.
6.2 Brake bands shall be inspected using OEM measurement
criteria and operational testing procedures.
6.3 OEM shall measure and document brake lining wear, brake
clearances, holding capability, and operational performance.
6.4 OEM shall provide written certification within the final
service report stating brake bands are satisfactory for
continued service until the next scheduled yard period.
6.5 Operational testing shall be witnessed by Ship’s Force
and MSC representative.
7.0 STATEMENT OF WORK REQUIRED
7.1 W1 (STBD Windlass)
7.1.1 Inspect anchor windlass brake bands.
7.1.2 Measure and document brake lining thickness,
wear, and holding capability.
7.1.3 Verify brake clearances and air gaps are
within OEM tolerances.
7.1.4 Verify satisfactory operation of emergency
planetary gear pin.
7.1.5 Verify satisfactory operation of anchor clutch
and creep speed functions.
7.1.6 Inspect gear case, gypsy wheel, brake
components, and associated hardware for wear or deficiencies.
-- 2 of 5 --
7.1.7 Verify proper operation of all windlass
functions.
7.2 W2 (Port Windlass)
7.2.1 Inspect anchor windlass brake bands.
7.2.2 Measure and document brake lining thickness,
wear, and holding capability.
7.2.3 Verify brake clearances and air gaps are
within OEM tolerances.
7.2.4 Verify satisfactory operation of emergency
planetary gear pin.
7.2.5 Inspect pinion gear bush, gear case cover,
bush bearing cover, and associated hardware for wear or
deficiencies.
7.2.6 Verify satisfactory operation of all windlass
functions.
7.3 General Windlass Inspection
7.3.1 Measure and verify E-motor brake air gaps are
within OEM tolerance.
7.3.2 Inspect electrical components, junction boxes,
and controls for proper operation.
7.3.3 Lubricate fittings and moving components as
required for operational testing.
7.3.4 Inspect windlass foundations, mounting
hardware, and associated structural components.
7.3.5 Verify proper operation of emergency release
and brake systems.
7.4 Operational Testing
7.4.1 Conduct operational testing of both anchor
windlasses while vessel is in port.
7.4.2 Verify satisfactory operation in all available
operating modes permissible while pier side.
-- 3 of 5 --
7.4.3 Verify brake holding capability and emergency
release functionality to the maximum extent possible while in
port.
7.4.4 Document any operational limitations
associated with in-port testing within final service report.
7.4.5 Demonstrate satisfactory operation to Ship’s
Force and MSC representative.
7.5 Documentation and Out Brief
7.5.1 Provide final OEM service report documenting
all inspections, measurements, and operational test results.
7.5.2 Include all brake measurements, wear readings,
and certification statements within final report.
7.5.3 Provide written statement indicating windlass
brake bands operating status and ability to operate until next
yard period.
7.5.4 Conduct a detailed out brief with the vessel
Master and Chief Engineer upon completion of all inspections and
testing.
7.5.5 Document any additional deficiencies
identified during execution of this work.
7.6 Condition Found
7.6.1 Any deficiencies outside the scope of this
work item shall be documented and submitted via Condition Found
Report (CFR).
8.0 GENERAL REQUIREMENTS
8.1 Contractor shall provide all labor, OEM services, tools,
staging, and equipment required to accomplish this work.
8.2 Contractor shall comply with all shipboard safety and
environmental requirements.
8.3 Contractor shall coordinate all work with Ship’s Force
and MSC representatives.
-- 4 of 5 --
8.4 Contractor shall ensure both anchor windlasses are
verified operational prior to final acceptance.
-- 5 of 5 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.