What this opportunity is
The International Boundary and Water Commission (USIBWC) intends to sole source services for compliance with North America Reliability Corporation (NERC) and Electric Reliability Council of Texas (ERCOT) standards at the Amistad Hydroelectric Power Plant in Texas. This opportunity is suited for small businesses with expertise in electrical compliance and management, particularly those familiar with NERC and ERCOT regulations. As a special notice, interested vendors should track this opportunity closely, as it may not involve a competitive bidding process.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK
NORTH AMERICA RELIABILITY CORPORATION (NERC) COMPLIANCES
FOR
AMISTAD HYDROELECTRIC POWER PLANT
12/5/2025
I. Introduction
The U.S. Section of the International Boundary and Water Commission (USIBWC) is a Federal
Government Agency and the U.S. component of the International Boundary and Water Commission
(IBWC), which applies the boundary and water treaties of the United States and Mexico. Our mission is
to provide binational solutions to issues that arise during the application of United States-Mexico
treaties regarding boundary demarcation, national ownership of waters, sanitation, water quality, and
flood control in the border region.
II. Description of Service
This Contractor shall provide a service to comply with current electrical compliances and requirements
enforced by North America Reliability Corporation (NERC), Electric Reliability Council of Texas (ERCOT)
and Texas Reliability Entity (Texas RE). Contractor shall provide all labor, material, equipment,
supervision, and management to comply with this Statement of Work (SOW). The Contractor shall
review currents electrical one line diagram and electrical protection system for Amistad Hydroelectric
Power Plant. The Contractor shall review current electrical compliances required by all agencies
mentioned above and monitored by Texas RE.
Moreover, The Contractor shall help with a new mitigation plan milestone (If necessary), review current
compliance status, and provide feedback to USIBWC Compliance Committee.
In addition, the Contractor shall develop a plan to comply with all standards required by North America
Electric Reliability Corporation (NERC), and Electric Reliability Council of Texas (ERCOT) and support
IBWC with proper communication (Meetings, documents, etc) with Texas RE. NERC & ERCOT new
compliances & standards may require modifications of this SOW to address in the future.
III. Background
The United States Section of the International Boundary and Water Commission (USIBWC), Amistad
Hydroelectric Power Plants are located at 670 Texas Spur 349, Del Rio, TX 78840, and to access this
Hydroelectric Power Plant, vendors need to cross through the United States Port of Entry and must
comply with proper documentation (passports or other) as required by U.S. Customs and Border
Protection officials.
The International Boundary and Water Commission (IBWC), U.S. Section is a federal agency that
operates two Hydroelectric Power Plants. As a Hydroelectric Power Plant generator owner, USIBWC is
required to meet federal and state mandated requirements, including the North American Electric
Reliability Council (NERC), Texas Reliability Entity (Texas RE), and the Electric Reliability Council of Texas
(ERCOT) Standards and Requirements. USIBWC is registered with NERC as a Generator Owner (GO),
and a Generator Operator (GOP). USIBWC does not own/operate any transmission or distribution lines.
-- 1 of 7 --
STATEMENT OF WORK
NORTH AMERICA RELIABILITY CORPORATION (NERC) COMPLIANCES
FOR
AMISTAD HYDROELECTRIC POWER PLANT
12/5/2025
IV. Scope
The intent or purpose of this SOW is to ensure USIBWC compliance with Mandatory Standards in
accordance with North America Electric Reliability Corporation (NERC), Texas Reliability Entity (Texas
RE), and Electric Reliability Council of Texas (ERCOT). This will include coordinating with Amistad
Hydroelectric Power Plants personnel for Compliance Monitoring and Enforcement Program (CMEP) or
Rules of Procedure (RoP).
The following actions will be performed by the Contractor:
Immediate Action required, but not limited to the following:
a) Review in conjunction with USIBWC Compliance Committee current Amistad Power Plant
Compliance Status with mandatory compliance enforced by Texas RE
b) Provide a feedback and suggestions to USIBWC Compliance Committee about Compliance
Status
c) Develop a new Compliance Plan Milestone with target date to be completed.
d) Provide feedback and comments to USIBWC Compliance Committee and finalize the
Compliance Plan.
e) The Amistad Power Plan Compliance Plan shall include the following NERC standards:
i. FAC-008-3 (Facility Rating for Generator Owner): The Contractor shall review all the
requirements and measures that apply to Amistad Hydroelectrical Power Plant and
determine status. Also develop final feedback with updated compliance plan in
appropriate NERC forms to be reviewed and approved by USIBWC Compliance
Committee.
ii. PRC-005-1b R1 (Transmission and Generation Protection System Maintenance and
Testing): The Contractor shall review all the requirements and measures that apply to
Amistad Hydroelectrical Power Plant and determine status. Also develop final feedback
with updated compliance plan in appropriate NERC forms to be reviewed and approved
by USIBWC Compliance Committee.
iii. Cybersecurity CIP-002-5 is the NERC standard for the Bulk Electric System (BES) Cyber
System Categorization, which requires entities to identify, categorize, and apply
cybersecurity controls to BES cyber systems based on their potential impact on the
reliability of the grid. This standard involves using criteria to classify systems as high,
medium, or low impact, and then applying corresponding security requirements to
mitigate cyber threats to the electric system. The Contractor shall review all the
requirements and measures that apply to Amistad Hydroelectrical Power Plant and
-- 2 of 7 --
STATEMENT OF WORK
NORTH AMERICA RELIABILITY CORPORATION (NERC) COMPLIANCES
FOR
AMISTAD HYDROELECTRIC POWER PLANT
12/5/2025
determine status. Also develop final feedback with updated compliance plan in
appropriate NERC forms to be reviewed and approved by USIBWC Compliance
Committee.
iv. Protection and Controls (PRC): These standards cover requirements for protective
relays and control systems at generating facilities. The Contractor shall review all the
requirements and measures that apply to Amistad Hydroelectrical Power Plant and
determine status. Also develop final feedback with updated…
Source: SAM.gov, as posted. Verify the current solicitation before responding.