What this opportunity is

The Department of Agriculture is buying construction services to remove and replace a boardwalk system in the Ocala National Forest, including specialty structures. This total small business set-aside suits companies with a North American Industry Classification Standard Code of 237990. As a combined synopsis/solicitation, businesses should track the opportunity closely, as quotations are being requested and no separate solicitation will be issued.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Construction Documents - 09/20/2024 Ocala Springs Boardwalks - Juniper Project Directory 00 0103-1 SECTION 00 0103 PROJECT DIRECTORY PART 1 GENERAL 1.01 SECTION INCLUDES A. Identification of project team members and their contact information. 1.02 OWNER: A. Name: USDA Forest Service B. Primary Contact: All correspondence from the Contractor to the Owner will be through this party, unless alternate arrangements are mutually agreed upon at preconstruction meeting. 1. Title: Project Manager. 2. Name: Kristen Koehnemann, PLA. 3. Email: kkoehnemann@tsw-design.com. 1.03 CONSULTANTS: A. Landscape Architect: Design Professional of Record. All correspondence from the Contractor regarding construction documents authored by Landscape Architect's consultants will be through this party, unless alternate arrangements are mutually agreed upon at preconstruction meeting. 1. Company Name: TSW. a. Address Line 1: 1447 Peachtree St NE. b. City: Atlanta. c. State: GA. d. Zip Code: 30309. e. Telephone: (404) 873-6730. 2. Primary Contact: a. Title: Project Manager. b. Name: Kristen Koehnemann. c. Email: kkoehnemann@tsw-design.com. B. Structural Engineering Consultant: 1. Company Name: Volkert. a. Telephone: (407) 965-4211 . 2. Primary Contact: a. Title: PE. b. Name: Kyle Vargha. c. Email: kyle.vargha@volkert.com. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION - NOT USED END OF SECTION 00 0103 -- 1 of 28 -- Construction Documents - 09/20/2024 Ocala Springs Boardwalks - Juniper Table of Contents 00 0110-1 SECTION 00 0110 TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS 1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0103 - Project Directory B. 00 0110 - Table of Contents C. 00 0154 - Prebid Conference SPECIFICATIONS 2.01 DIVISION 01 -- GENERAL REQUIREMENTS A. 01 1000 - Summary B. 01 3000 - Administrative Requirements C. 01 4000 - Quality Requirements D. 01 5713 - Temporary Erosion and Sediment Control E. 01 7123 - Field Engineering 2.02 DIVISION 02 -- EXISTING CONDITIONS A. 02 4100 - Demolition 2.03 DIVISION 03 -- CONCRETE A. 03 3000 - Cast-in-Place Concrete 2.04 DIVISION 05 -- METALS A. 05 5000 - Metal Fabrications 2.05 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES A. 06 1500 - Wood Decking B. 06 2000 - Finish Carpentry 2.06 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION A. 07 1900 - Water Repellents 2.07 DIVISION 10 -- SPECIALTIES A. 10 7100 - Pin Foundations 2.08 DIVISION 31 -- EARTHWORK A. 31 1000 - Site Clearing B. 31 2323 - Fill 2.09 DIVISION 32 -- EXTERIOR IMPROVEMENTS A. 32 9300 - Plants END OF SECTION 00 0110 -- 2 of 28 -- Construction Documents - 09/20/2024 Ocala Springs Boardwalks - Juniper Prebid Conference 00 0154-1 SECTION 00 0154 PREBID CONFERENCE PREBID CONFERENCE A. A mandatory onsite bidders conference will be scheduled. B. Summarized minutes of this meeting will be circulated to attendees. These minutes will not form part of Contract Documents. C. Information relevant to the Bid Documents will be recorded in an Addendum, issued to Bid Document recipients. END OF SECTION 00 0154 -- 3 of 28 -- Construction Documents - 09/20/2024 Ocala Springs Boardwalks - Juniper Summary 01 1000-1 SECTION 01 1000 SUMMARY PART 1 GENERAL 1.01 PROJECT A. Project Name: OCALA SPRINGS BOARDWALKS - JUNIPER B. Owner's Name: USDA Forest Service. C. Landscape Architect's Name: TSW. D. The Project consists of the removal of (1) existing boardwalk system and construction of (1) new boardwalk system within the Ocala National Forest. The new boardwalk system will utilize a modular system with post-on-pin foundations. Specialty structures such as overlooks, the kayak launch, and the Pedestrian Truss Bridge are also included in the project. 1.02 OWNER OCCUPANCY A. Owner intends to continue to occupy adjacent portions of the park during the entire construction period. B. Owner intends to occupy the Project upon Substantial Completion. C. Cooperate with Owner to minimize conflict and to facilitate Owner's operations. D. Schedule the Work to accommodate Owner occupancy. 1.03 CONTRACTOR USE OF SITE AND PREMISES A. Construction Operations: Limited to areas noted on Drawings. 1. Locate and conduct construction activities in ways that will limit disturbance to site unless alternately arranged with the Owner. B. Provide access to and from site as required by law and by Owner: 1. Do not obstruct roadways, sidewalks, or other public ways without permit. END OF SECTION 01 1000 -- 4 of 28 -- Construction Documents - 09/20/2024 Ocala Springs Boardwalks - Juniper Administrative Requirements 01 3000-1 SECTION 01 3000 ADMINISTRATIVE REQUIREMENTS PART 3 EXECUTION 1.01 SUBMITTAL PROCEDURES A. General Requirements: 1. Use a separate transmittal for each item. 2. Use a single transmittal for related items. 3. Submit separate packages of submittals for review and submittals for information, when included in the same specification section. 4. Transmit using approved form. a. Use Form AIA G810. b. Use Form CSI/CSC Form 12.1A. c. Use Contractor's form, subject to prior approval by Landscape Architect. d. Use form generated by Electronic Document Submittal Service software. 5. Sequentially identify each item. For revised submittals use original number and a sequential numerical suffix. 6. Identify: Project; Contractor; subcontractor or supplier; pertinent drawing and detail number; and specification section number and article/paragraph, as appropriate on each copy. 7. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents. a. Submittals from sources other than the Contractor, or without Contractor's stamp will not be acknowledged, reviewed, or returned. 8. Deliver each submittal on date noted in submittal schedule, unless an earli

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237990)