Description
PERFORMANCE WORK STATEMENT U.S. NAVAL AIR STATION SIGONELLA
NAVCOMTELSTA SICILY
BASE COMMUNICATIONS OFFICE
TELECOMMUNICATIONS SERVICES
1.0 INTRODUCTION
1.1. NCTS Sigonella Mission
Naval Computer and Telecommunications Station (NCTS) Sicily provides mission-critical communications support to U.S.,
NATO, and coalition forces operating in the U.S. Africa Command (AFRICOM), U.S. Central Command (CENTCOM), and
U.S. European Command (EUCOM) areas of responsibility. Commander, Navy Region Europe (COMNAVREGEUR),
SIXTHFLEET operating forces, Commander, U.S. Naval Air Station (NAS) Sigonella, Italy, its tenant commands and
prescribed Department of Defense customers throughout the European Area of RespoThey are nsibility (AOR) and others as
directed.
1.2. Overview
This Performance Work Statement (PWS) specifies the requirement to provide local exchange access services,
analog/digital/VoIP(SIP) access transport services, and an inter/intra-Local Access Transport Area (LATA) interconnect
functions. These services shall be limited to official Government services and shall not include any unofficial services such as
residential or business services for non-Government entities or contractors.
The contractor is responsible to obtain all necessary licenses, government authorizations, professional certifications and
insurance to include personnel and vehicles to carry out the requirements of this PWS.
1.3. Place and Ordering Period Dates
1.3.1. The contractor shall provide all transmission facilities, equipment, materials, maintenance, test equipment, and design
needed to perform and provide local access and transport services to designated demarcation point and destinations specified
in Appendix 1. The contractor shall perform their services duties stated in this PWS at the Government facility and sites.
1.3.2.
Ordering Period Ordering Period Dates
Base Year 30 August 2026 – 29 August 2027
Year One 30 August 2027 – 29 August 2028
Year Two 30 August 2028 – 29 August 2029
Year Three 30 August 2029 – 29 August 2030
Year Four 30 August 2030 – 29 August 2031
Option per 52.217-8 30 August 2031 – 29 February 2032
Total
1.4 Alternate Place of Performance – Contingency Only
As directed by the Contracting Officer Representative (COR), The contractor shall continue performance in emergency or
mission essential conditions. Contractor employees may be required to work at home, another approved activity within the
local travel area or at The contractor's facility in cases of unforeseen conditions or contingencies (e.g., pandemic conditions,
Base exercises, etc.). COR approval is required. To the extent possible, The contractor shall use best efforts to provide the
same level of support in contingency situations, as stated in the PWS. The contractor shall account for the whereabouts of
their personnel should this information be requested by the COR.
-- 1 of 21 --
2.0 SCOPE/TECHNICAL REQUIREMENTS
2.1. General.
This Performance Work Statement defines contractor’s efforts that are required to provide Management network services for
the design, engineering, operation, monitoring, maintenance, and project management for the necessary multiplexing
compatible and integrated fiber/copper multiplexing equipment with all different and most common type of bandwidth
transport cuts, labor, parts/materials, test equipment, tools, supervision, and all other components necessary to operate and
maintain four PTT (Post Telephone and Telegraph) or Public Switched Telephone Network (PSTN) trunks (or their technical
evolution, i.e. SIP VoIP Trunks, or equivalent services) connected to the existing Private Automatic Branch Exchange PABX’s
at NAS II buildings 435/465 and NAS I building 320.
The contractor shall port and maintain existing (20,000) DID (Direct Inward Dialing) numbers.
The existing platform (PTT) is the medium on which land line outgoing traffic is currently generated.
The contractor shall provide a detailed traffic list, broken down by DID number, in electronic format for traffic costs tracking
and assignment to individual cost centers within Sigonella, and for cross-checking and validations of the invoices before
submitting them to the WAWF system. Procedures shall be defined with the Sigonella BCO and shall be consistent with
already established procedures for billing, invoices verification and other services of a similar nature. Correction of error on
invoices shall happen on the basis of written communications between BCO administration and service provider administrative
branch for billing and invoicing. The Contracting Officer’s Representative (COR) is responsible for monitoring and accepting
all services identified in this PWS and into the Appendix 1.
Appendix 1 identifies current and future services required, including characteristics, quantities and locations.
In the event of technology platform evolution from PTT to a new platform (i.e. SIP VoIP Trunks, or equivalent services …),
The contractor shall ensure that the change is executed without any service disruption to the government. The contractor shall
also take all necessary measures to avoid any impact on the existing technology, providing all labor, parts/materials, test
equipment, tools, supervision, and all other components necessary to operate and integrate it with the existing or the evolution
of the Telephone switching environment (i.e. VoIP to TDM or VoIP to VoIP as directed by the Contracting Officer’s
Representative (COR)).
The contractor shall coordinate with the Contracting Officer’s Representative (COR) before installing, removing or changing
equipment.
The Government shall provide rack space and electrical power (48V DC / 220V AC at 50Hz) for the installation of The
contractor’s transmission equipment. If additional rack space is required to support future Government requirements, The
contractor shall coordinate with the COR to determine if space is available.
The contractor’s equipment shall be upgradeable or expandable to support changes in…
Source: SAM.gov, as posted. Verify the current solicitation before responding.