Master Planning/Real Property Management Services

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
PANMCC26P0000038284
NAICS
541330
PSC
C219
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
August 25, 2026
Response due
September 3, 2026
Place of performance
0, SC

What this opportunity is

The Department of Defense is seeking Master Planning/Real Property Management Services under a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. This contract involves providing non-personal services for Base Operating Support (BOS) at various locations, requiring contractors to supply personnel, equipment, and materials necessary for effective service delivery. The notice type is a Combined Synopsis/Solicitation, indicating that interested businesses should track the opportunity closely for further details rather than submitting immediate bids.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Page 1 of 26 PERFORMANCE WORK STATEMENT (PWS) Base Operating Support (BOS) Master Planning Services Part I General Information 1. GENERAL: This is a non-personal services contract to provide Base Operating Support (BOS) Master Planning Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor personnel. 1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Base Operating Support (BOS) Master Planning Services, as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this PWS and contract. 1.1.1. The goal of the USARCENT Engineer is to provide excellent customer service to its worldwide customers at ASCC managed locations, Army forward installations and other regions. 1.2. Background: Current (BOS) is not optimized at USARCENT overseas locations and Army Service Component Command (ASCC) managed locations Worldwide. This has resulted in degraded operational readiness, un-forecasted costs, inadequate quality of life, and inefficient delivery of services. The planning, programming, and budgeting committee (PPBC) approved Program Objective Memorandum (POM) 20-24 requirements in June 2018 to create a BOS Pilot. The Pilot will explore solutions to optimize BOS at select locations requiring long term management assistance. The BOS Pilot for USARCENT will be composed of a USARCENT Engineer Directorate BOS lead and a Master Planning cell of subject matter experts (SMEs). USARCENT assigned and rotational forces deployed to the theater of operations will access base management expertise through the BOS reach back through the USARCENT Engineer Directorate assigned BOS Military or Department of the Army Civilian lead. 1.3. Objectives: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform BOS Master Planning services and deliverables in support of the U.S. Army Central Command (USARCENT) Engineer (ENG) Directorate mission in the United States Central Command (USCENTCOM) area of responsibility (AOR) and Shaw Air Force Base (AFB), South Carolina, except for those items specified as Government furnished property and services. 1.4. Scope: The Base Operating Support (BOS) Master Planning Services contract will provide support to the Master Planning cell as it addresses and support contingency basing issues. The Contractor shall accomplish these non-personal services to optimize BOS at select locations and inform future BOS resourcing and force structure decisions. -- 1 of 26 -- Page 2 of 26 1.5 Period of Performance: The Contractor shall perform this task as detailed below: Base Year: 12 months Period Option Years: Three (3) 12 month Option Periods 1.6. Quality Control: Quality Control is the responsibility of the Contractor. The Contractor shall develop, implement, and maintain a Quality Control Program (QCP) to ensure all work described in this contract is performed at or above the standard defined in the Performance Requirements Summary (PRS). The QCP is developed by the contractor to ensure that it performs and delivers high-quality service and products. The QCP shall include methods of documenting and enforcing quality control operations of both prime contractor and or subcontractor work; including inspection and testing. 1.6.1 The Contractor shall submit their QC Plan within ten (10) days of contract award. After acceptance of the QCP, the contractor shall receive the contracting officer’s (KO) acceptance in writing or any proposed changes to the QC procedures. The contractor shall submit QCP changes within five (5) days to the KO and Contracting Officer’s Representative (COR) for review and approval prior to implementation. The Quality Control Plan shall address as a minimum: 1.6.2. Inspection System. The contractor shall develop, implement and maintain a system to inspect their services as well as their subcontractor services and products to ensure compliance with PWS requirements, and applicable laws and regulations. It shall specify tasks or areas to be inspected on a scheduled or unscheduled basis, the manner in which inspections are to be conducted, the titles of the individuals who will perform the inspections, and the percentage of the work that will be inspected on a recurring basis. 1.6.3. Inspection Files. The contractor shall document all inspections conducted, and the necessary corrective and preventive actions taken. 1.6.4. Deficiency Identification, Prevention and Correction. The QCP shall include a method of identifying and preventing deficiencies in the quality of services performed before the level of performance becomes unacceptable as defined in the PRS, without dependence upon Government direction. The contractor shall identify and prevent defects in quality of products and services performed before the level becomes unacceptable and before they are provided to the Government. The QCP at a minimum shall address process control and continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification; procedures for root cause analysis; corrective and preventive action procedures to include procedures for addressing Government discovered non-conformances; procedures for trend analysis; and procedures for

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗