What this opportunity is

The USDA is seeking contractors for the South Grand Chenier Marsh Creation project in Louisiana, which involves dredging material to create and nourish approximately 466 acres of marsh and constructing 20,375 LF of earthen containment dike. This opportunity is a sources sought notice, indicating that the government is gathering information on potential contractors rather than soliciting bids at this time. The project is likely suitable for small businesses, with a possible 100% small business set-aside, and interested firms should submit their capability statements by the specified deadline.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 US Department of Agriculture (USDA) Statement of Work -- 1 of 5 -- 2 Contents Project ................................................................................................................................................................ 3 General Information.............................................................................................................................................. 3 1.0 Scope of Work............................................................................................................................................. 3 2.0 Background................................................................................................................................................. 3 Contractor Requirements ....................................................................................................................................... 3 3.0 Technical Requirements / Tasks .................................................................................................................... 3 4.0 Government Furnished ................................................................................................................................. 3 5.0 Deliverables / Schedule ................................................................................................................................ 3 6.0 Travel......................................................................................................................................................... 4 7.0 Contractor’s Key Personnel ........................................................................................................................... 4 8.0 Security Requirements.................................................................................................................................. 4 9.0 Data Rights ................................................................................................................................................. 4 10.0 Section 508 – Electronic and Information Technology Standards...................................................................... 4 Attachment....................................................................................................................................................... 4 -- 2 of 5 -- 3 Project ME-32 South Grand Chenier - Baker Tract Marsh Creation Project General Information 1.0 Scope of Work Provide a brief statement of the overall project, including goals and objectives. The South Grand Chenier Baker Tract Marsh Creation (ME-32) project is located in the Mermentau Basin, Chenier Sub-Basin, and Hog Bayou Watershed south of LA Hwy 82 and directly west of Rockefeller Wildlife Refuge. Material dredged from the Gulf of America will be used to create and nourish approximately 466 acres of marsh in southwest Louisiana. Approximately 20,375 LF of earthen containment dike will be constructed. The goal of the project is to create new wetland habitat, restore degraded marsh, and reduce wave erosion of organic soils. 2.0 Background The South Grand Chenier Baker Tract Marsh Creation (ME-32) project is located in the Mermentau Basin, Chenier Sub-Basin, and Hog Bayou Watershed south of LA Hwy 82 and directly west of Rockefeller Wildlife Refuge. The Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Task Force approved the ME-32 project for engineering and design as part of the 23rd Priority Project List in February 2014. The United States Department of Agriculture – Natural Resources Conservation Service (NRCS) was designated as the lead federal sponsor for this project with funding approved through CWPPRA by the United States Congress, and the Wetlands Conservation Trust Fund by the State of Louisiana. The State of Louisiana’s Coastal Protection and Restoration Authority (CPRA) is serving as the non-federal sponsor. The goal of the project is to create new wetland habitat, restore degraded marsh, and reduce wave erosion of organic soils. Material dredged from the Gulf of America will be used to create and nourish approximately 466 acres of marsh in southwest Louisiana. Implementation would promote the expansion of emergent marsh and submerged aquatic vegetation throughout the area. The proposed project will also provide a protective wetland buffer to the local hurricane evacuation route, LA Hwy 82, and complement hurricane protection measures in the area. Creating and nourishing the marsh will aid in prevention of land loss by reducing tidal exchange through the area and providing a platform for growth of emergent vegetation. A completed project will provide critical habitat for several species and help protect life and property in local communities from coastal flooding and storm surge. Contractor Requirements 3.0 Technical Requirements / Tasks All technical requirements of the ME-32 Construction Project is provided in the specifications and drawings 4.0 Government Furnished The following GF data can be provided upon request. Geotechnical Reports Surveys (Bathy, Topographical and Magnetometer) AutoCAD files Design Report 5.0 Deliverables / Schedule The construction schedule is provided as a table. The period of Performance is 339 days and there is 38 weather days. Each item within the provided schedule has a deliverable outline in the specifications. 2a Mag Survey Borrow Area 0 8 8 2b Hydrographic Survey 0 33 33 1 Mobilize to Project site 3 30 33 LNTP Review 33 12 45 3a Contractor Quality Control 0 281 281 2 Construction Surveys 45 234 279 8 Sheet Pile Alternative 45 2 47 4 Containment Dike Construction 47 33 80 5 Install Staff Gauges 50 2 52 7 Install Staff Gauges - Alt 52 1 53 -- 3 of 5 -- 4 1a Place Dredge Pipeline 53 30 83 3 Fill Marsh Creation Area 83 92 175 6 Fill Marsh Creation Area - Alt 175 12 187 11 Fill Marsh Creation Area - ME-20 187 29 216 3a Dewatering Structure Removal 216 6 222 1 Demobilize from

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237990)