What this opportunity is
The Department of Defense is seeking a contractor to provide environmental architect-engineer services for projects assigned to the US Army Garrison Bavaria and Army Environmental Command. This contract will support various U.S. military and environmental programs, including environmental data collection for construction project design, planning, and permitting. The services will be primarily used for environmental engineering tasks such as geological and hydrogeological studies, corrective action plans, and groundwater monitoring. This is a full-and-open procurement with no set-aside used, and interested parties should track the presolicitation notice for further information.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
ENVIRONMENTAL ARCHITECT-ENGINEER SERVICES
1. GENERAL INFORMATION: The Architect-Engineer (A-E), as an independent contractor and not as
an agent of the Government, shall, in accordance with the terms and conditions more particularly set forth
below, provide professional and non-professional support services for projects assigned to the US Army
Garrison Bavaria (USAG Bavaria) and Army Environmental Command (AEC). The A-E shall furnish
the required personnel, management, facilities, supplies, equipment, instruments, and transportation,
materials (other than those to be furnished by the Government as hereinafter provided or in individual
task orders), and other items and services as necessary to accomplish the required services and furnish to
the Government reports and other data together with supporting material developed during the period of
service. During prosecution of the work, the A-E shall provide adequate professional supervision and
quality control to assure the accuracy, quality, completeness, and timely progress of the work. The
general A-E services will be primarily for the Europe District; however other US agencies may utilize the
contract.
2. LOCATION OF THE WORK: A-E Service will be performed for the U.S. Army Corps of Engineers
(USACE), Europe District for projects in the Area of Responsibility (AOR) of the AEC and USAG
Bavaria, for locations in Grafenwöhr, Vilseck, Hohenfels, Freihoelser Forst, Amberg, Garmisch and
surrounding communities, however, some services may be performed for projects anywhere within the
US EUCOM area of operation and responsibility.
3. GENERAL SCOPE OF WORK:
A. The main purpose of this procurement is to provide environmental engineering services to the
USACE for the execution of various U.S. military and environmental programs. Services will be called
to support the development of the military installations e.g. by providing various environmental data
needed for the design, planning and permitting process of construction projects. This general Scope of
Work (SOW) provides a basic description for the efforts under this contract which primarily will be used
for accomplishing the environmental engineering services listed below:
o Environmental-related studies, such as
Geological and hydrogeological studies,
Corrective action plans and projects for soil and groundwater contamination
Groundwater Monitoring for corrective action plans for contaminated site
cleanup projects
Threatened and Endangered Species surveys in support of construction projects
(planning, permitting)
o Design of Environmental projects, such as sanitation landfills, and contaminated site
clean up
o Design for Sanitary landfill rehabilitation projects and construction supervision
o Erosion control designs and studies
o Natural and Cultural Resource Studies in support of construction projects (planning,
permitting)
o Demolition design, including destructive testing and analysis
o Construction Supervision and evaluation of excavation methods and related contaminated
soil disposal management
o Asbestos surveys and abatement design (sampling and analysis for lung penetrating fibers
in building insulation materials, including removal design)
-- 1 of 9 --
o Geographic Information Systems (GIS): Development and update of data layers in
support of construction projects and installation planning
o Design of projects for repair, rehabilitation, maintenance, or new construction
o Engineering and feasibility studies for real property
o Site investigations and surveys related to real property
o Structural investigations related to real property
o Construction supervision and inspection
B. Though not specifically identified otherwise, the work may also include site surveys; work
plans; quality control and quality assurance plans; health and safety plans; sampling and analytical testing
for soil borings, well installation and groundwater, surface water, sediment, air monitoring and any other
field work to obtain data for engineering analysis to support real property; environmental site surveys and
topographic surveys; environmental consultation; environmental claims support; training; pilot studies;
cultural and natural resource services; petroleum site assessments; planning level surveys; supporting
GIS, aerial photogrammetry, and satellite imagery; disposal of investigative derived waste associated with
real property.
C. The Contractor may also be called upon to execute A-E efforts covered under the Army's four
environmental pillars which are compliance, pollution prevention, conservation and restoration. Some of
the additional environmental projects which the Contractor could be required to perform include
hazardous materials and hazardous waste surveys; management plans; studies on specific hazardous
materials (radon, asbestos, lead, PCBs and dioxin); and noise reduction studies. The range of work
potentially required by this contract is not limited to the environmental activities noted above.
D. Actual work to be performed by the Contractor will be requested under individual task orders
(TO). A project-specific schedule of services will accompany each individual TO to meet the special site
and problem requirements of the USAG Bavaria, AEC or the Europe District.
E. The Contractor may be called on to perform all or part of the services described herein and as
more specifically identified in the individual TO. It should be noted that, (1) not all services that could be
ordered under this contract to execute the Army's four environmental pillars are described herein and, (2)
where example schedules of services are shown, requirements of individual TO's may deviate in certain
details from these general scopes.
F. Information on Typical Task Orders. TOs may cover the entire gamut of general and/or
environmental services. However, for the purposes of establishing unit costs for labor and materials the
more frequently requested types of services are discussed below. Only ge…
Source: SAM.gov, as posted. Verify the current solicitation before responding.