NIST Boulder Building 2 1330 Fume Hood Replacement

COMMERCE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
1333ND26RNB190028
NAICS
236220
PSC
Z2AA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 9, 2026
Response due
July 1, 2026
Place of performance
Boulder, CO

What this opportunity is

The Department of Commerce is seeking a contractor for the replacement of fume hoods in Building 2 at NIST Boulder, Colorado, under NAICS code 236220. This opportunity is a total small business set-aside, making it suitable for small businesses in the construction sector. The notice type is a combined synopsis/solicitation, indicating that interested parties should prepare to submit proposals rather than simply track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

NIST BOULDER BUILDING #2 – 1330 FUME HOOD 2026 TABLE OF CONTENTS DIVISION 01, 11, 23, 26, 27, 28 – PROJECT NIST SPECIFICATIONS 01 33 00 SUBMITTAL PROCEDURES 01 78 23 OPERATION AND MAINTENANCE DATA 11 53 13 LABORATORY FUME HOODS AND RELATED PRODUCTS 23 05 53 IDENTIFICATION FOR HVAC AND LAB EQUIPMENT 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 31 13 PVC LABORATORY EXHAUST DUCTWORK 23 34 16 UTILITY SET FANS 26 00 10 GENERAL ELECTRICAL REQUIREMENTS 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL 26 05 02 EQUIPMENT WIRING SYSTEMS 26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 26 05 44 SLEEVES AND SLEEVES SEALS FOR ELECTRICAL SYSTEMS 26 05 48 VIBRATION CONTROLS FOR ELECTRICAL SYSTEMS 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 27 26 WIRING DEVICES 26 27 33 POWER DISTRIBUTION UNITS 26 28 13 FUSES 26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 26 41 13 LIGHTNING PROTECTION FOR STRUCTURES 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEM 27 05 28 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS 28 31 13 FIRE ALARM SYSTEM SITE SPECIFIC DOCUMENTS: NIST CONDUIT COLOR CHART NIST EQUIPMENT LIST AND EQUIPMENT ID NIST ELECTRICAL SITE STANDARDS END OF DIVISION 01, 11, 23, 26, 27, 28 TABLE OF CONTENTS -- 1 of 183 -- NIST BOULDER BUILDING #2 – 1330 FUME HOOD - SUBMITTAL PROCEDURES 013300 - 1 SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 DEFINITIONS A. Action Submittals: Written and graphic information and physical samples that require project COR responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals." B. Informational Submittals: Written and graphic information and physical samples that do not require project COR responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals." 1.3 SUBMITTAL SCHEDULE A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by project COR and additional time for handling and reviewing submittals required by those corrections. 1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and Contractor's construction schedule. 2. Initial Submittal: Submit concurrently with startup construction schedule. Include submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication. 3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's construction schedule. a. Submit revised submittal schedule to reflect changes in current status and timing for submittals. 4. Format: Arrange the following information in a tabular format: a. Scheduled date for first submittal. b. Specification Section number and title. c. Submittal Category: Action; informational. d. Name of subcontractor. e. Description of the Work covered. -- 2 of 183 -- NIST BOULDER BUILDING #2 – 1330 FUME HOOD - SUBMITTAL PROCEDURES 013300 - 2 1.4 SUBMITTAL FORMATS A. Submittal Information: Include the following information in each submittal: 1. Project name. 2. Date. 3. Name of Contractor. 4. Name of firm or entity that prepared submittal. 5. Names of subcontractor, manufacturer, and supplier. 6. Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals. 7. Category and type of submittal. 8. Submittal purpose and description. 9. Number and title of Specification Section, with paragraph number and generic name for each of multiple items. 10. Drawing number and detail references, as appropriate. 11. Indication of full or partial submittal. 12. Location(s) where product is to be installed, as appropriate. 13. Other necessary identification. 14. Remarks. 15. Signature of transmitter. B. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by the project COR on previous submittals. Indicate by highlighting each submittal or noting on attached separate sheet. C. PDF Submittals: Prepare submittals as PDF package, incorporating complete information into each PDF file. Name PDF file with submittal number. D. Submittals for Web-Based Project Software: Prepare submittals as PDF files. 1.5 SUBMITTAL PROCEDURES A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections. 1. Web-Based Project Software: Prepare submittals in PDF form, and upload them to web- based Project software website administered by the project COR. B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. 2. Submit all submittal items required for each Specification Section concurrent

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)