What this opportunity is
The Department of Defense is seeking to increase the ceiling capacity of an existing Multiple Award Task Order Contract (MATOC) for specialty contractors with NAICS code 238220, which includes plumbing, heating, and air conditioning services. This Total Small Business Set-Aside contract is suitable for small businesses that can provide labor, equipment, and materials for repair and minor construction work on real property at Joint Base Lewis-McChord (JBLM). As a Sources Sought notice, this is a tracking opportunity, and interested small businesses should monitor the solicitation for a formal request for proposals.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
SECTION 01 11 00
BASE UMBRELLA CONTRACT STATEMENT OF WORK
07 December 2021
1. DESCRIPTION OF WORK:
Provide all labor, equipment, and materials (except as indicated otherwise noted in the specific Task Order) and
perform all work in strict accordance with the Task Order Statement Of Work (SOW), Specifications and
Drawings required for this Multiple Award Task Order Contract (MATOC). The MATOC is for Specialty
Contractors with the North American Industry Classification System NAICS Code 238220 Plumbing, Heating
and Air Conditioning for repair and minor construction work on real property at Joint Base Lewis-McChord
(JBLM). The work is required in support of Public Works (PW) activities headquartered at Joint Base Lewis-
McChord (JBLM). During the contract period, the Government will identify tasks required to complete each
specific job and will issue Requests for Task Order Proposals (RTOP) to all the Contractors. The Contractor
shall be required to furnish all materials, equipment and labor necessary to manage and accomplish the Task
Orders (TO). The Task Orders will include construction, repair, and service tasks in the mechanical discipline.
Mechanical work may include replacement, installation, repair and service of boilers, HVAC systems,
plumbing, building control systems, Testing, Adjusting and Balancing of mechanical systems (TAB), and
mechanical equipment. Associated incidental carpentry, painting, fencing, demolition, asbestos and lead
abatement, and environmental clean-up may be required with the mechanical task orders. The task order work
will be comprised of approximately 95% construction and repair work and 5% services.
1.1. Area Description:
1.1.1. The work will be performed on facilities at Joint Base Lewis-McChord (JBLM), Washington.
1.2. The Principal Items to be Accomplished under individual Task Orders:
1.2.1. Replace or repair mechanical systems or components of a system as per the Task Order SOW,
which may include incidental work to the building’s finishes, structure, civil or electrical components or
systems. See Section 5 for Task Order process.
1.2.2. Provide service work to mechanical systems or components of a system which may include
incidental work to the building’s finishes, structure, civil, or electrical components or systems. Service work
may include but not be limited to; equipment and system inspections, tuning, cleaning, and preventive
maintenance.
1.2.3. Provide "as-built" drawings as required by Task Order.
1.2.4. Perform other work necessary as described in the Task Order.
1.2.5. The Contractor shall be responsible for providing a complete and useable product and/or system and
shall be responsible for accomplishing all tasks incidental to the completion of the Task Order
requirements. Requirements for a complete and useable product and/or system which are not explicitly
called out in the SOW but reasonably discernable via any method other than destructive testing shall be
considered a requirement of the Task Order.
-- 1 of 8 --
2
1.3. Period of Performance:
1.3.1. The Period of Performance for the Base Umbrella Contract shall be five years from the date of
award. Each Task Order Period of Performance shall be determined in the SOW and shall start at notice-to-
proceed (NTP) of the individual Task Order. Task Orders typically do not exceed 180 calendar days.
1.3.2. The Period of Performance for each individual Task Order is the period between TO NTP and the
time all work under the TO is complete. The period of performance will be defined for each TO.
2. DRAWINGS , SPECIFICATIONS, AND CODES:
2.1. Drawings:
2.1.1. Drawings applicable to all work performed under this contract will be provided with individual
Task Orders.
2.1.2. Verification of the accuracy of the drawings is the responsibility of the Contractor. The Government
cannot confirm the accuracy of any drawings presented to the Contractor.
2.2. Specifications:
2.2.1. Specifications applicable to all work performed under this contract will be provided with individual
Task Orders.
2.3. Codes:
2.3.1. The Contractor shall comply with all pertinent Local, State, and Federal building
life/health/safety codes as listed in the individual Task Order. Typical codes include the following with
the Task Order having specific applicable codes:
2.3.1.1. Applicable Unified Facilities Criteria (UFC)
2.3.1.2. UFC 1-200-01: General Building Requirements
2.3.1.3. UFC 1-200-02: High Performance and Sustainable Building Requirements
2.3.1.4. ASA IE&E SDD policy
2.3.1.5. UFC 1-201-01 Non-Permanent DOD Facilities in Support of Military Operations
2.3.1.6. EM 385-1-1
(http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx)
2.3.1.7. National Electrical Code, NFPA 70
2.3.1.8. National Fire Protection Association (NFPA) Codes
2.3.1.9. Telecommunication Industry Association/Electrical Industry Association Wiring
Standards (Building Telecommunication Wiring Standards)
2.3.1.10. Army Installation Information Infrastructure Architecture Policy (I3A)
2.3.1.11. JBLM Design Standard specifications (http://www.lewis-
mcchord.army.mil/designstandards/)
2.3.1.12. JBLM 420-1
2.3.1.13. JBLM Master Plan, which includes Architectural Appearance Standards
2.3.1.14. PWE-707, Standard Operating Procedure for Construction and Demolition (C&D) Waste
Planning and Reporting (Available through Government Project Manager)
2.3.1.15. National Pollutant Discharge Elimination System (NPDES) small Municipal Separate
Storm Sewer Systems (MS4) Permit No. WAS-026638. Use guidance documents found at
-- 2 of 8 --
3
https://home.army.mil/lewis-mcchord/index.php/my-Joint-Base-Lewis-Mcchord/all-
services/public_works-environmental_division/stormwater.
2.4. Additional Requirements:
2.4.1. The Contractor shall comply with the requirements of all technical exhibits, appendices,
specifications, and any other documents included as part of this contract.
3. CONSTRUCTION PHASING:
3.1. Government use of the fa…