PCB MODULE ASSY
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
N0010426QJB87
NAICS
334412
PSC
5998
Posted
July 23, 2026
Response due
July 30, 2026
What this opportunity is
The Department of Defense is soliciting bids for a PCB (Printed Circuit Board) module assembly, classified under NAICS code 334412, which pertains to the manufacture of printed circuit boards. This opportunity is open to all businesses, with no specific set-aside designation. As a solicitation, bidders will need to track the opportunity and submit a formal bid in response to the government's requirements.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CONTACT INFORMATION|4|N7M1.16|GPM|717-605-2828|dakota.s.bentzel.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Combo||TBD|N00104|TBD|TBD|See schedule|TBD|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|dakota.s.bentzel.civ@us.navy.mil|
OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 days|
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x|
Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's signed acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 60 days
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Your quote should include the following information:
QUOTE AMOUNT AND RTAT
Unit Price:__________
Total Price:__________
Repair Turnaround Time (RTAT): _______ days
If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth
regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this
contract.
Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
Return Material Authorization # (RMA), if applicable:__________
Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________
IF ITEM NOT PREVIOUSLY PURCHASED BY NAVSUP WSS - or - PRICES INCREASED
Provide the NSN of a similar item or, if current NSN is an upgrade part, provide the previous NSN.
If previously sold to another buying activity or in the commercial marketplace, provide a copy of your company's invoice (redacted versions are acceptable).
If pricing is not in line with historical pricing, provide the basis of your company's pricing.
TESTING AND EVALUATION IF BEYOND REPAIR
T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to
exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment.
The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________.
AWARDEE INFO & PERFORMANCE LOCATION
Awardee CAGE: __________
Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________
Facility/Subcontractor CAGE (where the asset should be shipped), if not same as ""awardee CAGE"":__________
IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW
New unit price:__________
New unit delivery lead-time:__________
The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the
option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the PCB MODULE ASSY .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS
3.1 Cage Code/Reference Number Items - The PCB MODULE ASSY repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be
performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor
or government approved documents developed to provide technical repair procedures.
CAGE___Ref. No.
;6Z538 1297-10-030;
3.2 Marking - This item shall be physically identified in accordance
with ;MIL-STD-1…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 334412)
CIRCUIT CARD ASSEMB
DEPT OF DEFENSE · Solicitation · due October 22, 2026
CIRCUIT CARD ASSEMB
DEPT OF DEFENSE · Solicitation · due October 22, 2026
66--COUNTER ASSEMBLY,EL
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 3, 2026
59--ELECTRONIC COMPONEN
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due August 7, 2026
CIRCUIT CARD ASSEMB
DEPT OF DEFENSE · Solicitation · due August 24, 2026
CIRCUIT CARD ASSEMB
DEPT OF DEFENSE · Solicitation · due August 24, 2026