Prescott Replace Steam Boilers (Project No. 649-22-104)

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
36C26226B0017
NAICS
236220
PSC
Z2DA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
June 11, 2026
Response due
July 1, 2026
Place of performance
Prescott, AZ

What this opportunity is

The Department of Veterans Affairs is soliciting bids for the replacement of steam boilers at the Northern Arizona VA Health Care System under Project No. 649-22-104. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, making it particularly suitable for qualified small firms in this category. Interested contractors should note that this is a solicitation notice, indicating that they can submit bids rather than simply track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

12-01-21 REPLACE STEAM BOILERS, NAVAHCS (CD SET) PROJECT # 649-22-104 00 01 10-1 DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS TABLE OF CONTENTS Section 00 01 10 SECTION NO. DIVISION AND SECTION TITLES DATE DIVISION 00 - SPECIAL SECTIONS 00 01 15 List of Drawing Sheets 05-20 DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 General Requirements 05-21 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 35 Special Inspections 06-21 01 74 19 Construction Waste Management 01-21 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15 DIVISION 02 – EXISTING CONDITIONS 02 21 13 Site Surveys 01-21 02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21 DIVISION 03 – CONCRETE 03 30 00 Cast-in-Place Concrete 01-21 DIVISION 04 – MASONRY 04 05 13 Masonry Mortaring 10-17 04 20 00 Unit Masonry 08-17 DIVISION 05 – METALS 05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21 DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 72 00 Roof Accessories 01-21 -- 1 of 1310 -- 12-01-21 REPLACE STEAM BOILERS, NAVAHCS (CD SET) PROJECT # 649-22-104 00 01 10-2 SECTION NO. DIVISION AND SECTION TITLES DATE 07 92 00 Joint Sealants 10-17 DIVISION 08 - OPENINGS 08 11 13 Hollow Metal Doors and Frames 01-21 08 51 23 Steel Windows 01-21 08 71 00 Door Hardware 01-21 08 80 00 Glazing 01-21 DIVISION 09 – FINISHES 09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 91 00 Painting 01-21 DIVISION 13 – SPECIAL CONSTRUCTION 13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-14 DIVISION 21- FIRE SUPPRESSION 21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15 DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) 23 05 10 Common Work Results for Boiler Plant and Steam Generation 04-20 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 02-20 23 05 51 Noise and Vibration Control for Boiler Plant 04-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 02-20 23 08 11 Demonstrations and Tests for Boiler Plant 04-20 23 09 11 Instrumentation and Control for Boiler Plant 08-21 23 11 23 Facility Natural-Gas Piping 04-20 23 21 11 Boiler Plant Piping Systems 09-21 23 34 00 HVAC Fans 02-20 23 50 11 Boiler Plant Mechanical Equipment 11-17 23 51 00 Breechings, Chimneys, and Stacks 04-20 23 52 33 Water-Tube Boilers 08-21 23 81 00 Decentralized Unitary HVAC Equipment 03-20 DIVISION 25 – INTEGRATED AUTOMATION 25 10 10 Advanced Utility Metering System 02-10 -- 2 of 1310 -- 12-01-21 REPLACE STEAM BOILERS, NAVAHCS (CD SET) PROJECT # 649-22-104 00 01 10-3 SECTION NO. DIVISION AND SECTION TITLES DATE DIVISION 26 – ELECTRICAL 26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-17 26 08 00 Commissioning of Electrical Systems 11-16 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 32 13 Engine Generators 01-18 26 41 00 Facility Lightning Protection 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18 DIVISION 27 – COMMUNICATIONS 27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 DIVISION 28 – ELECTRONIC SAFETY AND SECURITY 28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 09-11 28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11 DIVISION 33 – UTILITIES 33 10 00 Water Utilities 03-17 -- 3 of 1310 -- 05-01-20 REPLACE STEAM BOILERS, NAVAHCS (CD SET) PROJECT # 649-22-104 00 01 15 - 1 SECTION 00 01 15 LIST OF DRAWING SHEETS The drawings listed below accompanying this specification form a part of the contract. Drawing No. Title GENERAL STRUCTURAL ARCHITECTURAL FIRE PROTECTION MECHANICAL ELECTRICAL - - - END - - - -- 4 of 1310 -- 05-01-20 REPLACE STEAM BOILERS, NAVAHCS (CD SET) PROJECT # 649-22-104 00 01 15 - 2 SECTION 00 01 15 LIST OF DRAWINGS The drawings listed below accompanying this specification form a part of the contract. Drawing No. Title GENERAL CS001 Cover Sheet / Vicinity Map CS002 Risk Assessment CS003 Risk Assessment CS004 Risk Assessment GI-001 Code Data and Room Program GI-002 General Notes, Symbols, Abbreviations GI-003 Phasing Plan GI-004 First Floor Like Safety Plan GI-005 Catwalk and Mezzanine Life Safety Plan HA-101 Basement & First Floor Asbestos Abatement Plans HL-101 Basement Floor Lock Out Tag Out Plan HL-102 First Floor Lock Out Tag Out Plan HL-103 Mezzanine Floor Lock Out Tag Out Plan HL-104 Roof Lock Out Tag Out Plan CIVIL CU-1 Utility Drawing STRUCTURAL SE-001 General Structural Notes SE-100 Footing and Foundations/House Keeping Slab Plan SE-200 Catwalk and Mezzanine Plan SE-300 Roof Equipment Plan SE-400 Enlarged Stair Plan SE-401 Structural Elevations SE-500 Details SE-501

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)