Description
STATEMENT OF WORK
PRODUCTION SUPPORT SERVICES (PSS)
1
1. SCOPE:
This Statement of Work (SOW) establishes the Industrial Supply Division requirement for Production Support Services
(PSS) in support of the Depot Level Maintenance (DLM) effort at Fleet Readiness Center Southeast (FRCSE) and its
supported areas, activities, tenants, and customers. Production Support Services include, but are not limited to, Material
and Tool Management, Production Control, Logistics, and Distribution Services required to ensure the continuous flow
of mission-essential parts and components to DLM production lines.
2. APPLICABLE DOCUMENTS:
2.1 Department of War (DoW) (Formerly known as Department of Defense (DoD) specifications:
2.1.1 DoD National Industrial Security Program Operating Manual (NISPOM) codifying 32 Code of Federal Regulations
Part 117, NISPOM Rule.
2.1.2 SECNAV M-5510.36B, Department of the Navy Information Security Program, 12 Jul 2019
2.1.3 DoDI 5200.48, Controlled Unclassified Information (CUI), 6 Mar 2020.
2.1.4 COMNAVAIRFORINST 4790.2, Naval Aviation Maintenance Program
2.1.5 DoD Instruction 5230.24 Distribution Statements on DoD Technical Information, 10 Jan 2023
2.1.6 SECNAV 5510.30C, Department of the Navy Personnel Security Program, 24 Jan 2020
2.1.7 OPNAVINST 3440.17A, Navy Installation Emergency Management Program, 1 Aug 2014
2.1.8 DODI 8582.01 - Security of Non-DoD Information Systems Processing Unclassified Nonpublic DoD Information,
9 Dec 2019
2.1.9 DoDI 5200.01 – DoD Information Security Program and Protection of Sensitive Compartmented Information
(SCI), 21 Apr 2016
2.1.10 COMFRCINST 4855.6D Industrial Quality Operations, 30 Oct 2024
2.2 APPLICABLE FRCSE INSTRUCTIONS AND NOTICES:
2.2.1 FRCSEINST 3440.1D, Unified Disaster Preparedness and Emergency Action Plan and Fire Bill, 10 Sep 2025
2.2.2 FRCSEINST 4030.3 B, In-Process Protection, Preservation, Transportation and Material Handling of Aircraft
(A/C), Engine and Component Parts During Repair Process and Storage, 5 Mar 2026
2.2.3 FRCSEINST 4035.1C, Component Repair Program, 5 Mar 2026
2.2.4 FRCSEINST 4101.1A, Energy Management Program, 6 Mar 2025
2.2.5 FRCSEINST 4408.3B, Back rob, Cannibalization, Divert and Reassignment Actions, 15 Apr 2022
2.2.6 FRCSEINST 4734.1B, Inventory Management and Control of Calibrated Equipment, 21 Jun 2024
2.2.7 FRCSEINST 4790.6A, Controlled Environment Facilities, 22 May 2018
2.2.8 FRCSEINST 4790.8B, Local Maintenance Requirements Cards (LMRCS) Procedures, 10 Sep 2025
2.2.9 FRCSEINST 4790.111C, Foreign Object Damage (FOD) and Debris Prevention, 18 Jul 2024
-- 1 of 32 --
STATEMENT OF WORK
PRODUCTION SUPPORT SERVICES (PSS)
2
2.2.10 FRCSEINST 4790.112E, Tool Control Program, 11 Sep 2024
2.2.11 FRCSEINST 4855.3D, Discrepancy Work Order (DWO), 18 Mar 2025
2.2.12 FRCSEINST 4870.1B, Facilities Equipment and Industrial Plant Equipment (IPE) Management Program, 10 Sep
2025
2.2.13 FRCSEINST 5090.1D, Environmental Management System, 19 Apr 2022
2.2.14 FRCSEINST 5090.2D Emergency Response Procedures for Oil and Hazardous Substance Release Spill Incidents,
11 May 2021
2.2.15 FRCSEINST 5090.3D, Hazardous Waste Management, 23 Jul 2014
2.2.16 FRCSEINST 5090.14E, Hazardous Material Control and Management (HMC&M), 26 Jan 2026
2.2.17 FRCSEINST 5103.2D, Safety Management System, 10 Sept 2025
2.2.18 FRCSEINST 5103.8C, Mishap Investigation, Reporting, and Record Keeping, 21 Jun 2024
2.2.19 FRCSEINST 5103.9D, Personal Protective Equipment (PPE) Program, 10 Sep 2020
2.2.20 FRCSEINST 5103.12C, Hearing Conservation and Noise Abatement Program, 19 Sep 2022
2.2.21 FRCSEINST 5103.15C, Heavy Metals Control Program, 22 May 2018
2.2.22 FRCSEINST 5103.28B, Reports of Unsafe or Unhealthful Working Conditions, 16 Jun 2021
2.2.23 FRCSEINST 5110.1D, Official Mail Services, 21 Jun 2024
2.2.24 FRCSEINST 5330.1A, Working Hours, Breaks, and Lunch Periods, 27 Sep 2017
2.2.25 FRCSEINST 5340.1B, Solicitation and the Conduct of Personal Commercial Affairs, 17 Apr 2025
2.2.26 FRCSEINST 5355.1A, Drug Free Workplace Program, 15 Sep 2023
2.2.27 FRCSEINST 5500.5B, Physical Security Plan, 5 Sep 2017
2.2.28 FRCSEINST 5510.14A, Information, Personnel and Industrial Security Procedures, 19 Nov 2018
2.2.29 FRCSEINST 5510.15B, Electronic Keying Material System Documentation and Storage, 8 Apr 2016
2.2.30 FRCSEINST 5605.2C, Bulletin Boards, 19 Dec 2024
2.2.31 FRCSEINST 11014.2A, Preventative, Corrective, and Predictive Maintenance (PDM) Program, 27 Jun 2024
2.2.32 FRCSEINST 11200.1A, Motorized Transportation Equipment and Vehicles, 1 Nov 2011
2.2.33 FRCSEINST 13000.2C, Aircraft Kitting Process, 1 April 2026
2.2.34 FRCSEINST 13090.1B, Maintenance of Aircraft, Engine, Component, and Seat Logbooks, 9 Apr 2018
2.2.35 FRCSEINST 4790.121, Depot Level Maintenance Electrostatic Discharge Protection, 19 Jun 2018
-- 2 of 32 --
STATEMENT OF WORK
PRODUCTION SUPPORT SERVICES (PSS)
3
2.2.36 FRCSEINST 13400.3C, Identification and Traceability of Components and Parts Through the Production Process,
18 Jul 2024
2.3 OTHER APPLICABLE DOCUMENTS:
2.3.1 AS9100D, Aerospace Quality Management Systems (QMS) – Requirement for Aviation, Space, and Defense
Organizations, September 2016.
2.3.2 ISO 9001 Quality Management System (QMS) Requirements for Aviation, Space, and Defense Organizations,
September 2015.
2.3.3 ISO 14001 Environmental Management System (EMS) Requirements for Aviation, Space, and Defense
Organizations, Date published: April 2026.
2.3.4 Occupational Safety and Health Administration (OSHA) Standards in accordance with 29 CFR 1910
Note:
1. All work performed must be in strict compliance with the government referenced instructions and data provided
within the SOW.
2. These applicable documents may be revised during performance of the contract. The contractor must comply with
the latest version. The most current versions of these documents are available on FRCSE Intra1. If unable to access
these files, please contact Technical Point of Contact (TPOC).
3. Specif…
Source: SAM.gov, as posted. Verify the current solicitation before responding.