What this opportunity is
The Department of Veterans Affairs is seeking contractors for the EHRM Infrastructure Upgrades at the Minneapolis VAMC, specifically focusing on the modernization of the main computer room. This project is set aside for Service-Disabled Veteran-Owned Small Businesses, making it suitable for qualified small firms in this category. Interested vendors should note that the notice type is a solicitation, indicating that they will need to prepare and submit bids to compete for this contract.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
EHRM Infrastructure Upgrades - Minneapolis VAMC - MCR Modernization
Project #: 618-26-701
Door Hardware
08 71 00 - 17
INTERIOR SECURITY DOORS
INTERIOR SINGLE SECURITY DOORS
HW-SH-3F
Each [AC, EL, REX, DPS] Door to Have: RATED
1 Continuous Transfer Hinge x INTEGRAL HINGE GUARD CHANNEL
X ADJUSTA-SCREWS x 4-THRUWIRE TRANSFER x
IN-HINGE ACCESS PANEL
1 Electrified Lock F13-MOD x RIGID OUTSIDE LEVER X NO INSIDE
TURN X KEY RETRACTS LATCHBOLT AND
DEADBOLT (E01-REX, E06) 24VDC
1 Power Supply Regulated, Filtered, 24VDC, Amperage
as required
1 Closer C02011/C020211
1 EL Rim Exit Device ANSI 09 x E01 x E04
1 Auto Door Bottom R0Y346 – HEAVY DUTY
2 Mop Plate
1 Edge Guard (@ Wood Doors) J208M / J211 (VERIFY), CUT: HARDWARE
1 Wall Stop L02101 CONVEX
1 Floor Stop (if wall not available) L02121 x 3 FASTENERS
1 Set Self-Adhesive Seals R0Y154
1 Alarm Contact
120VAC POWER, CONDUIT, AND WIRING BY DIVISION 26.
1 Access Control Reader by Division 28
Door normally closed and locked.
Entrance by presenting a valid card to card-reader.
Egress allowed at all times.
Loss of power maintains security from lock side, entrance by mechanical key only.
Door monitored for door ajar and forced open.
INTERIOR PAIRS OF SECURITY DOORS
HW-SH-9A
Each [PB] Pair to Have: [AC, ELR, REX, DPS] Integrated Door to Have: RATED
2 Continuous Transfer Hinge x INTEGRAL HINGE GUARD CHANNEL
X ADJUSTA-SCREWS x 4-THRUWIRE TRANSFER x
IN-HINGE ACCESS PANEL
1 Electrified Lock F07 (E01-REX, E06) 24VDC
1 Set Auto Flush Bolts TYPE 25
1 Dust Proof Strike L04021
1 Push-button Combination Lock N3 – A156.13 F07 G1 E06
1 Coordinator TYPE 21A
1 Overlapping Astragal with R0Y634 x R0Y154 x THRU-BOLTS
Self-Adhesive Seal2 Closers C02011/C02021
4 Armor Plates J101 x 1.275 MM (0.050 INCH) THICKNESS
2 Edge Guard (@ Wood Doors) J208M / J211 (VERIFY), CUT: HARDWARE
2 Overhead Stops C01541-ADJUSTABLE
1 EL Rim Exit Device ANSI 09 x E01 x E04
2 Set Self-Adhesive Seals R0Y154
1 Position Switch Alarm Contact
1 Power Supply Regulated x 24VDC x Amperage As Req'd
1 Access Control Reader by Division 28
1 Auto Door Bottom R0Y346 – HEAVY DUTY
-- 1 of 788 --
EHRM Infrastructure Upgrades - Minneapolis VAMC - MCR Modernization
Project #: 618-26-701
Door Hardware
08 71 00 - 18
2 Alarm Contacts
120VAC POWER, CONDUIT, AND WIRING BY DIVISION 26
Door normally closed and locked.
Entrance by presenting a valid card to card-reader.
Egress allowed at all times.
Loss of power maintains security from lock side, entrance by mechanical key only.
Door monitored for door ajar and forced open.
- - - E N D - - -
-- 2 of 788 --
EHRM Infrastructure Upgrades - Minneapolis VAMC - MCR Modernization
Project #: 618-26-701
Subsurface Preparation for Floor Finishes
09 05 16 - 1
SECTION 09 05 16
SUBSURFACE PREPARATION FOR FLOOR FINISHES
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies subsurface preparation requirements for areas to receive the installation
of applied and resinous flooring. This section includes removal of existing floor coverings,
testing concrete for moisture and pH, remedial floor coating for concrete floor slabs having
Unsatisfactory moisture or pH conditions, floor leveling and repair as required.
1.2 RELATED WORK
A. Section 07 92 00, JOINT SEALANTS.
1.3 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA and TEST
DATA.
B. Written approval confirming product compatibility with subfloor material manufacturer and the
flooring manufacturer
C. Product Data:
1. Moisture remediation system
2. Underlayment Primer
3. Cementitious Self-Leveling Underlayment
4. Cementitious Trowel-Applied Underlayment (Not suitable for resinous floor finishes)
D. Test Data:
1. Moisture test and pH results performed by a qualified independent testing agency or
warranty holding manufacturer’s technical representative.
1.4 DELIVERY AND STORAGE
A. Deliver materials in containers with labels legible and intact and grade-seals unbroken.
B. Store material to prevent damage or contamination.
1.5 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications
are referenced in text by basic designation only.
B. ASTM International(ASTM):
D638-14(2014) ...................... Standard Test Method for Tensile Properties of Plastics
D4259-18(2019) .................... Standard Practice for Preparation of Concrete by Abrasion Prior
to Coating Application.
C109/C109M-20b(2020) ....... Standard Test Method for Compressive Strength of Hydraulic
Cement Mortars (Using 2-in. Cube Specimens
7234-19(2020) ....................... Standard Test Method for Pull-Off Adhesion Strength of Coatings
on Concrete Using Portable Pull-Off Adhesion Testers
C. E96/E96M-16(2016) Standard Test Methods for Water Vapor Transmission of Materials
F710-1e1(2020) .................... Standard Practice for Preparing Concrete Floors to Receive
Resilient Flooring
F1869-16a ............................. Standard Test Method for Measuring Moisture Vapor Emission
Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
-- 3 of 788 --
EHRM Infrastructure Upgrades - Minneapolis VAMC - MCR Modernization
Project #: 618-26-701
Subsurface Preparation for Floor Finishes
09 05 16 - 2
F2170-19a(2020) .................. Standard Test Method for Determining Relative Humidity in
Concrete Floor Slabs Using in situ Probes
C348-20(2020) ...................... Standard Test Method for Flexural Strength of Hydraulic-Cement
Mortars
C191-19(2020) ...................... Standard Test Method for Time of Setting of Hydraulic Cement
by Vicat Needle
PART 2 - PRODUCTS
2.1 MOISTURE REMEDIATION COATING
A. System Descriptions:
1. High-solids, epoxy system designed to suppress excess moisture in concrete prior to an
overlayment. For use under resinous products, VCT, tile and carpet where issues caused
by moisture vapor are a concern.
B. Products: Subject to compliance with applicable fire, health, environmental, and safety
requirements for storage, handling, installation, and …
Source: SAM.gov, as posted. Verify the current solicitation before responding.