Renovate Common Areas of Single Soldier Unaccompanied Personnel Housing (UPH) Fort Hamilton

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W15QKN26QA122
NAICS
236220
PSC
Z2AZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 12, 2026
Response due
June 30, 2026
Place of performance
Brooklyn, NY

What this opportunity is

The Department of Defense is seeking a contractor to renovate common areas of the Single Soldier Unaccompanied Personnel Housing at Fort Hamilton, NY. This project, set aside for total small businesses, involves tasks such as removing and disposing of existing fixtures, installing new air conditioning units, and performing masonry work. Interested small businesses should note that this is a solicitation notice, indicating that they can submit bids for the work outlined in the scope.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

SCOPE OF WORK U.S. ARMY GARRISON, FORT HAMILTON, DIRECTORATE OF PUBLIC WORKS- OPERATIONS AND MAINTENANCE DIVISION-129 WAINWRIGHT DRIVE, BROOKLYN NY 11252-6800 WORK REQUEST #: HAM1 DPW00004-6J Bldg. 209 PREPARED BY: Drew Cavosi DATE: Apr 6, 2026 1. SUBJECT: Renovate common areas Single Soldier UPH. 2. SCOPE OF WORK: The work covered in this scope consists of furnishing all labor, expertise, equipment, materials, facilities, transportation, and appliances necessary to perform the following work. THE CONTRACTOR WILL COMPLETE THE FOLLOWING REQUIREMENTS: REMOVE AND DISPOSE OF THE FOLLOWING ITEMS: • Cove base, vinyl, 4”, approx. (160) L.F. • Blinds, interior, horizontal, 48” including hardware (60) ea. • Drapery, traverse rods, 48” including hardware, (60) ea. The contractor shall fill and sand all screw holes once blinds and drapes are removed. • Air conditioner, 4-ton, split unit, (1) ea. for laundry room area. The contractor is responsible for removing and disposing of all refrigerants according to EPA guidelines. The contractor shall use certified recovery/recycling equipment and certified technician. • Shower curtains & rods, (30) ea. FURNISH AND INSTALL THE FOLLOWING : • Black out shades, interior, horizontal, 48” W X 84” H (60) ea. • Cove base, vinyl, 4”, approx. 160 L.F. Color to match existing. Manufacturer: Johnsonite • Air conditioner, 4-ton, split unit, wall mount, (1) ea. for laundry room area. To include tube / wiring kit (line sets). • Curtain rods, stainless steel, 5’ long (30) ea. • Shower curtains, vinyl, cloth (30) ea. • Urinal, wall hung, vitreous China (1) ea. The contractor shall install the necessary rough-in. To include supply, waste, vent lines and flushometer. REPAIRING WINDOW SCREENS: • Remove all window screens throughout the building. Remove mesh screening and install new mesh screening for all (110) windows in the building. -- 1 of 10 -- SCOPE OF WORK IJO# HAM1 DPW00004-6J Renovate common area Single Soldier UPH. Bldg.209 Page 2 of 10 SAW CUTTING & RE-POINTING MORTAR JOINTS: • Where required & directed perform saw cutting along designated lines to ¾” depth, to prepare the existing brick structure for re-pointing, approx. 1000 (VLF). • Execute re-pointing 1000 (VLF) using a mortar to ensure proper adhesion and a weather-tight seal. Surface Preparation, Painting and Finishes: • Skim coat wall surface with joint compound, approx. (3000) S.F. • Paint ceiling, complete, latex, including surface prep, primer & 2 coats finish color, approx. (350) S.F. Benjamin Moore: White • Paint doors & frames, complete, including surface prep, latex, primer & 2 coats finish color, (6) ea. • Paint walls, interior, drywall, or plaster, complete, latex, including surface patch / prep, prime (1) coat & 2 coats finish color, approx. (2650) S.F. Wall and door paint colors and finish to be selected by the building manager. Purchase and deliveries: • Water source heat pumps, 0.75 TON, (7) ea. Manufacturer: Bosch Model: CA009-1URC Voltage: 208 / 1 / 60 • Water source heat pumps, 1 TON, (1) ea. Manufacturer: Bosch Model: CA012-1URC Voltage: 208 / 1 / 60 Accessories: 1. R-454 Refrigerant 2. Unit rated at 400 PSIG waterside working pressure 3. Solid state temperature controller • Tactile touchpad for temperature, fan and mode adjustment • Digital & LED display • 5 minutes anti-short cycling delay • Random start • 90 second low pressure bypass timer prevents nuisance lockouts during cold weather start up • Brownout protection • Intelligent reset allows the unit to automatically restart after 5 minutes if a fault is no longer active • -- 2 of 10 -- SCOPE OF WORK IJO# HAM1 DPW00004-6J Renovate common area Single Soldier UPH. Bldg.209 Page 3 of 10 Purchase and deliveries: Accessories: 4. Low / high water temperature package • Externally equalized TXV’s • Wrapped condenser • CCM microprocessor control module 5. Cabinets and subbases 6. Unit mounted thermostat options with low voltage terminal strip 7. Slope top powder-coated cabinet with ½” dual density matte-faced fiberglass insulation 8. Dual Schrader ports 9. High pressure cutout 10. Low pressure cutout 11. 5-year compressor warranty, one year on parts Any perceived difference between this PWS and what the contractor interprets is to be resolved by the Contracting Officer or designated representative. -- 3 of 10 -- SCOPE OF WORK IJO# HAM1 DPW00004-6J Renovate common area Single Soldier UPH. Bldg.209 Page 4 of 10 3. GENERAL REQUIREMENTS: Contractor should provide a telephone number for a person to call should the need arise. Contractor shall fully adhere to and comply with the approved Safety & Health and Environmental plans, this project’s specifications (where applicable), NFPA, and the NEC. The Contractor shall comply with all Occupational Safety and Health (OSHA), Uniform Federal Accessibility, and environmental regulations and standards. All code compliance and requirement questions are to be coordinated with the Installation Safety Officer Mr. Paul Smaw who can be reached on 718- 630-4232. Contractor is responsible for scheduling a performance period with the building manager. The Government POC will also be notified. Contractor shall be responsible for all work performed & is responsible for reporting to the Government POC any dangerous or problematic conditions which they may uncover while executing this specification. All work shall be performed by experienced workers with proper tools, equipment, and in good workman like manner. Onsite inspection shall be performed prior to submittals, to verify measurements and field conditions. Contractor shall supply COR with cuts of significant materials to be installed, name and quality for government approval prior to installation. Contractor shall install dust partitions prior to the beginning of any work. It is the contractor’s responsibility to cover all furniture / equipment in the surrounding areas. If any excavation is needed during this work

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)