Repair Main Loading Dock - Eastern Regional Research Center

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
1232SA26Q0735
NAICS
236220
PSC
Z1JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 10, 2026
Response due
June 30, 2026
Place of performance
PA

What this opportunity is

The U.S. Department of Agriculture is seeking a contractor to perform repairs on the main loading dock at the Eastern Regional Research Center in Wyndmoor, PA. This project involves removing and replacing structural components, including a mechanical dock leveler, wall framing, and roofing. The opportunity is set aside for total small businesses, making it suitable for small contractors with expertise in construction and compliance with building codes and safety standards. Interested parties should note that this is a combined synopsis/solicitation, indicating they should track the notice for further details rather than submit immediate bids.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 US Department of Agriculture (USDA) USDA, ERRC Repair Main Building Loading Dock Safety Issues Statement of Work Contents Project ............................................................................................................................................................................ 2 General Information ....................................................................................................................................................... 2 1.0 Scope of Work ..................................................................................................................................................... 2 2.0 Background .......................................................................................................................................................... 2 Contractor Requirements................................................................................................................................................ 2 3.0 Technical Requirements / Tasks ........................................................................................................................... 2 4.0 Deliverables / Schedule ........................................................................................................................................ 3 -- 1 of 3 -- 2 Project USDA, Eastern Regional Research Center (ERRC), Wyndmoor, PA Small Truck Loading Dock Repairs General Information 1.0 Scope of Work The contractor shall furnish all labor, materials, equipment, tools, supervision, safety and disposal services necessary. All work must comply with applicable building codes, OSHA safety standards, and manufacturer installation requirements. 1. Remove an existing embedded 72in mechanical dock leveler and fill the pit with reinforced concrete 2. Replace 96 linear feet of exterior wall framing (track and metal studs) at 12 feet high 3. Install new aluminum siding over the rebuilt wall 4. Remove and replace approximately 780 square feet of corrugated metal roofing 1.1 Working hours ERRC working hours are 0730 – 1600. The facilities are closed on weekends and federal holidays. 2.0 Background The Eastern Regional Research Center (ERRC) is one of four Regional Research Centers of the Agricultural Research Service, U.S. Department of Agriculture. The ERRC is home to the nation’s leading scientists and engineers who solve problems facing the U.S. today and tomorrow with fundamental, applied, and developmental research on agricultural commodities. Most of this research is conducted in the main building within two laboratory wings. The original building was constructed in 1940. Due to continuous upgrades and renovations, ERRC is very modern with respect to laboratory design and system condition. Contractor Requirements 3.0 Technical Requirements 3.1 Dock Leveler Removal & Concrete Pit Fill 3.1.1 Demolition & Removal • Establish a safe work zone with barricades and signage. • Disconnect and remove all mechanical components of the dock leveler. • Cut rusted anchors, hinges, and frame components using torch or saw. • Use on-site forklift to extract the leveler from the pit. • Remove all steel, debris, and waste materials from the site. 3.1.2 Pit Preparation • Chip and remove loose or deteriorated concrete. • Clean pit walls and floor to ensure proper bonding. • Drill and epoxy rebar dowels into pit walls. • Install rebar reinforcement grid. • Install formwork at pit opening to match surrounding slab elevation. 3.1.3 Concrete Placement • Place approximately 2 cubic yards of 4,000–5,000 PSI concrete. • Consolidate concrete to eliminate voids. • Screed and finish surface flush with existing dock slab. • Apply curing compound. • Remove forms after curing. 3.2 Wall Framing Replacement 3.2.1 Demolition • Remove existing siding, damaged studs, and track. • Dispose of all debris. -- 2 of 3 -- 3 3.2.2 Installation • Install new bottom and top track along the full 96 ft length (allow for drainage of rain water). • Install metal studs at 16" on center. • Install bracing, blocking, and anchors as required. • Ensure wall is plumb, square, and structurally sound. 3.3 Corrugated Aluminum Siding Installation 3.3.1 Preparation • Install moisture barrier (if required). • Verify framing alignment and fastening points. 3.3.2 Installation • Install corrugated aluminum siding panels across the full 96 ft × 12 ft wall. • Install trim, flashing, and edge caps. • Seal all seams, penetrations, and terminations. • Ensure weather-tight installation. 3.4 Corrugated Roof Replacement 3.4.1 Removal • Remove existing corrugated roof panels and fasteners. • Inspect roof framing and report any structural issues. 3.4.2 Installation • Install new corrugated metal roofing panels. • Install ridge caps, side laps, and end laps with proper overlap. • Install new fasteners with neoprene washers. • Seal all seams and penetrations. • Ensure roof is fully weather-tight. 3.5 Cleanup & Finalization • Remove all debris, packaging, and waste materials. • Sweep and clean the work area. • Perform final walk-through and correct deficiencies. 4.0 Deliverables • The Contractor shall notify the USDA ARS ERRC representative when work is complete. • The Contractor shall do a final walk through with the Government Representee before acceptance. • The Contractor shall complete the Punch List before invoicing. -- 3 of 3 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)