Repair Network Switches - Facility 288, Vance AFB, Oklahoma
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
FP1024604
NAICS
238210
PSC
J059
Set-aside
No Set aside used
Posted
June 9, 2026
Response due
July 13, 2026
Place of performance
Enid, OK
What this opportunity is
The Department of Defense is seeking contractors to repair network switches at Vance Air Force Base, Oklahoma, under NAICS code 238210. This opportunity is open to all businesses as there is no set-aside for small businesses. The notice type is a Combined Synopsis/Solicitation, indicating that interested parties should track the opportunity closely for bidding instructions rather than submitting proposals immediately.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Design Percent Completion: 100%
May 1, 2026
Statement of Work
REPAIR NETWORK SWITCHES, F288
VANCE AIR FORCE BASE, OKLAHOMA
FACILITY PROJECT ID 1024604
PREPARED BY ZEB MCCOLLUM
-- 1 of 19 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1024604 Page 1 of 11 Repair Network Switches, F288
SoW Version 4.0
INDEX
PART 1 GENERAL ....................................................................................................................................... 2
1.01. PROJECT DESCRIPTION ..................................................................................................................... 2
1.02. INSTRUCTIONS TO BIDDERS ............................................................................................................. 2
1.03. LOCATION OF WORK ........................................................................................................................ 2
1.04. SCOPE OF WORK .............................................................................................................................. 2
1.05. CHANGES .......................................................................................................................................... 3
1.06. WARRANTY....................................................................................................................................... 3
1.07. SCHEDULE OF WORK ........................................................................................................................ 4
1.08. WORK RESTRICTIONS ....................................................................................................................... 4
1.09. CONTRACTOR’S REPRESENTATIVE ................................................................................................... 6
1.10. PROVIDED SERVICES AND UTILITIES ................................................................................................ 6
1.11. INSPECTION ...................................................................................................................................... 7
1.12. EXCESS MATERIALS (EXCLUDING HAZARDOUS MATERIALS OR WASTE) ......................................... 7
1.13. SPECIAL MATERIALS ......................................................................................................................... 7
1.14. MATERIALS ....................................................................................................................................... 8
PART 2 EXECUTION.................................................................................................................................... 9
2.01. SITE SAFETY REQUIREMENTS ........................................................................................................... 9
2.02. INSTALLATION .................................................................................................................................. 9
PART 3 SITE INFORMATION ..................................................................................................................... 10
PART 4 APPENDICES ................................................................................................................................ 11
4.01. APPENDIX A – SITE PHOTOS ........................................................................................................... 11
4.02. APPENDIX B – BID FORM................................................................................................................ 11
4.03. APPENDIX C – DRAWINGS .............................................................................................................. 11
-- 2 of 19 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1024604 Page 2 of 11 Repair Network Switches, F288
SoW Version 4.0
PART 1 GENERAL
1.01. PROJECT DESCRIPTION
A. The work covered under this Statement of Work shall consist of the following: Contractor
is to install new SFP switches. Uninterrupted power supplies shall be installed in line with
newly installed network switch. CPO controllers will be migrated to the new switch.
Existing switches are to be left in place until all buildings have been migrated to CPO
BACnet controllers.
1.02. INSTRUCTIONS TO BIDDERS
A. As part of the bid package the Contractor shall submit a completed copy of APPENDIX B –
BID FORM, along with all required documentation as stated in Sam.gov.
B. Owner reserves the right to reject any bid which does not completely satisfy the
Statement of Work.
1.03. LOCATION OF WORK
A. Location of work to be accomplished under this statement of work is at Vance Air Force
Base (AFB). Vance AFB is located three miles south of the City of Enid, Oklahoma. Facility
288 is located west of the intersection of Channel Street and Young Road.
1.04. SCOPE OF WORK
A. The Contractor shall furnish all supervision, labor, equipment, consumable materials,
supplies, tools, and other items to complete the construction as listed in the Scope of
Work. All quotes shall include all shipping charges for completion of the project. The
contractor will coordinate all work with ASRC Federal Construction Management prior to
execution. The list of items below are to be considered the general Scope of Work for the
project.
B. The Contractor shall field verify location of work, dimensions, and existing site conditions
prior to commencing work. The Contractor shall contact ASRC Construction Management
for any discrepancies with the Scope of Work.
C. Contractor is to install new SFP switches. Uninterrupted power supplies shall be installed
in line with newly installed network switch. CPO controllers will be migrated to the new
switch. Existing switches are to be left in place until all buildings have been migrated to
CPO BACnet controllers. Additional details are described below:
-- 3 of 19 --
400 Young Road
Vance AFB, OK 73705
580.213.7174
FP1024604 Page 3 of 11 Repair Network Switches, F288
SoW Version 4.0
1. INSTALL NEW:
a. SFP switch (Honeywell).…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238210)
NNMC Automatic Transfer Switch
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Presolicitation · due July 3, 2026
1230--Copy of Project# 561A4-26-507 Replace Fire Alarm Controls Annunciator
VETERANS AFFAIRS, DEPARTMENT OF · Sources Sought · due June 26, 2026
Kittyhawk Chapel Sound System, Projector, and AV Wiring Installation Service
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due June 29, 2026
1230--Project# 561A4-26-507 Replace Fire Alarm Controls Annunciator
VETERANS AFFAIRS, DEPARTMENT OF · Sources Sought · due April 1, 2026
Z--Rehab Power and Cooling Systems, Pinnalces NP
INTERIOR, DEPARTMENT OF THE · Solicitation · due June 23, 2026
841st Network Cabling Installation
DEPT OF DEFENSE · Solicitation · due June 10, 2026