Requirement for Terminal Instrument Procedures (TERPS)
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
HM047626R0055
NAICS
541511
PSC
DA10
Set-aside
No Set aside used
Posted
August 5, 2026
Response due
August 25, 2026
Place of performance
Springfield, VA
Description
UNCLASSIFIED
UNCLASSIFIED
PERFORMANCE WORK STATEMENT (PWS) For Terminal
Instrument Procedures (TERPS) Software
RFP#: HM047626R0055
Version 2.1
22 April 2026
-- 1 of 14 --
UNCLASSIFIED
2
TERPS PWS Version Change Tracker
Version No. Summary of PWS Changes
1.1 Initial Draft
1.2 Revised format and work statement at section 5.0 ‘Software Requirements’ to
include development phases. Other PWS sections added:
• Section 6 ‘Software Methodology and Delivery’
• Section 7 ‘Software Security’
• Section 8 ‘Program Management’
• Section 9 ‘508 Compliance’
• Section 11 ‘Standards and Quality Management Process’
1.3 Additional revision to areas referenced in version 2.0; also revised Table of Content
links and reformatting of section headers throughout the document.
1.4 Consolidated Phases to 3 Phases and revisions/edits to Sections 1, 2 and 3. Revised
document Version No. scheme to ‘1.X’
1.5 Updated through Section 5.1
1.6 Updated Section 4.2 to incorporate requirements for SWAP support.
1.7 Added FAA Tool reqmt to Sec. 2.0 Scope/Para 4
1.8 Consolidated Security Requirements into Section 4.2
1.9 Removed references to ‘GFP’ in Section 9.0 and CDRL documents.
2.0 Add RFP number HM047626R0055 to title page.
2.1 Added additional file ingest requirements to ‘Scope’ Section 2.0 capabilities: Shuttle
Radar Topography Mission (SRTM), TerraSAR-X add-on for Digital Elevation
Measurement (TanDEM-X)
-- 2 of 14 --
UNCLASSIFIED
3
Table of Contents
1.0 Introduction ..................................................................................................................................................................... 4
2.0 Scope.................................................................................................................................................................................. 4
3.0 General Requirements ................................................................................................................................................. 5
3.1 Place of Performance ............................................................................................................................................... 5
4.0 Requirements .................................................................................................................................................................. 5
4.1 TERPS Functional/Capability Requirements ..................................................................................................... 5
4.2 TERPS Integration/Deployment Requirements ............................................................................................... 7
4.3 Software Maintenance ............................................................................................................................................ 8
4.3.1 Corrective Maintenance ...................................................................................................................................... 8
4.3.2 Perfective Maintenance....................................................................................................................................... 8
4.3.3 Adaptive Maintenance ......................................................................................................................................... 9
5.0 Agile Methodology and "The NGA Software Way" ............................................................................................. 9
5.1 Agile Release and Sprit Cycle ................................................................................................................................. 9
5.1.2 Release Planning Events ...................................................................................................................................... 9
5.1.3 Sprint Planning Events........................................................................................................................................ 10
5.1.4 Sprint Review Event ............................................................................................................................................ 10
5.2 Backlog Management ............................................................................................................................................ 10
6.0 Program Management ............................................................................................................................................... 11
6.1 Program Management Review ........................................................................................................................... 11
7.0 Unclassified Work Performance Security Requirements ................................................................................ 11
8.0 Operational Security ................................................................................................................................................... 12
8.1 Information Handling ................................................................................................................................................. 12
9.0 Government Furnished Information (GFI) ........................................................................................................... 12
10.0 Data Rights................................................................................................................................................................... 13
11.0 List of Applicable Documents ................................................................................................................................ 13
12.0 Contract Deliverable Requirements List (CDRLs) ............................................................................................ 13
-- 3 of 14 --
UNCLASSIFIED
4
1.0 Introduction
The National Geospatial-Intelligence Agency's (NGA) Source Foundation Aeronautical Navigation Office
(SFA) has a worldwide requirement to provide time sensitive Safety of Navigation (SoN) Aeron…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 541511)
NISC Enterprise Support Tasking (NEST)
TRANSPORTATION, DEPARTMENT OF · Solicitation · due October 15, 2026
Inventory Management Software
DEPT OF DEFENSE · Solicitation · due August 26, 2026
Services to Support Update & Development of Enhancements to National Navigation Operation & Management Performance Evaluation & Assessment System (NNOMPEAS) FY 2026-2027
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due September 3, 2026
D--SPECIAL NOTICE OF INTENT TO AWARD TO A SOLE SOURCE
INTERIOR, DEPARTMENT OF THE · Special Notice · due September 2, 2026
Request for Solutions (RFS): Autonomous Coding (AC) and Automated Appeals & Denials Management (ADM)
DEPT OF DEFENSE · Solicitation · due August 28, 2026
Inventory Management Software
DEPT OF DEFENSE · Solicitation · due August 26, 2026