Description
1
STINFO
SOO # 17105-26-001
21 April 2026
Statement of Objectives (SOO)
AEDC-Arnold AFB: High Pressure Air Storage Expansion
DISTRIBUTION A: Approved for public release: distribution is unlimited.
IRA-26-1525
1. Program Objectives
The objective of this effort is to provide additional high pressure air (HPA) storage capacity for
the Arnold Engineering Development Complex (AEDC) at Arnold AFB, TN. This will be
accomplished by the installation of two new HPA storage systems, consisting of storage vessels,
piping, valves, equipment, instrumentation, foundations, support structures, and platforms. The
project also includes all utilities, equipment, and controls required to support the new storage
systems. The minimum success criteria for the storage systems are described in Attachment 1 –
Performance Parameters.
2. Contract Objectives
At a minimum, the contract shall define the following:
2.1. Work to-be Performed:
Provide specific, performance-based, quantitative terms of the work to-be-done, in the form
of a Statement of Work (SOW), to satisfy the performance requirements established in
Attachment 1 – Performance Parameters. The SOW shall clearly identify and describe, in
detail, all design, procurement, fabrication, installation, inspection, testing, and checkout
activities required to provide fully functional HPA storage systems.
2.2. Milestones:
Planned, significant events shall be identified in the SOW, including a schedule identifying
when each will occur. Milestones shall include, at a minimum, the following:
Project Kickoff Meeting
Contractor Readiness Review *
Preliminary Design Review *
Storage Vessel Specification Approval
Storage Vessel / Long Lead Item Procurement
Intermediate Design Review *
Critical Design Review *
Final Design Review *
Receipt of Storage Vessels and Long Lead Items
Verification Readiness Review *
On-Site System Orientation / Training
* See Appendix B in Attachment 1 – Performance Parameters for specific expectations
regarding these design reviews.
-- 1 of 4 --
2
STINFO
SOO # 17105-26-001
21 April 2026
Statement of Objectives (SOO)
AEDC-Arnold AFB: High Pressure Air Storage Expansion
DISTRIBUTION A: Approved for public release: distribution is unlimited.
IRA-26-1525
2.3. Data Deliverables.
Tangible or intangible data items produced as a result of the work performed shall be
identified in the SOW, as well as their anticipated delivery date, method of delivery, format,
and quantity.
Data Deliverables for this effort shall include, at a minimum, all documentation identified in
Appendix B in Attachment 1 – Performance Parameters, including the following:
Statement of Work
Site Plan
Mechanical, Structural, Electrical, and Controls Operational Drawings (P&IDs,
Schematics, Line Diagrams, or Wiring Diagrams)
Mechanical, Structural, Electrical, and Controls Fabrication and Installation Drawings
Mechanical, Structural, and Electrical Analysis Reports
Equipment Specifications for Major Equipment (e.g. Storage Vessels)
Hazard Tracking Log
Project Risk Assessment
Permits
Demolition Plan
Manufacturing Plan
Installation Plan
Concept of Operations
Failure Modes and Effects Analysis (FMEA)
Verification, Validation, and Acceptance Plan
System Test Plan
Non-Destructive Examination Results (e.g. Weld Inspections and Leak Tests)
Electrical Testing Results (e.g. Resistance and Continuity Tests)
Pressure Test Results
Training Materials and Documentation
User Manuals or Vendor-Supplied Maintenance Documentation
-- 2 of 4 --
3
STINFO
SOO # 17105-26-001
21 April 2026
Statement of Objectives (SOO)
AEDC-Arnold AFB: High Pressure Air Storage Expansion
DISTRIBUTION A: Approved for public release: distribution is unlimited.
IRA-26-1525
2.4. Data Rights:
The Government shall receive Unlimited Data Rights to all Contractor-Provided technical
data, analysis, drawings, software, code, and programming produced in performance of this
effort. Following approval by the Government, all drawings, analysis reports,
documentation, and source code developed for this project shall be provide to and become
the property of AEDC. Drawings shall be provided in a native file format compatible with
AutoCAD. All source code shall be provided in the native file format. Drawings and
analysis reports shall not be marked proprietary of otherwise restricted.
2.5. Training:
The Government shall receive on-site orientation and training for all new equipment or
systems. Training will be recorded by the Government for future use.
3. Quality Control Plan (QCP):
The contract shall define the development and maintenance of a quality control plan to ensure the
requirements established within this Statement of Objectives, including all attachments, are met in
accordance with the SOW. This shall include the development and implementation of
procedures to meet milestones and to ensure appropriate corrective action is taken when
milestones are not met.
4. Program Management Objective:
Allow offerors the maximum flexibility to innovatively manage schedule, performance, risks,
warranties, subcontracts, and data so that it satisfies the user’s performance requirements (see
Attachment 1 – Performance Parameters). Clear government visibility into the schedule,
performance, and risks shall be maintained.
-- 3 of 4 --
4
STINFO
SOO # 17105-26-001
21 April 2026
Statement of Objectives (SOO)
AEDC-Arnold AFB: High Pressure Air Storage Expansion
DISTRIBUTION A: Approved for public release: distribution is unlimited.
IRA-26-1525
Attachments:
1. Attachment 1 – Performance Parameters (Distribution D)
a. Appendix A – Reference Drawings (Distribution D)
b. Appendix B – Design Review Expectations (Distribution A)
c. Appendix C – AEDC Standards (Not Sensitive)
d. Appendix D – Road Load Limits (Distribution D)
e. Appendix E – Installation Locations (Distribution D)
f. Appendix F – Concept Information (Distribution D)
g. Appendix G – Ve…