Sauna Control Panels
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
FA462026QA252
NAICS
335210
PSC
4520
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
July 1, 2026
Response due
July 8, 2026
Place of performance
Fairchild AFB, WA
What this opportunity is
The Department of Defense is buying sauna control panels and units for the Fairchild AFB Fitness & Sports Center in Washington. This total small business set-aside suits small businesses with a NAICS code of 335210. As a combined synopsis/solicitation, small businesses should track this opportunity closely to prepare for a potential bid.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK
FITNESS CENTER SAUNA UNITS AND CONTROL PANELS
12 February 2025
1. DESCRIPTION OF SERVICES: The contractor shall remove and replace existing outdated sauna
heating units and control panels and install new sauna units and control panels in the men’s and
women’s locker rooms located in the Fairchild AFB Fitness & Sports Center, building 2379, 300 W.
Castle Street, Fairchild AFB WA 99011. The contractor or subcontractor providing the service must be
certified in or have completed training for the work being conducted.
2. SCOPE OF WORK DEFINED: Remove and replace/install two (2) sauna units and control panels
and necessary accessories and wiring required to operate both saunas. Units must meet or exceed the
technical specifications of the current heater units and control panels and be sufficient for the space and
configuration requirements for the sauna rooms.
2.1. Current equipment technical specifications:
Men’s: 14.4KW and 208-volt heater unit, Finnleo Tech Time Control Panel
Women’s: 12.0KW and 208-volt heater unit, Finnleo Tech Time Control Panel
2.2. The contractor shall furnish all labor, transportation, tools, materials, and associated equipment for
on-site removal and installation of the new units in accordance with this SOW.
2.3. Work products and materials used should reduce the environmental damages associated with this
SOW by considering the specification of environmentally preferable products and services to the extent
feasible, consistent with price, performance, availability, and safety considerations. If and where
available, products with recycled or bio-based content as well as other environmentally preferable
attributes such as reduced packaging, durability and repair ability, reduced toxicity, conservation of
natural resources, water conservation, Low Volatile Organic Compound (VOC) Content, and asbestos
alternatives are preferred.
2.4. Contractor shall remove all materials and debris and maintain clean and orderly work ares.
2.5. The contractor shall immediately notify the Fairchild AFB Contracting Office for any questions,
unforeseen site conditions, or conditions that may require further clarification or potential changes in
scope.
2.6. Contractor shall perform duties as are necessary for proper control, issue, and disposal of hazardous
and non-hazardous chemicals or materials in accordance with all federal, state, and local laws.
3. CERTIFICATION. Contractor shall provide only certified and competent service technicians to
perform any work in accordance with the best commercial practices, manufacture’s guidelines and
equipment specifications.
4. CONTINUATION OF MISSION ESSENTIAL FUNCTIONS. IAW DoDI 1100.22 (Policy and
Procedures for Determining Workforce Mix), and any applicable Air Force implementation, unless
otherwise directed by an authorized Government representative, it is determined that services provided
under this contract are not mission essential for performance during a crisis.
5. GENERAL INFORMATION
3.1. Hours of Operation: Normal hours of operation are Monday-Friday, 5:00 a.m – 8:00 p.m.,
& Saturday-Sunday, 7:00 a.m. – 2:30 p.m., excluding federal holidays. The following federal
FA462026QA252
Attachment 1 – Statement of Work
-- 1 of 4 --
holidays are observed:
FEDERAL HOLIDAYS PASS DAY
1 Jan 26 (Thursday)
16 Feb (Monday)
26 May (Monday)
4 Jul (Friday)
7 Sep (Monday)
11 Nov (Wednesday)
26 Nov (Thursday)
25 Dec (Friday)
1 Jan 27 (Friday)
New Year’s Day
Presidents’ Day
Memorial Day
Independence Day
Labor Day
Veterans Day
Thanksgiving Day
Christmas Day
New Year’s Day
1 Jan 26 (Friday)
13 Feb (Friday)
22 May (Friday)
2 Jul (Thursday)
4 Sep (Friday)
12 Nov (Thursday)
27 Nov (Friday)
24 Dec (Thursday)
31 Dec (Thursday)
FA462026QA252
Attachment 1 – Statement of Work
-- 2 of 4 --
Appendix A: Existing Unit and Controller Photos (Men's)
Existing Heating Unit, Front View
Existing Heating Unit, Back View
FA462026QA252
Attachment 1 – Statement of Work
-- 3 of 4 --
Existing Heating Unit, Front View, Top
Existing Controller, Mounted Outside Sauna
(Damaged)
FA462026QA252
Attachment 1 – Statement of Work
-- 4 of 4 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗