SNRA Window & Door Replacement Project
AGRICULTURE, DEPARTMENT OF
Notice type
Combined Synopsis/Solicitation
Solicitation #
1240LT26Q0050
NAICS
236220
PSC
Z2AZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
May 19, 2026
Response due
June 12, 2026
Place of performance
Stanley, ID
What this opportunity is
The Department of Agriculture is seeking a contractor for the Window and Door Replacement Project at the Sawtooth National Recreation Area in Idaho, classified under NAICS 236220. This opportunity is a Total Small Business Set-Aside, making it suitable for small businesses. The notice type is a Combined Synopsis/Solicitation, indicating that interested firms should track the opportunity closely for submission details rather than simply bidding.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PROJECT LOCATION VICINITY MAP
(STANLEY ADMIN SITE)
SHEET OF
United States Department of Agriculture
Forest Service
1
INDEX OF SHEETS
SHEET SHEET TITLE DATE
01 COVER SHEET 1/27/2026
02
2
RECOMMENDED BY:
STAFF ENGINEER
FOREST ENGINEER
DATE
(R04) INTERMOUNTAIN REGION
SAWTOOTH NATIONAL FOREST
CUSTER COUNTY & BLAINE COUNTY
IDAHO
SAWTOOTH NRA ADMIN SITE WINDOW & DOOR REPLACEMENTS
Braidy K. Richins, PE 1/27/2026
DATE
STANLEY RANGER STATION
Shawn Robnett, PE
WINDOW & DOOR REPLACEMENT
SCHEDULE
STANLEY ADMIN SITE
HOUSING UNIT AREA
1/27/2026
VICINITY MAP
(NORTH FORK ADMIN SITE)
SAWTOOTH NRA HQ BUILDING
CARETAKER'S HOUSE
NORTH FORK WAREHOUSE
1/27/2026
-- 1 of 2 --
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO. DATE
PROJECT NO.
DRAWING SHEET NO.
DATE NO.
4
2
3
REVISION / ISSUE
1
OF SHEET
United States Department of Agriculture
Forest Service
C:\USERS\BKRICHINS\ONEDRIVE - USDA\DOCUMENTS\RICHINSFILES\PROJECTS\2026 PROJECTS\SAWTOOTHNRAADMINSITEWINDOWDOORREPLACEMENT2026\DWG\STANLEYWINDOWDOOR_BASE.DWG
(R04)
INTERMOUNTAIN REGION
SAWTOOTH NRA
ADMIN SITE
WINDOW & DOOR
REPLACEMENTS
SAWTOOTH
NATIONAL FOREST
SAWTOOTH NATIONAL
RECREATION AREA
WINDOW & DOOR
REPLACEMENT
SCHEDULE
1/27/2026
B.RICHINS
B.RICHINS
S.ROBNETT
-
2
2 2
STANLEY ADMINISTRATIVE SITE
BUILDING LOCATION - PLAN
HOUSING UNIT #1
STATE HIGHWAY 75
TO STANLEY
GENERAL NOTES:
1. ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE INCLUDED SUPPLEMENTAL "CSI SPECIFICATIONS" AS MODIFIED FOR THIS PROJECT.
2. ALL MATERIALS AND WORK ARE SUBJECT TO INSPECTION AND APPROVAL BY UNITED STATES FOREST SERVICE PERSONNEL. THE INSPECTOR, INCLUDING
CONTRACTING OFFICER (CO), CONTRACTING OFFICER'S REPRESENTATIVE (COR), OR OTHER APPROVED PERSONNEL, SHALL, AT ALL TIMES, HAVE ACCESS TO
THE WORK FOR THE PURPOSE OF INSPECTION AND TESTING, AND THE CONTRACTOR SHALL PREPARE FACILITIES FOR SUCH ACCESS AND SUCH INSPECTION
AND TESTING, AS APPLICABLE.
3. CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEBRIS FROM EACH RESPECTIVE BUILDING SITE AND DISPOSE OF OFF-FOREST AT A LANDFILL OR OTHER
APPROVED DISPOSAL LOCATION. EXISTING STORM DOORS SHALL BE PROTECTED WHERE PRESENT. REMOVAL AND REINSTALLATION MAY BE REQUIRED.
4. WINDOW / DOOR DIMENSIONS NOTED ARE APPROXIMATE. CONTRACTOR SHALL VERIFY ON-THE-GROUND ALL DIMENSIONS AND CONFIGURATIONS, AND SUBMIT
DETAILED LIST TO CONTRACTING OFFICER FOR REVIEW/APPROVAL PRIOR TO FABRICATION.
5. EXTERIOR ENTRY DOORS SHALL BE 2-PANEL SQUARE TYPE AND HAVE TWO BORE HOLES TO ACCOMMODATE LATCH HANDLE AND DEADBOLT. EXISTING PANEL
HANDLE SETS SHALL BE SALVAGED AND REINSTALLED ON NEW DOORS.
6. BATHROOM WINDOWS SHALL BE OBSCURED FOR PRIVACY.
7. ALL WINDOWS SHALL BE SLIDING STYLE HAVING SCREENS UNLESS DENOTED OTHERWISE. WINDOWS SHALL BE TEMPERED WHERE RECOMMENDED BY
SUPPLIER. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
8. ANY REMOVED/REPLACED TRIM / FASCIA SHALL BE PAINTED TO MATCH EXISTING INTERIOR OR EXTERIOR AS APPLICABLE.
9. CONTRACTOR SHALL MINIMIZE DAMAGE TO EACH RESPECTIVE BUILDING. ANY/ALL DAMAGE SHALL BE RESTORED TO PRE-CONSTRUCTION CONDITIONS OR
BETTER BY THE CONTRACTOR AT NO COST TO THE FOREST SERVICE.
HOUSING UNIT #3
HOUSING UNIT #5
HOUSING UNIT #6
HOUSING UNIT #7
HOUSING UNIT #8
HOUSING UNIT #11 STANLEY WAREHOUSE
STANLEY RANGER STATION
NORTHING: 44.177343°±
EASTING: -114.925339°±
HOUSING UNIT #4
HOUSING UNIT #2
HOUSING UNIT #12
HOUSING UNIT #10
HOUSING UNIT #9
TO KETCHUM
HOUSING UNIT #1
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
D1 36 80
SD1 71 80
SAWTOOTH NRA HQ BUILDING
NORTHING: 43.787416°±
EASTING: -114.421265°±
CARETAKER'S HOUSE
NORTH FORK
WAREHOUSE
NORTH FORK
HELITACK
BUILDING
NORTH FORK ADMINISTRATIVE SITE
BUILDING LOCATION - PLAN
TO KETCHUM
TO STANLEY
HOUSING UNIT #6
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
W1 45 46
W2 35 35
W3 70 35
W4 35 23
W5 70 46
W6 70 46
W7 47 58
W8 48 42
W9 48 42
W10 70 46
D1 34 80
D2 36 80
D3 36 80
D4 36 80
HOUSING UNIT #7
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
W1 (P) 96 60
W2 58 48
W3 36 36
W4 36 36
W5 24 24
W6 59 48
W7 36 48
W8 36 48
D1 32 80
D2 (G) 36 80
HOUSING UNIT #8
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
W1 45 46
W2 35 35
W3 70 35
W4 35 23
W5 70 46
W6 70 46
W7 47 58
W8 47 58
W9 48 42
W10 48 42
D1 36 80
D2 36 80
D3 36 80
CARETAKER'S HOUSE
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
W1 45 46
W2 35 35
W3 35 35
W4 70 35
W5 70 46
W6 70 46
W7 47 58
W8 47 58
W9 47 58
W10 47 58
HOUSING UNIT #12
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
W1 72 36
W2 72 48
W3 48 48
W4 48 48
W5 48 48
W6 48 48
W7 36 36
W8 (P) 96 48
D1 36 80
D2 36 80 STATE HIGHWAY 75
FOREST ROAD 146
FOREST ROAD 433
HOUSING UNIT #2
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
D1 36 80
SD1 71 80
G1 112 84
HOUSING UNIT #4
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
D1 36 80
D2 36 80
SD1 71 80
HOUSING UNIT #5
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
D1 (G) 36 80
D2 (G) 36 80
D3 (G) 36 80
G1 108 90
W# = WINDOW
W# (P) = PICTURE WINDOW, NON OPENING
D# = EXTERIOR ENTRY DOOR
D# (G) = EXTERIOR ENTRY DOOR W/ GLASS
SD# = SLIDING GLASS PATIO DOOR
G# = GARAGE DOOR
NF WAREHOUSE
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
W1 35 23
W2 35 23
W3 35 23
W4 35 23
W5 35 23
W6 35 23
W7 35 23
W8 35 23
W9 35 23
W10 35 23
W11 35 23
W12 35 23
W13 35 23
HOUSING UNIT #3
WINDOW /
DOOR NO.
WIDTH
(INCHES)
HEIGHT
(INCHES)
SD1 71 80
-- 2 of 2 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
BLDG 31B New Roofing Below Grade Structure
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Solicitation · due June 26, 2026
Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB Texas
DEPT OF DEFENSE · Special Notice
Repair BEQ HP135
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 16, 2026
P-1458 2nd Radio Battalion Complex, Phase 2, Parachute and Supply Facilities
DEPT OF DEFENSE · Solicitation · due May 28, 2025
Orrin Hatch U.S. Courthouse LED Lighting Upgrade
GENERAL SERVICES ADMINISTRATION · Solicitation · due July 9, 2026
Z1DA--Correct Martinez and Mare Island Generator Fuel Lines
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due June 24, 2026