The Department of Commerce is seeking sources for two types of ultrafast fiber lasers: one operating at 780 nm and another at 1560 nm, each requiring specific performance characteristics for synchronization with RF and optical references. This opportunity is suitable for small businesses under NAICS 334516, which covers analytical laboratory instruments. As a Sources Sought notice, it primarily aims to gather information on potential suppliers rather than solicit bids, so interested businesses should focus on tracking the opportunity rather than preparing immediate proposals.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Requirements / Specification Document
TITLE: Frequency Comb Lasers
Requesting Laboratory / Division / Group:
Communications Technology Laboratory
Radio Frequency Technology Division
Guided Wave Electromagnetics (Group (672.01)
General Statement of Need:
The National Institute of Standards and Technology (NIST)/Communications Technology
Laboratory (CTL) needs to synchronize ultrafast fiber lasers to external RF and optical
references for RF generation and detection up to >300 GHz. These lasers must have fast
repetition rate control, carrier envelope offset frequency control, and high power output at
1560 nm and 780 nm wavelengths.
Item Specifications and Quantities:
Item 1: 780 nm Ultrafast Fiber Laser
Quantity: 1 EACH
Specifications: 1.1 100.000000 MHz repetition rate within tuning range
1.2 1560 nm oscillator center wavelength
1.3 1 MHz repetition rate tuning range using fast piezo cavity
length tuning with low-noise slow locking mechanism
(temperature or motor) for long term (>72 hour) phase
locking
1.4 Free space output selectable between 780 nm <100 fs pulses
with >250 mW average power OR 1560 nm <100 fs pulses
with >500 mW average power
1.5 Continuously variable output power split ratio between 780
nm and 1560 nm outputs described in 1.4
1.6 >=3 auxiliary PM fiber outputs at 1560 nm with >1 mW
average power
1.7 Electro-optic actuator inside oscillator for locking with
ultrastable optical reference lasers
1.8 Active temperature stabilization of laser oscillator
1.9 100/115/230 VAC operation with <500 W AC power
consumption Draft
-- 1 of 8 --
Requirements / Specification Document
1.10 New equipment with performance checked by the
manufacturer before shipment
Item 2: 1560 nm Ultrafast Fiber Laser
Quantity: 1 EACH
Specifications: 2.1 100.000000 MHz repetition rate within tuning range
2.2 1560 nm oscillator center wavelength
2.3 1 MHz repetition rate tuning range using fast piezo cavity
length tuning with low-noise slow locking mechanism
(temperature or motor) for long term (>72 hour) phase
locking
2.4 Free space output of 1560 nm <100 fs pulses with >500 mW
average power
2.5 >=3 auxiliary PM fiber outputs at 1560 nm with >1 mW
average power
2.6 Electro-optic actuator inside oscillator for locking with
ultrastable optical reference lasers
2.7 Active temperature stabilization of laser oscillator
2.8 100/115/230 VAC operation with <500 W AC power
consumption
2.9 New equipment with performance checked by the
manufacturer before shipment
Vendor Requirements
1. Possess at time of award/contracting an Export Control Classification Number (ECCN).
2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which
registration is listed as “Active” on the GSA System for Award Management (SAM.gov).
Procurement Support Information and Ancillary Services:
[Provide input for each section Below or Mark Not Applicable (N/A)]
Section Requirements/Specifications
Planning
Considerations
☒ N/A
☐ List any visits required to allow potential vendors to see site
specific constraints.
[Explain Requirements.]Draft
-- 2 of 8 --
Requirements / Specification Document
☐ US citizen required on-site (foreign nationals require pre-
registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping &
Delivery
☐ N/A
Shipping Address:
☒ NIST-Boulder
ATTN: Nate Orloff
Mail Stop: 672.01
325 Broadway
Boulder, CO 80305
☐ NIST-Gaithersburg
ATTN:
Mail Stop:
100 Bureau Dr
Gaithersburg MD 20899
☐ [Alternate Shipping Address]
Shipping Criteria:
☐ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.]
☐ Direct Delivery to OU Building Required
[Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number]
☐ Building has Loading Dock
Containerization Preference: [Enter Container Type]
Other Requirements:
[List Any Other Requirement]
Delivery Date Criteria:
☒ Delivery Shall Be Competed No Later Than:
1/1/2027
☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due DateDraft
-- 3 of 8 --
Requirements / Specification Document
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media
☒ N/A
[Enter Electronic Media Requirements by Item.]
☐ Software
☐ Electronic Manuals
☐ License Key
☐ Other:
[List Any Other Electronic Media Requirements]
☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation
☒ N/A
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site
☐ Rigging
☐ Uncrating / Unpackaging
☐ Removal of Packaging Material
☐ Equipment Set Up
☐ Start-Up Services
☐ Turnkey Installation
☐ Other:
[Enter Details]
NOTE: TPOC shall be the coordination POC.
Facility / Utility
Considerations
☒ N/A
[List Site Specific Utility Considerations by Item]
☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power AvailableDraft
-- 4 of 8 --
Requirements / Specification Document
Voltage: [Enter voltage] (V)
Maximum Current: [Enter max current draw] (A)
Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz)
NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P)
Environment: [Choose Environment]
Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and
Acceptance
☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)]
☐ On-Site
☒ Acceptance Not Expected to Exceed 7 Business Days
☐ Acceptance Expected to Exceed 7 Business Days:
[Duration]
☐ Inspection and Acceptance Plan:
[Explanation]
☐ Other:
[Enter Other Requirements]
Training
☒ N/A
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees]
☐ On-Site
☐ Off-Site Location: [Enter Location(s)…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.