Description
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
CIVIL ENGINEERING UNIT OAKLAND
OAKLAND, CALIFORNIA 94612-5337
PSN 20041934
SPECIFICATIONS
FOR
REPLACE AND REPAIR ATON IN COLUMBIA RIVER
FOR
CG AIDS TO NAVIGATION TEAM ASTORIA
Civil Engineering Unit Oakland Initial
LTJG Benjamin Acebo
PROJECT MANAGER
Joel Tomco
Regional Execution Design-B
Steven F. Osgood
TECHNICAL DIRECTOR
ACEBO.BENJAMIN.G
EOFFREY
JAYDEN.154719598
8
Digitally signed by
ACEBO.BENJAMIN.GEOFF
REY JAYDEN.1547195988
Date: 2026.03.31
10:39:56 -07'00'
TOMCO.JOEL.E
DWARD.13849
08795
Digitally signed by
TOMCO.JOEL.EDWARD.1
384908795
Date: 2026.04.03 10:15:19
-07'00'
2026.04.08
11:09:09 -07'00'
-- 1 of 70 --
TABLE OF CONTENTS
SECTION TITLE PAGE
DIVISION 01 - GENERAL REQUIREMENTS 1
SECTION 01 10 00 - GENERAL PARAGRAPHS 1
SECTION 01 33 00 - SUBMITTALS 17
SECTION 01 35 29 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION 23
SECTION 01 71 23 – FIELD ENGINEERING 40
DIVISION 02 – EXISTING CONDITIONS 45
02 41 13 – MINOR SITE DEMOLITION 45
DIVISION 05 – METALS 48
SECTION 05 50 00 – METAL FABRICATIONS 48
SECTION 05 51 33 – METAL LADDERS 52
DIVISION 09 – FINISHES 53
09 97 18 –PILE CORROSION COATING 53
DIVISION 10 - SPECIALTIES 58
10 81 13 – BIRD CONTROL DEVICES 58
DIVISION 31 - EARTHWORK 60
SECTION 31 62 16 – STEEL PILES 60
APPENDIX A: ATON STRUCTURE LIST 64
APPENDIX B: ATON STRUCTURE PHOTOS AND LOCATIONS 65
APPENDIX C: SUBMITTAL APPROVAL FORM 66
APPENDIX D: USCG MARINE MAMMAL MONITORING PLAN (MMMP) 67
APPENDIX E: SAMPLE GEODETIC SURVEY 68
-- 2 of 70 --
20041934 Page 1
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 00 - GENERAL PARAGRAPHS
PART 1 GENERAL
1.01 PROJECT REQUIREMENTS:
A. Provide all materials (excluding Government Furnished
Material), labor, equipment and transportation required
to accomplish work installing, replacing, or removing
ATON structures in the Columbia River Area. Bidders
shall hold pricing for 120 days after close of bidding
period. Work includes, but is not limited to:
1. Standard ATON Maintenance work which includes
removals, replacements, and repairs of damaged ATON
structures. See appendix A, appendix B, and this
specification for scope requirements.
2. ATON structure fabrication.
3. Surveying of completed range structures to ensure
proper positioning.
1.02 CONTRACT SCHEDULE:
A. Structures will be constructed within in-water work
window limitations. The in water work windows applicable
to this project are as follows:
1. Columbia River: 01 November – 28 February
1.03 BASE BID ITEMS: The following items comprise the base bid
of this project. Specific details of the base bid items
are detailed in Appendix A and Appendix B.
The following ten (10) items make up BASE CLIN 0001:
A. Stevenson Lower RR LT (LLNR 11830): Demolish & replace w/
epoxy coated 4-pile 10x10 platform with 7x7 tower.
Install dayboards, light, safety climbing device, and
ladder components in accordance with drawings 6-1, 6-2,
6-3, 8-1, 8-2, 8-3, 8-4, 8-5, 8-6, 8-7, 8-8, 12-3, 12-4,
14-1, 11-1.
B. Bonneville Pool LT 22 (LLNR 11855): Demolish & replace w/
-- 3 of 70 --
20041934 Page 2
epoxy coated MPS w/ 5x5 basket. Install dayboards, light,
and ladder components in accordance with drawings 03-1,
11-1, 13-1, 9-2.
C. Bonneville Pool LT 23 (LLNR 11860): Demolish & replace w/
epoxy coated MPS w/ reduced header. May be moved within a
30 ft radius of original position. Install dayboards,
light, and ladder components in accordance with drawings
3-1, 11-1, 13-1, 9-1.
CI. Wind Mountain Upper RF LT 26 (LLNR 11870): Demolish &
replace w/ epoxy coated 4-pile 10x10 platform with 7x7
tower. Install dayboards, light, and ladder components in
accordance with drawings 6-1, 6-2, 6-3, 8-1, 8-2, 8-3,
8-4, 8-5, 8-6, 8-7, 8-8, 12-3, 12-4, 14-1, 11-1.
CII. Wind Mountain Upper RR LT (LLNR 11875): Demolish &
replace w/ epoxy coated 4-pile 10x10 platform with 7x7
tower. Install dayboards, light, safety climbing device,
and ladder components in accordance with drawings 6-1,
6-2, 6-3, 8-1, 8-2, 8-3, 8-4, 8-5, 8-6, 8-7, 8-8, 12-3,
12-4, 14-1, 11-1.
CIII. Fashion Reef Lower RF LT (LLNR 11630): Demolish & replace
w/ epoxy coated MPS w/ 7x7 basket. Install dayboards,
light, and ladder components in accordance with drawings
4-1, 11-1, 13-1, 12-1, 12-2, 9-3, 14-1.
CIV. Fashion Reef Lower RR LT (LLNR 11635): Demolish & replace
w/ epoxy coated 4-pile 10x10 platform with 30ft 7x7
tower. Install dayboards, light, and ladder components in
accordance with drawings 6-1, 6-2, 6-3, 8-1, 8-2, 8-3,
8-4, 8-5, 8-6, 8-7, 8-8, 12-3, 12-4, 14-1, 11-1.
CV. Cascade Rapids Upper RF LT 15 (LLNR 11805): Demolish &
replace w/ epoxy coated MPS w/ 7x7 basket. Install
dayboards, light, and ladder components in accordance
with drawings 04-1, 11-1, 13-1, 12-1, 12-2, 9-3, 14-1.
CVI. Elochoman DBN 1 (LLNR 10535): Remove buoy system and
replace with epoxy coated SPS w/ reduced header system.
Install dayboards, light, and ladder components in
accordance with drawings 03-1, 11-1, 13-1, 9-1, 14-1.
CVII. Elochoman DBN 2 (LLNR 10540): Demolish & replace with
epoxy coated SPS w/ reduced header. Install dayboards,
light, and ladder components in accordance with drawings
1-1, 11-1, 13-1, 9-1, 14-1.
-- 4 of 70 --
20041934 Page 3
The following ten (10) items make up BASE CLIN 0002:
K. Cathlamet North DBN 4 (LLNR 14750): Remove buoy system
and replace with epoxy coated SPS w/ reduced header
system. Install dayboards, light, and ladder components
in accordance with drawings 01-1, 11-1, 13-1, 9-1.
L. Chinook Channel Light 1 (LLNR 14520): Demolish & replace
with new epoxy coated MPS w/ reduced header . Install
dayboards, light, and ladder components in accordance
with drawings 03-1, 11-1, 13-1, 9-1. Conduct Eel grass
survey prior to construction in accordance with section
1.14.
M. Chinook Channel Light 2 (LLNR 14525): Demolish & replace
with epoxy coated SPS w/ reduced header. Install
dayboards, light, and ladder components in accordance
with drawings 01-1, 11-1, 13-…