SOURCES SOUGHT NOTICE to identify firms capable of performing ATON Repair & Replace Work at Base Tongue Point/Columbia River, Astoria, OR

HOMELAND SECURITY, DEPARTMENT OF

Notice type
Sources Sought
Solicitation #
70Z08826B0000123
NAICS
237990
PSC
Z2EB
Set-aside
No Set aside used
Posted
June 4, 2026
Response due
June 11, 2026
Place of performance
Astoria, OR

What this opportunity is

The Department of Homeland Security is seeking firms capable of performing repair and replacement work for Aids to Navigation (ATON) structures in the Columbia River area, specifically at Tongue Point, Astoria, OR. This opportunity is not set aside for small businesses, making it open to all qualified contractors under NAICS 237990. Interested firms should note that this is a Sources Sought notice, indicating a focus on gathering information rather than soliciting bids at this stage, which may require tracking for future solicitations.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD CIVIL ENGINEERING UNIT OAKLAND OAKLAND, CALIFORNIA 94612-5337 PSN 20041934 SPECIFICATIONS FOR REPLACE AND REPAIR ATON IN COLUMBIA RIVER FOR CG AIDS TO NAVIGATION TEAM ASTORIA Civil Engineering Unit Oakland Initial LTJG Benjamin Acebo PROJECT MANAGER Joel Tomco Regional Execution Design-B Steven F. Osgood TECHNICAL DIRECTOR ACEBO.BENJAMIN.G EOFFREY JAYDEN.154719598 8 Digitally signed by ACEBO.BENJAMIN.GEOFF REY JAYDEN.1547195988 Date: 2026.03.31 10:39:56 -07'00' TOMCO.JOEL.E DWARD.13849 08795 Digitally signed by TOMCO.JOEL.EDWARD.1 384908795 Date: 2026.04.03 10:15:19 -07'00' 2026.04.08 11:09:09 -07'00' -- 1 of 70 -- TABLE OF CONTENTS SECTION TITLE PAGE DIVISION 01 - GENERAL REQUIREMENTS 1 SECTION 01 10 00 - GENERAL PARAGRAPHS 1 SECTION 01 33 00 - SUBMITTALS 17 SECTION 01 35 29 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION 23 SECTION 01 71 23 – FIELD ENGINEERING 40 DIVISION 02 – EXISTING CONDITIONS 45 02 41 13 – MINOR SITE DEMOLITION 45 DIVISION 05 – METALS 48 SECTION 05 50 00 – METAL FABRICATIONS 48 SECTION 05 51 33 – METAL LADDERS 52 DIVISION 09 – FINISHES 53 09 97 18 –PILE CORROSION COATING 53 DIVISION 10 - SPECIALTIES 58 10 81 13 – BIRD CONTROL DEVICES 58 DIVISION 31 - EARTHWORK 60 SECTION 31 62 16 – STEEL PILES 60 APPENDIX A: ATON STRUCTURE LIST 64 APPENDIX B: ATON STRUCTURE PHOTOS AND LOCATIONS 65 APPENDIX C: SUBMITTAL APPROVAL FORM 66 APPENDIX D: USCG MARINE MAMMAL MONITORING PLAN (MMMP) 67 APPENDIX E: SAMPLE GEODETIC SURVEY 68 -- 2 of 70 -- 20041934 Page 1 DIVISION 01 - GENERAL REQUIREMENTS SECTION 01 10 00 - GENERAL PARAGRAPHS PART 1 GENERAL 1.01 PROJECT REQUIREMENTS: A. Provide all materials (excluding Government Furnished Material), labor, equipment and transportation required to accomplish work installing, replacing, or removing ATON structures in the Columbia River Area. Bidders shall hold pricing for 120 days after close of bidding period. Work includes, but is not limited to: 1. Standard ATON Maintenance work which includes removals, replacements, and repairs of damaged ATON structures. See appendix A, appendix B, and this specification for scope requirements. 2. ATON structure fabrication. 3. Surveying of completed range structures to ensure proper positioning. 1.02 CONTRACT SCHEDULE: A. Structures will be constructed within in-water work window limitations. The in water work windows applicable to this project are as follows: 1. Columbia River: 01 November – 28 February 1.03 BASE BID ITEMS: The following items comprise the base bid of this project. Specific details of the base bid items are detailed in Appendix A and Appendix B. The following ten (10) items make up BASE CLIN 0001: A. Stevenson Lower RR LT (LLNR 11830): Demolish & replace w/ epoxy coated 4-pile 10x10 platform with 7x7 tower. Install dayboards, light, safety climbing device, and ladder components in accordance with drawings 6-1, 6-2, 6-3, 8-1, 8-2, 8-3, 8-4, 8-5, 8-6, 8-7, 8-8, 12-3, 12-4, 14-1, 11-1. B. Bonneville Pool LT 22 (LLNR 11855): Demolish & replace w/ -- 3 of 70 -- 20041934 Page 2 epoxy coated MPS w/ 5x5 basket. Install dayboards, light, and ladder components in accordance with drawings 03-1, 11-1, 13-1, 9-2. C. Bonneville Pool LT 23 (LLNR 11860): Demolish & replace w/ epoxy coated MPS w/ reduced header. May be moved within a 30 ft radius of original position. Install dayboards, light, and ladder components in accordance with drawings 3-1, 11-1, 13-1, 9-1. CI. Wind Mountain Upper RF LT 26 (LLNR 11870): Demolish & replace w/ epoxy coated 4-pile 10x10 platform with 7x7 tower. Install dayboards, light, and ladder components in accordance with drawings 6-1, 6-2, 6-3, 8-1, 8-2, 8-3, 8-4, 8-5, 8-6, 8-7, 8-8, 12-3, 12-4, 14-1, 11-1. CII. Wind Mountain Upper RR LT (LLNR 11875): Demolish & replace w/ epoxy coated 4-pile 10x10 platform with 7x7 tower. Install dayboards, light, safety climbing device, and ladder components in accordance with drawings 6-1, 6-2, 6-3, 8-1, 8-2, 8-3, 8-4, 8-5, 8-6, 8-7, 8-8, 12-3, 12-4, 14-1, 11-1. CIII. Fashion Reef Lower RF LT (LLNR 11630): Demolish & replace w/ epoxy coated MPS w/ 7x7 basket. Install dayboards, light, and ladder components in accordance with drawings 4-1, 11-1, 13-1, 12-1, 12-2, 9-3, 14-1. CIV. Fashion Reef Lower RR LT (LLNR 11635): Demolish & replace w/ epoxy coated 4-pile 10x10 platform with 30ft 7x7 tower. Install dayboards, light, and ladder components in accordance with drawings 6-1, 6-2, 6-3, 8-1, 8-2, 8-3, 8-4, 8-5, 8-6, 8-7, 8-8, 12-3, 12-4, 14-1, 11-1. CV. Cascade Rapids Upper RF LT 15 (LLNR 11805): Demolish & replace w/ epoxy coated MPS w/ 7x7 basket. Install dayboards, light, and ladder components in accordance with drawings 04-1, 11-1, 13-1, 12-1, 12-2, 9-3, 14-1. CVI. Elochoman DBN 1 (LLNR 10535): Remove buoy system and replace with epoxy coated SPS w/ reduced header system. Install dayboards, light, and ladder components in accordance with drawings 03-1, 11-1, 13-1, 9-1, 14-1. CVII. Elochoman DBN 2 (LLNR 10540): Demolish & replace with epoxy coated SPS w/ reduced header. Install dayboards, light, and ladder components in accordance with drawings 1-1, 11-1, 13-1, 9-1, 14-1. -- 4 of 70 -- 20041934 Page 3 The following ten (10) items make up BASE CLIN 0002: K. Cathlamet North DBN 4 (LLNR 14750): Remove buoy system and replace with epoxy coated SPS w/ reduced header system. Install dayboards, light, and ladder components in accordance with drawings 01-1, 11-1, 13-1, 9-1. L. Chinook Channel Light 1 (LLNR 14520): Demolish & replace with new epoxy coated MPS w/ reduced header . Install dayboards, light, and ladder components in accordance with drawings 03-1, 11-1, 13-1, 9-1. Conduct Eel grass survey prior to construction in accordance with section 1.14. M. Chinook Channel Light 2 (LLNR 14525): Demolish & replace with epoxy coated SPS w/ reduced header. Install dayboards, light, and ladder components in accordance with drawings 01-1, 11-1, 13-

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237990)