SOURCES SOUGHT: Pulse Generator

COMMERCE, DEPARTMENT OF

Notice type
Sources Sought
Solicitation #
NB672020-26-02355
NAICS
334515
PSC
6625
Posted
July 14, 2026
Response due
July 24, 2026

Description

Requirements / Specification Document TITLE: Pulse Generator Requesting Laboratory / Division / Group: Communications Technology Laboratory Radio Frequency Technology Division Electromagnetic Fields Group (672.02) General Statement of Need: The Electromagnetic Fields Group requires a high-voltage, unipolar pulse generator with a nanosecond pulse width to support Rydberg Research / Multiple OA Projects. Item Specifications and Quantities: Item 1: Pulse Generator Quantity: 1 EACH Specifications: 1.1 Maximum pulse output > 10 kV in 50 Ohms 1.2 100 ps rise time 1.3 3 ns decay time 1.4 Repetition rate 1 kHz 1.5 Single shot Mode 1.6 Output high voltage N-type (HN) 1.7 Internal and external trigger options 1.8 Input power 100 to 240 VAC 50 to 60Hz at <5 amps 1.9 Fits 19” rack 3U 1.10 Weight =< 7.5 kg Vendor Requirements 1. Possess at time of award/contracting an Export Control Classification Number (ECCN). 2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov). Procurement Support Information and Ancillary Services: Section Requirements/Specifications Planning Considerations ☐ List any visits required to allow potential vendors to see site specific constraints. -- 1 of 7 -- Requirements / Specification Document ☒ N/A [Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre- registration 30 days prior to visit.) ☐ Vendor Representative On-Site more than three (3) days. ☐ Other Considerations: [List other considerations to ensure an accurate quote.] Shipping & Delivery ☐ N/A Shipping Address: ☒ NIST-Boulder ATTN: TBA Mail Stop: TBA 325 Broadway Boulder, CO 80305 ☐ NIST-Gaithersburg ATTN: Mail Stop: 100 Bureau Dr Gaithersburg MD 20899 ☐ [Alternate Shipping Address] Shipping Criteria: ☐ Partial Delivery Acceptable ☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement] Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock Containerization Preference: [Enter Container Type] Other Requirements: [List Any Other Requirement] Delivery Date Criteria: ☐ Delivery Shall Be Competed No Later Than: Click or tap to enter a date. ☐ Delivery Shall Be Made No Earlier Than: Click or tap to enter a date. ☐ Scheduled Deliveries: Item Number Due Date -- 2 of 7 -- Requirements / Specification Document ☐ Other: [List Other Shipping, Delivery or Special Requirements.] Electronic Media ☒ N/A [Enter Electronic Media Requirements by Item.] ☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other: [List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery: [Enter Address] Installation ☒ N/A [Enter Installation Requirements by Item] ☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other: [Enter Details] NOTE: TPOC shall be the coordination POC. Facility / Utility Considerations ☒ N/A [List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers [List Work Order Numbers] ☐ Power Available Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] -- 3 of 7 -- Requirements / Specification Document Other Power Considerations: [List Any Other Power Considerations.] ☐ Utility Connections: [List Relevant Available Utilities, Pressure(s) and Flowrate(s).] ☐ Other Considerations: [List Other Considerations to Ensure an Accurate Quote.] Inspection and Acceptance ☐ N/A [Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site ☒ Acceptance Not Expected to Exceed 7 Business Days ☐ Acceptance Expected to Exceed 7 Business Days: [Duration] ☐ Inspection and Acceptance Plan: [Explanation] ☐ Other: [Enter Other Requirements] Training ☒ N/A Training Requirements (Who, When, What, Where) ☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site ☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government: [Describe Materials] ☐ Training Materials to be Provided by Vendor: [Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC. -- 4 of 7 -- Requirements / Specification Document Warranty ☐ N/A Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included? ☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns ☐ Other [Enter Other Requirements] ☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum) Calibration ☒ N/A [Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included? ☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals ☐ Other [Enter Other Requirements] ☐ Requirements: [Enter Requirements] (i.e.: On-Site Within 72 hours, etc.) ☐ 1 Option Period Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods ☐ 3 Option Periods -- 5 of 7 -- Requirements / Specification Document ☐ 4 Option Periods (Maximum) Maintenance ☒ N/A [Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included? ☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals ☐ Other [Enter Other Requirements] ☐ Requirements: [Enter Requirements] (i.e.: On-Site Within 72 hours, etc.) ☐ 1 Option Period Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum) Government

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 334515)