NASA is seeking a total small business set-aside for the procurement of Tescom components to complete the E-3 Component Test Bed at Stennis Space Center in Mississippi. This opportunity is limited to authorized resellers who can supply specific brand-name hardware, including valves, regulators, and gauges, all delivered new and in original packaging. Interested vendors should note that this is a combined synopsis/solicitation, requiring tracking number reference in quotes, and that no installation or fabrication services are included.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
STATEMENT OF WORK
E‑3 Component Test Bed – Hardware Procurement
1. Objective / Requirements
This procurement provides components required to complete the E‑3 Component Test Bed build-
out at NASA Stennis Space Center (SSC).
This procurement is hardware acquisition only. No installation, fabrication, testing, or system
integration services are required.
2. Scope
The contractor shall supply and deliver the full bill of materials (BOM) listed in Section 4. All
components must be delivered new, unused, and in original manufacturer packaging.
This SOW includes:
• Supply of all valves, regulators, gauges, digital instrumentation, filters, check valves,
and specialty hardware
• Delivery to NASA Stennis Space Center
• Verification that all items meet manufacturer specifications and pressure ratings
• No substitutions permitted (Brand Name Justification accompanies this package)
This procurement does not include:
• Installation
• Tubing or piping fabrication
• On‑site assistance
• System checkout or commissioning
3. General Requirements
All supplied hardware shall:
• Match the exact part numbers and quantities specified
• Arrive itemized and labeled for receipt inspection
Each valve shall include one (1) corresponding spare softgoods kit to support maintenance,
refurbishment, and long-term operability. No valve shall be delivered without a matching spare
softgoods kit.
-- 1 of 2 --
4. Bill of Materials (BOM)
Tescom (Subtotal 75)
ER5050FI-1-007 — qty: 6
26-2090T64A27003 — qty: 2
26-2061T64A37016 — qty: 2
26-2062T74A37016 — qty: 3
26-1025-34-271 — qty: 10
26-2061T64S370 — qty: 3
26-1061-64-297 — qty: 3
26-1161-782 — qty: 15
30-1200-312-179 — qty: 6
30-1201-716 — qty: 3
30-1300-708-248 — qty: 17
VGC6PVVV9W9-104 – qty 5
5. Softgoods Requirement
All valves provided under this contract shall include one (1) OEM-approved spare softgoods kit
per valve. Spare softgoods are required to support scheduled maintenance intervals, corrective
rebuilds, and configuration control of pressure-containing hardware. The softgoods kits shall be
identical to those used during manufacturing and must match the exact valve model and revision.
Substitution of non-OEM softgoods is not permitted
6. Deliverables
Delivery of all hardware items listed in Section 4 and 5.
Full packing list and manufacturer certifications where applicable
7. delivery lead time
10 weeks
Delivery Location:
NASA Stennis Space Center
Stennis Space Center, MS 39529
-- 2 of 2 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.