What this opportunity is
The Department of Defense is soliciting bids for the repair of radio test sets, classified under NAICS 334412 and PSC 6625. This opportunity is suitable for small businesses, particularly those with capabilities in electronic equipment repair. Interested vendors should note that the solicitation requires a Repair Turnaround Time (RTAT) of 119 days and includes specific submission requirements, such as pricing and capacity constraints, making it essential to track the solicitation closely for compliance.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CONTACT INFORMATION|4|N7M3.14|ETA |771-229-0478|XAVIER.A.KELLAM.CIV@US.NAVY.MIL|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO|N/A|TO BE DETERMINED (TBD)|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2|||
OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DAYS ARO|
CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
PLEASE SEE THE CONTINUATION PAGE FOR FURTHER DETAILS REGARDING THE PURPOSES OF THIS AMENDMENT.
\
PLEASE SEE THE CONTINUATION PAGE FOR FURTHER DETAILS REGARDING THE PURPOSE(S) OF THIS AMENDMENT.
\
SEE THE CONTINUATION PAGE FOR FURTHER DETAILS REGARDING THE PURPOSES OF THIS AMENDMENT.
\
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 119 DAYS
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Your quote should include the following information:
QUOTE AMOUNT AND RTAT
o Unit Price:__________
o Total Price:__________
o Repair Turnaround Time (RTAT): _______ days
o Number of Days Quote is Valid (ideally 60 days or longer): ________ Days
If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth
regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this
contract.
Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
Return Material Authorization # (RMA), if applicable:__________
Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________
TESTING AND EVALUATION IF BEYOND REPAIR
T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to
exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment.
The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________.
AWARDEE INFO & PERFORMANCE LOCATION
o Awardee CAGE: __________
Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________
Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________
IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW
New unit price:__________
New unit delivery lead-time:__________
OPTION QUANTITY
The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the
option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.
o Please indicate the pricing for the option quantity:
o Price Each: $_____________
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the TEST SET, RADIO .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
3. REQUIREMENTS
3.1 Cage Code/Reference Number Items - The TEST SET, RADIO repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be
performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor
or governm…
Source: SAM.gov, as posted. Verify the current solicitation before responding.